Q123721 (Q123721): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The material scope of the project includes the supply and assembly of heat pumps together with the adaptation of the existing installation in the sports facilities of MOSiR in Knurów: — indoor swimming pool at ul. Hospital 23, – sports hall and indoor swimming pool at ul. It’s a mining 2. The task will be carried out in the formula design and build. The PFU covers the scope of two stages, and this proposal covers only the scope of Stage I., tran...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
The supply and installation of heat pumps with the fitting of existing installations in the sports facilities of MOSiR Knurów to ul. Mining 2 and ul. Hospital 23 in Knurów

Revision as of 10:38, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    1,472,625.0 zloty
    0 references
    353,430.0 Euro
    13 January 2020
    0 references
    1,732,500.0 zloty
    0 references
    415,800.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 May 2017
    0 references
    15 November 2019
    0 references
    GMINA KNURÓW
    0 references
    0 references

    50°12'25.9"N, 18°39'49.3"E
    0 references
    Rzeczowy zakres projektu obejmuje dostawę i montaż pomp ciepła wraz z dostosowaniem istniejącej instalacji w obiektach sportowych MOSiR w Knurowie: - pływalnia kryta przy ul. Szpitalnej 23, - hala sportowa i pływalnia kryta przy ul. Górniczej 2. Zadanie realizowane będzie w formule zaprojektuj i buduj. PFU obejmuje zakres dwóch etapów, niniejszy wniosek obejmuje wyłącznie zakres etapu I. (Polish)
    0 references
    The material scope of the project includes the supply and assembly of heat pumps together with the adaptation of the existing installation in the sports facilities of MOSiR in Knurów: — indoor swimming pool at ul. Hospital 23, – sports hall and indoor swimming pool at ul. It’s a mining 2. The task will be carried out in the formula design and build. The PFU covers the scope of two stages, and this proposal covers only the scope of Stage I. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.01.01-24-039B/17
    0 references