(Removed claim: summary (P836): The project consists of the redevelopment of the water supply network and the construction of a sewage network on the ground. Sunny and solar in Zimint, in the Municipality of Munitions, and included them in the already existing sections of the water-based network at ulica Zielinski at ul. Mikulczycka, Solar and Spacerowa. The length of the water mains network is 760.33 m and 205.29 m connections and the length of the sewage system is 716.59 m...) |
(Created claim: summary (P836): The project consists of the reconstruction of the water supply network and the construction of a sewerage network in the area of ul. Polna and Słoneczna w Ziemięcice in the commune of Zbrosławice and their inclusion in existing sections of the water-can network in Ziemięcice on ul. Mikulczycka, Sunny and Walking. The length of the water supply system is 760.33 m and 205.29 m of connections, while the length of the sewage network is 716.59 m with...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of the reconstruction of the water supply network and the construction of a sewerage network in the area of ul. Polna and Słoneczna w Ziemięcice in the commune of Zbrosławice and their inclusion in existing sections of the water-can network in Ziemięcice on ul. Mikulczycka, Sunny and Walking. The length of the water supply system is 760.33 m and 205.29 m of connections, while the length of the sewage network is 716.59 m with 29 sewage wells. (English) | |||||||||||||||
Property / summary: The project consists of the reconstruction of the water supply network and the construction of a sewerage network in the area of ul. Polna and Słoneczna w Ziemięcice in the commune of Zbrosławice and their inclusion in existing sections of the water-can network in Ziemięcice on ul. Mikulczycka, Sunny and Walking. The length of the water supply system is 760.33 m and 205.29 m of connections, while the length of the sewage network is 716.59 m with 29 sewage wells. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of the reconstruction of the water supply network and the construction of a sewerage network in the area of ul. Polna and Słoneczna w Ziemięcice in the commune of Zbrosławice and their inclusion in existing sections of the water-can network in Ziemięcice on ul. Mikulczycka, Sunny and Walking. The length of the water supply system is 760.33 m and 205.29 m of connections, while the length of the sewage network is 716.59 m with 29 sewage wells. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 12:29, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a water mains and a sanitary sewage system in Zielinski ul. Post and solar |
Project in Poland financed by DG Regio |
Statements
552,425.0 zloty
0 references
1,377,962.13 zloty
0 references
40.09 percent
0 references
14 December 2017
0 references
31 December 2018
0 references
GMINA ZBROSŁAWICE
0 references
Projekt polega na przebudowie sieci wodociagowej i budowie sieci kanalizacyjnej na terenie ul. Polnej i Słonecznej w Ziemięcicach w gminie Zbrosławice i włączeniu ich do istniejących już odcinków sieci wod-kan w Ziemięcicach przy ul. Mikulczyckiej, Słonecznej i Spacerowej. Długość sieci wodociągowej to 760,33m i 205,29m przyłączy, zaś długość sieci kanalizacyjnej to 716,59m z 29 studzienkami kanalizacyjnymi. (Polish)
0 references
The project consists of the reconstruction of the water supply network and the construction of a sewerage network in the area of ul. Polna and Słoneczna w Ziemięcice in the commune of Zbrosławice and their inclusion in existing sections of the water-can network in Ziemięcice on ul. Mikulczycka, Sunny and Walking. The length of the water supply system is 760.33 m and 205.29 m of connections, while the length of the sewage network is 716.59 m with 29 sewage wells. (English)
21 October 2020
0 references
Identifiers
RPSL.05.01.01-24-07A7/16
0 references