Construction of tertiary roadways of guest streets, of chalk, of Wołodyjowskiego, Żuranjowi, perza with a road section in the municipality of Giesrshaft, as a connection of the provincial road of 527 from DK 16 to Olsztyn West node. (Q132701): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project implemented under ITI consists of 3 tasks in the commune of Olsztyn, Jonglei and Gielen: Zad.1.The municipal road No 158017 N from the boundaries of the City of Olsztyn to the junction with DK16 (Giergic), ul. Perkolza (Olsztyn); Zad.2.Section. Żourn ul. Czarnieckiego for the crossing of ul.Cyanki and perocza in Olsztyn (Olsztyn); Zad.3.The municipal road No 157016N from the junction to the intersection with the regional road No 52...)
(‎Created claim: summary (P836): The subject of the project carried out under the ZIT are 3 tasks in the communes of Olsztyn, Jonkowo and Gietrzwałd: Zad.1.Gmina road nr 158017 N from the borders of the City of Olsztyna to the intersection with DK16 (Gietrzwałd), ul. Perk (Olsztyn); Zad.2. Crane from St. Czarnieckiego to the intersection of Ciranki and Perkoza Streets in Olsztyn (Olsztyn); Zad.3.Gmina road no.157016N from the intersection with the voivodeship road no.527 to ul....)
Property / summary
 
The subject of the project carried out under the ZIT are 3 tasks in the communes of Olsztyn, Jonkowo and Gietrzwałd: Zad.1.Gmina road nr 158017 N from the borders of the City of Olsztyna to the intersection with DK16 (Gietrzwałd), ul. Perk (Olsztyn); Zad.2. Crane from St. Czarnieckiego to the intersection of Ciranki and Perkoza Streets in Olsztyn (Olsztyn); Zad.3.Gmina road no.157016N from the intersection with the voivodeship road no.527 to ul.Gościnna, ul Gościnna (Jonkowo), ul. It’s borderline, st. Volodyjowski (Olsztyn). The project covers the construction/reconstruction of roads with a total length of approx. 7.42 km (7.42-value from kilometre), construction of pedestrian and cycle lines, bus bays, intersections, lighting, dehydration, environmental protection devices, greenery, reconstruction of collisions. The project fits into the assumptions set out in the SzOOP RPO WiM by: direct connection of the project line with the TEN-T Comprehensive Network – to which DK16 has been integrated. As a result of the task there will be a homogeneous communication tractor (with convergent parameters) serving the Municipal Functional Area Olsztyn. The road connecting the MOF to the TEN-T network and voivodship road 527 will increase the external accessibility of the area and its internal coherence. Ultimately, the construction of the roads following the implementation of the GDDKiA investment in the construction of the southern ring road Olsztyn in the course of the roads: express S51 and national DK16 will connect directly to the West of the TEN-T network. This will connect part of the MOF to the border crossing in Bezledy and the Olsztyn-Mazury airport. Under the Agreement of 19.04.16, the municipalities jointly carry out the task by Leader-G.Olsztyn and Partners-G.G.Gietrzwald, G.Jonkowo, and will select 1 performer of the study, Inż. Contract and contractor. Each party shall bear the implementation costs corresponding to the size of its part of the project determined on the basis of the tenders of the selected contractors. The leader coordinates the task from signing the agreement, through factual implementation, settlement to durability. (English)
Property / summary: The subject of the project carried out under the ZIT are 3 tasks in the communes of Olsztyn, Jonkowo and Gietrzwałd: Zad.1.Gmina road nr 158017 N from the borders of the City of Olsztyna to the intersection with DK16 (Gietrzwałd), ul. Perk (Olsztyn); Zad.2. Crane from St. Czarnieckiego to the intersection of Ciranki and Perkoza Streets in Olsztyn (Olsztyn); Zad.3.Gmina road no.157016N from the intersection with the voivodeship road no.527 to ul.Gościnna, ul Gościnna (Jonkowo), ul. It’s borderline, st. Volodyjowski (Olsztyn). The project covers the construction/reconstruction of roads with a total length of approx. 7.42 km (7.42-value from kilometre), construction of pedestrian and cycle lines, bus bays, intersections, lighting, dehydration, environmental protection devices, greenery, reconstruction of collisions. The project fits into the assumptions set out in the SzOOP RPO WiM by: direct connection of the project line with the TEN-T Comprehensive Network – to which DK16 has been integrated. As a result of the task there will be a homogeneous communication tractor (with convergent parameters) serving the Municipal Functional Area Olsztyn. The road connecting the MOF to the TEN-T network and voivodship road 527 will increase the external accessibility of the area and its internal coherence. Ultimately, the construction of the roads following the implementation of the GDDKiA investment in the construction of the southern ring road Olsztyn in the course of the roads: express S51 and national DK16 will connect directly to the West of the TEN-T network. This will connect part of the MOF to the border crossing in Bezledy and the Olsztyn-Mazury airport. Under the Agreement of 19.04.16, the municipalities jointly carry out the task by Leader-G.Olsztyn and Partners-G.G.Gietrzwald, G.Jonkowo, and will select 1 performer of the study, Inż. Contract and contractor. Each party shall bear the implementation costs corresponding to the size of its part of the project determined on the basis of the tenders of the selected contractors. The leader coordinates the task from signing the agreement, through factual implementation, settlement to durability. (English) / rank
 
Normal rank
Property / summary: The subject of the project carried out under the ZIT are 3 tasks in the communes of Olsztyn, Jonkowo and Gietrzwałd: Zad.1.Gmina road nr 158017 N from the borders of the City of Olsztyna to the intersection with DK16 (Gietrzwałd), ul. Perk (Olsztyn); Zad.2. Crane from St. Czarnieckiego to the intersection of Ciranki and Perkoza Streets in Olsztyn (Olsztyn); Zad.3.Gmina road no.157016N from the intersection with the voivodeship road no.527 to ul.Gościnna, ul Gościnna (Jonkowo), ul. It’s borderline, st. Volodyjowski (Olsztyn). The project covers the construction/reconstruction of roads with a total length of approx. 7.42 km (7.42-value from kilometre), construction of pedestrian and cycle lines, bus bays, intersections, lighting, dehydration, environmental protection devices, greenery, reconstruction of collisions. The project fits into the assumptions set out in the SzOOP RPO WiM by: direct connection of the project line with the TEN-T Comprehensive Network – to which DK16 has been integrated. As a result of the task there will be a homogeneous communication tractor (with convergent parameters) serving the Municipal Functional Area Olsztyn. The road connecting the MOF to the TEN-T network and voivodship road 527 will increase the external accessibility of the area and its internal coherence. Ultimately, the construction of the roads following the implementation of the GDDKiA investment in the construction of the southern ring road Olsztyn in the course of the roads: express S51 and national DK16 will connect directly to the West of the TEN-T network. This will connect part of the MOF to the border crossing in Bezledy and the Olsztyn-Mazury airport. Under the Agreement of 19.04.16, the municipalities jointly carry out the task by Leader-G.Olsztyn and Partners-G.G.Gietrzwald, G.Jonkowo, and will select 1 performer of the study, Inż. Contract and contractor. Each party shall bear the implementation costs corresponding to the size of its part of the project determined on the basis of the tenders of the selected contractors. The leader coordinates the task from signing the agreement, through factual implementation, settlement to durability. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:47, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of tertiary roadways of guest streets, of chalk, of Wołodyjowskiego, Żuranjowi, perza with a road section in the municipality of Giesrshaft, as a connection of the provincial road of 527 from DK 16 to Olsztyn West node.
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    26,041,539.07 zloty
    0 references
    6,249,969.38 Euro
    13 January 2020
    0 references
    34,722,052.1 zloty
    0 references
    8,333,292.5 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    22 April 2016
    0 references
    30 November 2019
    0 references
    GMINA OLSZTYN
    0 references
    0 references

    53°46'36.1"N, 20°28'40.1"E
    0 references

    53°44'52.8"N, 20°14'3.8"E
    0 references

    53°49'39.4"N, 20°18'37.8"E
    0 references
    Przedmiotem projektu realizowanego w ramach ZIT są 3 zadania na terenie Gminy Olsztyn, Jonkowo i Gietrzwałd: Zad.1.Droga gminna nr 158017 N od granic Miasta Olsztyna do skrzyżowania z DK16 (Gietrzwałd), ul. Perkoza (Olsztyn); Zad.2.Odcinek ul. Żurawiej od ul. Czarnieckiego do skrzyżowania ul.Cyranki i Perkoza w Olsztynie (Olsztyn); Zad.3.Droga gminna nr 157016N od skrzyżowania z drogą wojewódzką nr 527 do ul.Gościnnej, ul Gościnna (Jonkowo), ul. Kresowa, ul. Wołodyjowskiego (Olsztyn). Przedsięwzięcie zakresem obejmuje budowę/przebudowę dróg o łącznej dł. ok. 7,42 km (7,42-wartość z kilometrażu) , budowę ciągów pieszych i rowerowych, zatok autobusowych, skrzyżowań, oświetlenia, odwodnienia, urządzeń ochrony środowiska, zagosp. zieleni, przebudowy kolizji. Projekt wpisuje się w założenia określone w SzOOP RPO WiM poprzez: bezpośrednie połączenie ciągu objętego zakresem projektu z siecią kompleksową TEN-T–do której włączona została DK16. W wyniku zadania powstanie jednorodny ciąg komunikacyjny (o zbieżnych parametrach) obsługujący Miejski Obszar Funkcjonalny Olsztyna. Droga łącząca MOF z siecią TEN-T i drogą wojewódzką nr 527 zwiększy zewnętrzną dostępność obszaru i jego wewnętrzną spójność. Docelowo budowany ciąg dróg po realizacji inwestycji GDDKiA budowy obwodnicy południowej Olsztyna w ciągu dróg: ekspresowej S51 i krajowej DK16 łączył się będzie bezpośrednio z węzłem Zachód sieci TEN-T. Dzięki temu skomunikuje pn-zach część MOF z przejściem granicznym w Bezledach oraz portem lotniczym Olsztyn-Mazury. Na mocy Porozumienia z 19.04.16r. gminy wspólnie realizują zadanie przez Lidera–G.Olsztyn i Partnerów–G.Gietrzwałd, G.Jonkowo, wybiorą 1 wykonawcę studium wyk., Inż. Kontraktu i wykonawcę robót. Każda ze stron ponosi koszty realizacji w wielkości odpowiadającej wielkości swojej części projektu ustalonej na podstawie ofert wybranych wykonawców. Lider koordynuje zadanie od podpisania porozumienia, przez realizację rzeczową, rozliczenie aż do okresu trwałości. (Polish)
    0 references
    The subject of the project carried out under the ZIT are 3 tasks in the communes of Olsztyn, Jonkowo and Gietrzwałd: Zad.1.Gmina road nr 158017 N from the borders of the City of Olsztyna to the intersection with DK16 (Gietrzwałd), ul. Perk (Olsztyn); Zad.2. Crane from St. Czarnieckiego to the intersection of Ciranki and Perkoza Streets in Olsztyn (Olsztyn); Zad.3.Gmina road no.157016N from the intersection with the voivodeship road no.527 to ul.Gościnna, ul Gościnna (Jonkowo), ul. It’s borderline, st. Volodyjowski (Olsztyn). The project covers the construction/reconstruction of roads with a total length of approx. 7.42 km (7.42-value from kilometre), construction of pedestrian and cycle lines, bus bays, intersections, lighting, dehydration, environmental protection devices, greenery, reconstruction of collisions. The project fits into the assumptions set out in the SzOOP RPO WiM by: direct connection of the project line with the TEN-T Comprehensive Network – to which DK16 has been integrated. As a result of the task there will be a homogeneous communication tractor (with convergent parameters) serving the Municipal Functional Area Olsztyn. The road connecting the MOF to the TEN-T network and voivodship road 527 will increase the external accessibility of the area and its internal coherence. Ultimately, the construction of the roads following the implementation of the GDDKiA investment in the construction of the southern ring road Olsztyn in the course of the roads: express S51 and national DK16 will connect directly to the West of the TEN-T network. This will connect part of the MOF to the border crossing in Bezledy and the Olsztyn-Mazury airport. Under the Agreement of 19.04.16, the municipalities jointly carry out the task by Leader-G.Olsztyn and Partners-G.G.Gietrzwald, G.Jonkowo, and will select 1 performer of the study, Inż. Contract and contractor. Each party shall bear the implementation costs corresponding to the size of its part of the project determined on the basis of the tenders of the selected contractors. The leader coordinates the task from signing the agreement, through factual implementation, settlement to durability. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.07.02.01-28-0003/16
    0 references