Reconstruction of the buildings of the former brewery at ul. Siennińska 54 in Ostrowiec Świętokrzyski for the cultural institutions — the Urban Library, the Urban Culture Centre and the Artistic Office. (Q127849): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of the redevelopment of the 1908 buildings of the former brewery for cultural institutions: The Urban Cultural Centre, the Urban Library, the Public Library and the Artistic Exhibition Office. At present, in part of the facility, the MCK and BWA are located, while a significant part is not used and is in poor technical condition. The aim of the measures adopted is to give prominence to the value of the architectural and hi...) |
(Created claim: summary (P836): The project consists of the reconstruction of the former brewery, dating from 1908, for the needs of cultural institutions: The City Centre for Culture, the Municipal Public Library and the Office of Art Exhibitions. Currently, there are MCK and BWA in part of the facility, but much of it is unused and is in poor technical condition. The aim of the adopted solutions is to highlight the architectural and historical values of the building, in orde...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of the reconstruction of the former brewery, dating from 1908, for the needs of cultural institutions: The City Centre for Culture, the Municipal Public Library and the Office of Art Exhibitions. Currently, there are MCK and BWA in part of the facility, but much of it is unused and is in poor technical condition. The aim of the adopted solutions is to highlight the architectural and historical values of the building, in order to preserve the character of the former site and adapt the facility to conduct cultural activities. In the facility with area of use approx. 5.5 thousand sqm will include, among others, reception, tourist inf. point, library, reading rooms, 2 multifunctional rooms, 4 BWA exhibition rooms, photo gallery, conference room, music hall, MCK studios: plastic, modeling, computer graphics, chess club, office rooms. The project involves the purchase of equipment for 3 cultural institutes. The individual functions of the complex have been arranged so that institutions can function independently of each other. The complex will be used for the statutory activity of units and has commercial elements (coffee bar, artist’s product sales gallery, summer sales gallery in the courtyard, meeting room and multifunctional room). The aim of the project is to increase the availability of cultural resources of the region and the city by improving the conditions for the functioning of cultural institutions. As a result of the project, 3 cultural institutions will be supported, in which the number of visits will increase from 33219 to 37800 people/year, employment will increase from 40 to 45 jobs, 2 people will be hired under contract, 1 facility will be adapted to the needs of people with disabilities. The project will finance the costs of rational improvements for people with disabilities. Thermal retrofitting works are also planned for the amount of PLN 1770239.38, which represents 10.17 % of the eligible costs of the project. (English) | |||||||||||||||
Property / summary: The project consists of the reconstruction of the former brewery, dating from 1908, for the needs of cultural institutions: The City Centre for Culture, the Municipal Public Library and the Office of Art Exhibitions. Currently, there are MCK and BWA in part of the facility, but much of it is unused and is in poor technical condition. The aim of the adopted solutions is to highlight the architectural and historical values of the building, in order to preserve the character of the former site and adapt the facility to conduct cultural activities. In the facility with area of use approx. 5.5 thousand sqm will include, among others, reception, tourist inf. point, library, reading rooms, 2 multifunctional rooms, 4 BWA exhibition rooms, photo gallery, conference room, music hall, MCK studios: plastic, modeling, computer graphics, chess club, office rooms. The project involves the purchase of equipment for 3 cultural institutes. The individual functions of the complex have been arranged so that institutions can function independently of each other. The complex will be used for the statutory activity of units and has commercial elements (coffee bar, artist’s product sales gallery, summer sales gallery in the courtyard, meeting room and multifunctional room). The aim of the project is to increase the availability of cultural resources of the region and the city by improving the conditions for the functioning of cultural institutions. As a result of the project, 3 cultural institutions will be supported, in which the number of visits will increase from 33219 to 37800 people/year, employment will increase from 40 to 45 jobs, 2 people will be hired under contract, 1 facility will be adapted to the needs of people with disabilities. The project will finance the costs of rational improvements for people with disabilities. Thermal retrofitting works are also planned for the amount of PLN 1770239.38, which represents 10.17 % of the eligible costs of the project. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of the reconstruction of the former brewery, dating from 1908, for the needs of cultural institutions: The City Centre for Culture, the Municipal Public Library and the Office of Art Exhibitions. Currently, there are MCK and BWA in part of the facility, but much of it is unused and is in poor technical condition. The aim of the adopted solutions is to highlight the architectural and historical values of the building, in order to preserve the character of the former site and adapt the facility to conduct cultural activities. In the facility with area of use approx. 5.5 thousand sqm will include, among others, reception, tourist inf. point, library, reading rooms, 2 multifunctional rooms, 4 BWA exhibition rooms, photo gallery, conference room, music hall, MCK studios: plastic, modeling, computer graphics, chess club, office rooms. The project involves the purchase of equipment for 3 cultural institutes. The individual functions of the complex have been arranged so that institutions can function independently of each other. The complex will be used for the statutory activity of units and has commercial elements (coffee bar, artist’s product sales gallery, summer sales gallery in the courtyard, meeting room and multifunctional room). The aim of the project is to increase the availability of cultural resources of the region and the city by improving the conditions for the functioning of cultural institutions. As a result of the project, 3 cultural institutions will be supported, in which the number of visits will increase from 33219 to 37800 people/year, employment will increase from 40 to 45 jobs, 2 people will be hired under contract, 1 facility will be adapted to the needs of people with disabilities. The project will finance the costs of rational improvements for people with disabilities. Thermal retrofitting works are also planned for the amount of PLN 1770239.38, which represents 10.17 % of the eligible costs of the project. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 15:26, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the buildings of the former brewery at ul. Siennińska 54 in Ostrowiec Świętokrzyski for the cultural institutions — the Urban Library, the Urban Culture Centre and the Artistic Office. |
Project in Poland financed by DG Regio |
Statements
13,031,358.07 zloty
0 references
17,375,144.09 zloty
0 references
75.0 percent
0 references
2 December 2015
0 references
31 July 2019
0 references
GMINA OSTROWIEC ŚWIĘTOKRZYSKI
0 references
Projekt polega na przebudowie pochodzących z 1908r. budynków dawnego browaru na potrzeby instytucji kultury: Miejskiego Centrum Kultury, Miejskiej Biblioteki Publicznej i Biura Wystaw Artystycznych. Obecnie w części obiektu znajduje się MCK i BWA, natomiast znaczna część jest niewykorzystana i znajduje się w złym stanie technicznym. Celem przyjętych rozwiązań jest wyeksponowanie walorów architektoniczno–historycznych budynku, aby zachować charakter dawnej zabudowy terenu i dostosowanie obiektu do prowadzenia działalności kulturalnej. W obiekcie o pow. użytk. ok. 5,5 tys.m2 znajdą się m.in. recepcja, punkt inf. turyst., biblioteka, czytelnie, 2 sale wielofunkcyjne, 4 sale wystawiennicze BWA, galeria fotografii, sala konferencyjna, sale muzyczne, pracownie MCK: plastyczna, modelarstwa, grafiki komputerowej, klubu szachowego, pokoje biur. i administr., pomieszczenia gospod. Projekt zakłada zakup wyposażenia dla 3 instyt. kultury. Poszczególne funkcje kompleksu zostały tak rozmieszczone, aby instytucje mogły funkcjonować niezależnie od siebie. Kompleks będzie służył do działalności statutowej jednostek oraz posiadał elementy komercyjne (barek kawowy, galeria sprzedaży wyrobów artyst., letnia galerii sprzedaży na dziedzińcu, najem sali konferencyjnej i wielofunkcyjnej). Celem projektu jest zwiększenie dostępności zasobów kulturowych regionu i miasta poprzez poprawę warunków funkcjonowania instyt. kultury. W wyniku realizacji projektu wsparciem zostaną objęte 3 instyt. kultury, w których liczba odwiedzin wzrośnie z 33219 do 37800 osób/rok, zatrudnienie wzrośnie z 40 do 45 etatów, 2 osoby zostaną zatrudnione na umowę zlecenie, 1 obiekt zostanie dostosowany do potrzeb osób z niepełnosprawnościami. W projekcie sfinansowane zostaną koszty racjonalnych usprawnień dla osób niepełnosprawnych. Zaplanowano również prace termomodernizacyjne na kwotę 1770239,38 zł, co stanowi 10,17 % kosztów kwalifikowalnych projektu. (Polish)
0 references
The project consists of the reconstruction of the former brewery, dating from 1908, for the needs of cultural institutions: The City Centre for Culture, the Municipal Public Library and the Office of Art Exhibitions. Currently, there are MCK and BWA in part of the facility, but much of it is unused and is in poor technical condition. The aim of the adopted solutions is to highlight the architectural and historical values of the building, in order to preserve the character of the former site and adapt the facility to conduct cultural activities. In the facility with area of use approx. 5.5 thousand sqm will include, among others, reception, tourist inf. point, library, reading rooms, 2 multifunctional rooms, 4 BWA exhibition rooms, photo gallery, conference room, music hall, MCK studios: plastic, modeling, computer graphics, chess club, office rooms. The project involves the purchase of equipment for 3 cultural institutes. The individual functions of the complex have been arranged so that institutions can function independently of each other. The complex will be used for the statutory activity of units and has commercial elements (coffee bar, artist’s product sales gallery, summer sales gallery in the courtyard, meeting room and multifunctional room). The aim of the project is to increase the availability of cultural resources of the region and the city by improving the conditions for the functioning of cultural institutions. As a result of the project, 3 cultural institutions will be supported, in which the number of visits will increase from 33219 to 37800 people/year, employment will increase from 40 to 45 jobs, 2 people will be hired under contract, 1 facility will be adapted to the needs of people with disabilities. The project will finance the costs of rational improvements for people with disabilities. Thermal retrofitting works are also planned for the amount of PLN 1770239.38, which represents 10.17 % of the eligible costs of the project. (English)
21 October 2020
0 references
Identifiers
RPSW.04.04.00-26-0042/15
0 references