Construction of the Integrated Neighbours Centre in Imilinie (Q124075): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The planned connecting traffic centre will be located in the area of the railway station of PKP in Imilinie Street at ul. Dunikowski and ul. Hallera. As part of stage I of the investment (area between ul. The Xavere Dunikowski and the railway line), which is covered by this proposal, are scheduled to carry out the following work: Rebuilding of the 2 existing exits from ul. Dounkowski, — removal of the existing exit from ul. Mr Dounkowski, — co...)
(‎Created claim: summary (P836): The proposed interchange centre includes a location in the area of the railway station in Imielin, on a street. Dunikowskiego and ul. It’s Hallera. As part of stage I of the investment (area between ul. Xavier Dunikowski and the railway line covered by this proposal are planned to carry out the following work: — reconstruction of 2 existing exits from ul. Dunikowskiego, – liquidation of the existing exit from ul. Dunikowskiego, – construction an...)
Property / summary
 
The proposed interchange centre includes a location in the area of the railway station in Imielin, on a street. Dunikowskiego and ul. It’s Hallera. As part of stage I of the investment (area between ul. Xavier Dunikowski and the railway line covered by this proposal are planned to carry out the following work: — reconstruction of 2 existing exits from ul. Dunikowskiego, – liquidation of the existing exit from ul. Dunikowskiego, – construction and reconstruction of parking stations at ul. Dunikowskiego, – designing a passage through the street. Dunikowskiego at the height of the interchange centre, – changing the location of the existing passage through ul. Dunikowski in connection with the reconstruction of exit No. 1, – construction of internal roads, – construction of parking stations by internal roads, – construction of pavements and squares, – construction of parking stations for single-tracks, – construction of bus and bus stop stations, – construction of a commercial pavilion with public toilets, – construction of a sheltered stop. (English)
Property / summary: The proposed interchange centre includes a location in the area of the railway station in Imielin, on a street. Dunikowskiego and ul. It’s Hallera. As part of stage I of the investment (area between ul. Xavier Dunikowski and the railway line covered by this proposal are planned to carry out the following work: — reconstruction of 2 existing exits from ul. Dunikowskiego, – liquidation of the existing exit from ul. Dunikowskiego, – construction and reconstruction of parking stations at ul. Dunikowskiego, – designing a passage through the street. Dunikowskiego at the height of the interchange centre, – changing the location of the existing passage through ul. Dunikowski in connection with the reconstruction of exit No. 1, – construction of internal roads, – construction of parking stations by internal roads, – construction of pavements and squares, – construction of parking stations for single-tracks, – construction of bus and bus stop stations, – construction of a commercial pavilion with public toilets, – construction of a sheltered stop. (English) / rank
 
Normal rank
Property / summary: The proposed interchange centre includes a location in the area of the railway station in Imielin, on a street. Dunikowskiego and ul. It’s Hallera. As part of stage I of the investment (area between ul. Xavier Dunikowski and the railway line covered by this proposal are planned to carry out the following work: — reconstruction of 2 existing exits from ul. Dunikowskiego, – liquidation of the existing exit from ul. Dunikowskiego, – construction and reconstruction of parking stations at ul. Dunikowskiego, – designing a passage through the street. Dunikowskiego at the height of the interchange centre, – changing the location of the existing passage through ul. Dunikowski in connection with the reconstruction of exit No. 1, – construction of internal roads, – construction of parking stations by internal roads, – construction of pavements and squares, – construction of parking stations for single-tracks, – construction of bus and bus stop stations, – construction of a commercial pavilion with public toilets, – construction of a sheltered stop. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:38, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the Integrated Neighbours Centre in Imilinie
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    859,463.66 zloty
    0 references
    206,271.28 Euro
    13 January 2020
    0 references
    1,802,566.4 zloty
    0 references
    432,615.94 Euro
    13 January 2020
    0 references
    47.68 percent
    0 references
    19 September 2016
    0 references
    28 December 2018
    0 references
    MIASTO IMIELIN
    0 references
    0 references

    50°8'38.8"N, 19°12'9.4"E
    0 references
    Projektowane centrum przesiadkowe obejmuje lokalizację w rejonie dworca PKP w Imielinie przy ul. Dunikowskiego oraz ul. Hallera. W ramach etapu I inwestycji (obszar między ul. Xawerego Dunikowskiego a linia kolejową ), objętego niniejszym wnioskiem zaplanowano realizację następujących prac: - przebudowa 2 istniejących zjazdów z ul. Dunikowskiego, - likwidacja istniejącego zjazdu z ul. Dunikowskiego, - budowa i przebudowa stanowisk postojowych przy ul. Dunikowskiego, - zaprojektowanie przejścia przez jezdnię ul. Dunikowskiego na wysokości centrum przesiadkowego, - zmiana lokalizacji istniejącego przejścia przez ul. Dunikowskiego w związku z przebudową zjazdu nr 1, - budowa dróg wewnętrznych, - budowa stanowisk postojowych przy drogach wewnętrznych, - budowa chodników i placyków, - budowa stanowisk postojowych dla jednośladów, - budowa stanowisk postoju busów i autobusów, - budowa pawilonu handlowego z toaletami publicznymi, - budowa wiaty przystankowej. (Polish)
    0 references
    The proposed interchange centre includes a location in the area of the railway station in Imielin, on a street. Dunikowskiego and ul. It’s Hallera. As part of stage I of the investment (area between ul. Xavier Dunikowski and the railway line covered by this proposal are planned to carry out the following work: — reconstruction of 2 existing exits from ul. Dunikowskiego, – liquidation of the existing exit from ul. Dunikowskiego, – construction and reconstruction of parking stations at ul. Dunikowskiego, – designing a passage through the street. Dunikowskiego at the height of the interchange centre, – changing the location of the existing passage through ul. Dunikowski in connection with the reconstruction of exit No. 1, – construction of internal roads, – construction of parking stations by internal roads, – construction of pavements and squares, – construction of parking stations for single-tracks, – construction of bus and bus stop stations, – construction of a commercial pavilion with public toilets, – construction of a sheltered stop. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.05.01-24-00D3/17
    0 references