THERMAL MODERNISATION OF THE SCHOOL BUILDING AT UL. GREY SERIES 6 IN SUCHEDNIÓW (Q127625): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): In line with energy audits and energy efficiency, the planned scope of work includes modernisation of partitions: Outer ceiling: thickness of the thermal insulation layer required: 24 cm — DACH, External Stricent — required thickness of the thermal insulation layer: 16 cm — FASADA, Strict, external floor plate: 9 cm — FASADA, external hall — required thickness of the thermal insulation layer: 13 cm — ACH and modernisation of compartment: windo...)
(‎Created claim: summary (P836): According to energy audits and energy efficiency, the planned scope of work includes the modernisation of partitions: Outer ceiling – required thickness of the thermal insulation layer: 24 cm – DACH, Outside wall – required thermal insulation layer thickness: 16 cm – facade, outer wall hall – required thickness. thermal insulation layer: 9 cm – facade, outer ceiling hall – required thickness of thermal insulation layer: 13 cm – DACH and modernis...)
Property / summary
 
According to energy audits and energy efficiency, the planned scope of work includes the modernisation of partitions: Outer ceiling – required thickness of the thermal insulation layer: 24 cm – DACH, Outside wall – required thermal insulation layer thickness: 16 cm – facade, outer wall hall – required thickness. thermal insulation layer: 9 cm – facade, outer ceiling hall – required thickness of thermal insulation layer: 13 cm – DACH and modernisation of the group of partitions:Windows 2,3" ‘Gravitational centrifuge’ – required U coefficient for the new joinery: 0,900 W/(m2xK), Windows 1,8" ‘Gravitational centrifuge’ – U coefficient required for the new joinery: 0,900 W/(m2xK), “Door” ‘Gravitational centrifuge’ – the required U coefficient for the new woodworking: 1,300 W/(m2xK). The works also include modernisation of the heating system – replacement of the heating network, replacement of radiators, installation of thermostatic valves, commissioning of the weather control system, – replacement of internal incandescent and fluorescent luminaires with LED luminaires, – installation of PV panels (photovoltaics) to produce electricity for own use, installation of 39 kW. The project is in line with the specific objectives for priority axis 3 and the objective of Action 3.3 – Increased energy efficiency of public buildings and the housing sector. Indicators achieved as a result of the project – product: Estimated annual decrease in greenhouse gas emissions of 322.56 tonnes CO2/year, Number of built electricity generation units from RES 1 units, Number of energy upgraded buildings 1 units, Use area of buildings undergoing thermal modernisation 2184.40 m², Reduction of annual primary energy consumption in public buildings 1042751 kWh/year and the result: Amount of electricity saved 20,65 MWh/year, The amount of thermal energy saved 2916.44 GJ/year, Reduction of final energy consumption as a result of projects 2991,76 GJ/year (English)
Property / summary: According to energy audits and energy efficiency, the planned scope of work includes the modernisation of partitions: Outer ceiling – required thickness of the thermal insulation layer: 24 cm – DACH, Outside wall – required thermal insulation layer thickness: 16 cm – facade, outer wall hall – required thickness. thermal insulation layer: 9 cm – facade, outer ceiling hall – required thickness of thermal insulation layer: 13 cm – DACH and modernisation of the group of partitions:Windows 2,3" ‘Gravitational centrifuge’ – required U coefficient for the new joinery: 0,900 W/(m2xK), Windows 1,8" ‘Gravitational centrifuge’ – U coefficient required for the new joinery: 0,900 W/(m2xK), “Door” ‘Gravitational centrifuge’ – the required U coefficient for the new woodworking: 1,300 W/(m2xK). The works also include modernisation of the heating system – replacement of the heating network, replacement of radiators, installation of thermostatic valves, commissioning of the weather control system, – replacement of internal incandescent and fluorescent luminaires with LED luminaires, – installation of PV panels (photovoltaics) to produce electricity for own use, installation of 39 kW. The project is in line with the specific objectives for priority axis 3 and the objective of Action 3.3 – Increased energy efficiency of public buildings and the housing sector. Indicators achieved as a result of the project – product: Estimated annual decrease in greenhouse gas emissions of 322.56 tonnes CO2/year, Number of built electricity generation units from RES 1 units, Number of energy upgraded buildings 1 units, Use area of buildings undergoing thermal modernisation 2184.40 m², Reduction of annual primary energy consumption in public buildings 1042751 kWh/year and the result: Amount of electricity saved 20,65 MWh/year, The amount of thermal energy saved 2916.44 GJ/year, Reduction of final energy consumption as a result of projects 2991,76 GJ/year (English) / rank
 
Normal rank
Property / summary: According to energy audits and energy efficiency, the planned scope of work includes the modernisation of partitions: Outer ceiling – required thickness of the thermal insulation layer: 24 cm – DACH, Outside wall – required thermal insulation layer thickness: 16 cm – facade, outer wall hall – required thickness. thermal insulation layer: 9 cm – facade, outer ceiling hall – required thickness of thermal insulation layer: 13 cm – DACH and modernisation of the group of partitions:Windows 2,3" ‘Gravitational centrifuge’ – required U coefficient for the new joinery: 0,900 W/(m2xK), Windows 1,8" ‘Gravitational centrifuge’ – U coefficient required for the new joinery: 0,900 W/(m2xK), “Door” ‘Gravitational centrifuge’ – the required U coefficient for the new woodworking: 1,300 W/(m2xK). The works also include modernisation of the heating system – replacement of the heating network, replacement of radiators, installation of thermostatic valves, commissioning of the weather control system, – replacement of internal incandescent and fluorescent luminaires with LED luminaires, – installation of PV panels (photovoltaics) to produce electricity for own use, installation of 39 kW. The project is in line with the specific objectives for priority axis 3 and the objective of Action 3.3 – Increased energy efficiency of public buildings and the housing sector. Indicators achieved as a result of the project – product: Estimated annual decrease in greenhouse gas emissions of 322.56 tonnes CO2/year, Number of built electricity generation units from RES 1 units, Number of energy upgraded buildings 1 units, Use area of buildings undergoing thermal modernisation 2184.40 m², Reduction of annual primary energy consumption in public buildings 1042751 kWh/year and the result: Amount of electricity saved 20,65 MWh/year, The amount of thermal energy saved 2916.44 GJ/year, Reduction of final energy consumption as a result of projects 2991,76 GJ/year (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:16, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
THERMAL MODERNISATION OF THE SCHOOL BUILDING AT UL. GREY SERIES 6 IN SUCHEDNIÓW
Project in Poland financed by DG Regio

    Statements

    0 references
    1,492,022.31 zloty
    0 references
    358,085.35 Euro
    13 January 2020
    0 references
    1,755,320.37 zloty
    0 references
    421,276.89 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 October 2016
    0 references
    30 September 2020
    0 references
    GMINA SUCHEDNIÓW
    0 references
    Zgodnie z Audytami energetycznym i efektywności energetycznej planowany zakres prac obejmuje modernizację przegród: Strop zewnętrzny – wymagana grubość warstwy izolacji termicznej: 24 cm – DACH, Ściana zewnętrzna – wymagana grubość warstwy izolacji termicznej: 16 cm – FASADA, Ściana zewnętrza sala – wymagana grubość . warstwy izolacji termicznej: 9 cm – FASADA, Strop zewnętrzny sala – wymagana grubość warstwy izolacji termicznej: 13 cm – DACH oraz modernizację grupy przegród :Okna 2,3” ‘Wentylacja grawitacyjna’ – wymagany współczynnik U dla nowej stolarki: 0,900 W/(m2xK), Okna 1,8” ‘Wentylacja grawitacyjna’ - wymagany współczynnik U dla nowej stolarki: 0,900 W/(m2xK), „Drzwi” ‘Wentylacja grawitacyjna’ - wymagany współczynnik U dla nowej stolarki: 1,300 W/(m2xK). Prace obejmują także modernizację instalacji grzewczej – wymiana wew. sieci c.o., wymianę grzejników, montaż zaworów termostatycznych, uruchomienie systemu regulacji pogodowej, - wymianę opraw oświetleniowych wewnętrznych żarowych i świetlówkowych na oprawy LED, - montaż paneli PV (fotowoltaika) w celu produkcji energii elektrycznej na potrzeby własne, instalacja o wielkości 39 kW. Projekt jest zgodny z celami szczegółowymi dla osi priorytetowej 3 oraz celem działania 3.3 - Zwiększona efektywność energetyczna budynków publicznych oraz sektora mieszkaniowego. Wskaźniki osiągnięte w wyniku realizacji projektu - produktu: Szacowany roczny spadek emisji gazów cieplarnianych 322,56 tony równoważnika CO2/rok, Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE 1 szt., Liczba zmodernizowanych energetycznie budynków 1 szt., Powierzchnia użytkowa budynków poddanych termomodernizacji 2184,40 m2, Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych 1042751 kWh/rok oraz rezultatu: Ilość zaoszczędzonej energii elektrycznej 20,65 MWh/rok, Ilość zaoszczędzonej energii cieplnej 2916,44 GJ/rok, Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów 2991,76 GJ/rok (Polish)
    0 references
    According to energy audits and energy efficiency, the planned scope of work includes the modernisation of partitions: Outer ceiling – required thickness of the thermal insulation layer: 24 cm – DACH, Outside wall – required thermal insulation layer thickness: 16 cm – facade, outer wall hall – required thickness. thermal insulation layer: 9 cm – facade, outer ceiling hall – required thickness of thermal insulation layer: 13 cm – DACH and modernisation of the group of partitions:Windows 2,3" ‘Gravitational centrifuge’ – required U coefficient for the new joinery: 0,900 W/(m2xK), Windows 1,8" ‘Gravitational centrifuge’ – U coefficient required for the new joinery: 0,900 W/(m2xK), “Door” ‘Gravitational centrifuge’ – the required U coefficient for the new woodworking: 1,300 W/(m2xK). The works also include modernisation of the heating system – replacement of the heating network, replacement of radiators, installation of thermostatic valves, commissioning of the weather control system, – replacement of internal incandescent and fluorescent luminaires with LED luminaires, – installation of PV panels (photovoltaics) to produce electricity for own use, installation of 39 kW. The project is in line with the specific objectives for priority axis 3 and the objective of Action 3.3 – Increased energy efficiency of public buildings and the housing sector. Indicators achieved as a result of the project – product: Estimated annual decrease in greenhouse gas emissions of 322.56 tonnes CO2/year, Number of built electricity generation units from RES 1 units, Number of energy upgraded buildings 1 units, Use area of buildings undergoing thermal modernisation 2184.40 m², Reduction of annual primary energy consumption in public buildings 1042751 kWh/year and the result: Amount of electricity saved 20,65 MWh/year, The amount of thermal energy saved 2916.44 GJ/year, Reduction of final energy consumption as a result of projects 2991,76 GJ/year (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.03.03.00-26-0010/16