Low-energy public buildings — Thermomodernisation of the Czech City Hall building (Q123879): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The investment concerns deep thermal renovation of the public building — the municipal office at ul. Katowicka 45 in Chelyadadzai. The project includes: (a) implementation of floor insulation on the ground, (b) insulation of basement walls and roof walls, (c) modification of the window system at the entrance to the building and full replacement of window frames, (d) replacement of door joinery, (e) replacement of the heat source for c.o. (f) r...) |
(Created claim: summary (P836): The investment concerns a deep thermal modernisation of the public utility building – the City Hall, located at ul. Katowice 45 in Czeladzi. The scope of the project shall include: a) insulation of the floor on the ground, b) warming of the walls of cellars, exterior walls and ceilings, c) altering the layout of the windows at the entrance of the building and full replacement of the window joinery, d) replacement of the door joinery, e) replacem...) |
||||||||||||||
Property / summary | |||||||||||||||
The investment concerns a deep thermal modernisation of the public utility building – the City Hall, located at ul. Katowice 45 in Czeladzi. The scope of the project shall include: a) insulation of the floor on the ground, b) warming of the walls of cellars, exterior walls and ceilings, c) altering the layout of the windows at the entrance of the building and full replacement of the window joinery, d) replacement of the door joinery, e) replacement of the heat source for central heating, f) modernisation of the internal installation of central heating (g) replacement of volume heaters for the preparation of central heating (h) installation of mechanical ventilation systems with repair of heat in the session room. The project, concerning a building with a total usable area of 3188.97 m², leads to an increase in energy efficiency by approx. 81,47 % and contributes to a reduction of CO2 emissions from 231,47 t/year to 68,34 t/year, i.e. by 163,13 t/year. (70.48 %). (English) | |||||||||||||||
Property / summary: The investment concerns a deep thermal modernisation of the public utility building – the City Hall, located at ul. Katowice 45 in Czeladzi. The scope of the project shall include: a) insulation of the floor on the ground, b) warming of the walls of cellars, exterior walls and ceilings, c) altering the layout of the windows at the entrance of the building and full replacement of the window joinery, d) replacement of the door joinery, e) replacement of the heat source for central heating, f) modernisation of the internal installation of central heating (g) replacement of volume heaters for the preparation of central heating (h) installation of mechanical ventilation systems with repair of heat in the session room. The project, concerning a building with a total usable area of 3188.97 m², leads to an increase in energy efficiency by approx. 81,47 % and contributes to a reduction of CO2 emissions from 231,47 t/year to 68,34 t/year, i.e. by 163,13 t/year. (70.48 %). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The investment concerns a deep thermal modernisation of the public utility building – the City Hall, located at ul. Katowice 45 in Czeladzi. The scope of the project shall include: a) insulation of the floor on the ground, b) warming of the walls of cellars, exterior walls and ceilings, c) altering the layout of the windows at the entrance of the building and full replacement of the window joinery, d) replacement of the door joinery, e) replacement of the heat source for central heating, f) modernisation of the internal installation of central heating (g) replacement of volume heaters for the preparation of central heating (h) installation of mechanical ventilation systems with repair of heat in the session room. The project, concerning a building with a total usable area of 3188.97 m², leads to an increase in energy efficiency by approx. 81,47 % and contributes to a reduction of CO2 emissions from 231,47 t/year to 68,34 t/year, i.e. by 163,13 t/year. (70.48 %). (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 11:06, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Low-energy public buildings — Thermomodernisation of the Czech City Hall building |
Project in Poland financed by DG Regio |
Statements
2,049,826.08 zloty
0 references
2,411,560.09 zloty
0 references
85.0 percent
0 references
13 June 2016
0 references
29 December 2017
0 references
MIASTO CZELADŹ
0 references
Inwestycja dotyczy głębokiej termomodernizacji budynku użyteczności publicznej - Urzędu Miasta, zlokalizowanego przy ul. Katowickiej 45 w Czeladzi. Zakres przedsięwzięcia obejmuje: a) wykonanie izolacji podłogi na gruncie, b) docieplenie ścian piwnic, ścian zewnętrznych oraz stropodachu, c) zmiana układu okien przy wejściu do budynku oraz pełna wymiana stolarki okiennej, d) wymiana stolarki drzwiowej, e) wymiana źródła ciepła dla c.o., f) modernizacja instalacji wewnętrznej c.o. g) wymiana podgrzewaczy objętościowych do przygotowania c.w.u. h) montaż instalacji wentylacji mechanicznej z odzyskiem ciepła w sali sesyjnej, i) wymiana przestarzałych opraw oświetleniowych (560 szt.) na nowe (LED). Projekt, dotyczący budynku o łącznej powierzchni użytkowej 3188,97 m2, prowadzi do zwiększenia efektywności energetycznej o ok. 81,47% i przyczynia się do redukcji emisji CO2, z poziomu 231,47 t/rok do poziomu 68,34 t/rok, tj. o 163,13 t/rok. (70,48%). (Polish)
0 references
The investment concerns a deep thermal modernisation of the public utility building – the City Hall, located at ul. Katowice 45 in Czeladzi. The scope of the project shall include: a) insulation of the floor on the ground, b) warming of the walls of cellars, exterior walls and ceilings, c) altering the layout of the windows at the entrance of the building and full replacement of the window joinery, d) replacement of the door joinery, e) replacement of the heat source for central heating, f) modernisation of the internal installation of central heating (g) replacement of volume heaters for the preparation of central heating (h) installation of mechanical ventilation systems with repair of heat in the session room. The project, concerning a building with a total usable area of 3188.97 m², leads to an increase in energy efficiency by approx. 81,47 % and contributes to a reduction of CO2 emissions from 231,47 t/year to 68,34 t/year, i.e. by 163,13 t/year. (70.48 %). (English)
21 October 2020
0 references
Identifiers
RPSL.04.03.01-24-04CA/17
0 references