(Removed claim: summary (P836): The applicant plans to carry out an investment consisting of installing solar panels in the existing infrastructure of the Applicant in the location of Barczewo ul. Polish Army 50b ref. no 47/7. The project is designed to construct an overserved photovoltaic installation with the total installed capacity of 26,60 kWp. the installation will be placed on the roof of the building. The design of the installation consists of 95 polycrystalline PV p...) |
(Created claim: summary (P836): The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Barczewo ul. Polish Army 50b Dz. No. 47/7. As part of the project, the construction of a supervised photovoltaic installation with a total capacity of 26.60 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 95 units of polycryst...) |
||||||||||||||
Property / summary | |||||||||||||||
The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Barczewo ul. Polish Army 50b Dz. No. 47/7. As part of the project, the construction of a supervised photovoltaic installation with a total capacity of 26.60 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 95 units of polycrystalline photovoltaic panels with a power output of 280 W, equipped with power optimisations and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and starting work – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English) | |||||||||||||||
Property / summary: The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Barczewo ul. Polish Army 50b Dz. No. 47/7. As part of the project, the construction of a supervised photovoltaic installation with a total capacity of 26.60 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 95 units of polycrystalline photovoltaic panels with a power output of 280 W, equipped with power optimisations and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and starting work – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Barczewo ul. Polish Army 50b Dz. No. 47/7. As part of the project, the construction of a supervised photovoltaic installation with a total capacity of 26.60 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 95 units of polycrystalline photovoltaic panels with a power output of 280 W, equipped with power optimisations and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and starting work – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:10, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RES investments in KORAL |
Project in Poland financed by DG Regio |
Statements
113,050.0 zloty
0 references
133,000.0 zloty
0 references
85.0 percent
0 references
16 March 2020
0 references
30 September 2020
0 references
ZAKŁAD KRAWIECKI "KORAL" AGNIESZKA ŚWIĄTEK
0 references
Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy w lokalizacji Barczewo ul. Wojska Polskiego 50b dz. nr 47/7. W ramach projektu zaplanowano budowę nadachowej instalacji fotowoltaicznej o łącznej mocy zainstalowanych paneli 26,60 kWp Instalacja będzie posadowiona na dachu budynku. Projektowana instalacja składa się z 95 szt. polikrystalicznych paneli fotowoltaicznych o mocy 280 W, wyposażonych w optymalizatory mocy oraz 2 inwertery. Etapy realizacji projektu: - złożenie wniosku o dofinansowanie - podpisanie umowy o dofinansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: - podpisanie umowy - realizacja prac - odbiór końcowy i podpisanie protokołu końcowego Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
0 references
The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Barczewo ul. Polish Army 50b Dz. No. 47/7. As part of the project, the construction of a supervised photovoltaic installation with a total capacity of 26.60 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 95 units of polycrystalline photovoltaic panels with a power output of 280 W, equipped with power optimisations and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and starting work – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0186/17
0 references