The purchase and installation of solar panels with a capacity of 25,5 kw by the Workers’ Cooperative Association for the Housing of Siemianowice in Siemianowice. (Q123674): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project intends to install a micro-installation of a photovoltaic power plant on the roof of a team of multi-family buildings belonging to the Workers’ Housing Cooperative. The investment planned by the Applicant will contribute to reducing air pollution in the region, reducing emissions and energy bills. The target capacity of the installation is 25,5 kWp, which will be generated using the PV modules of 255 Wp each. According to provision...)
(‎Created claim: summary (P836): As part of the project, it is planned to install a micro-installation of photovoltaic power plant on the roof of a complex of multi-family buildings belonging to the Workers’ Cooperative Housing Unity. The investment planned by the applicant will reduce air pollution in the region, reduce low emissions and energy bills. The target power of the installation is 25.5 kWp, which will be generated by photovoltaic modules with a power of 255 Wp each....)
Property / summary
 
As part of the project, it is planned to install a micro-installation of photovoltaic power plant on the roof of a complex of multi-family buildings belonging to the Workers’ Cooperative Housing Unity. The investment planned by the applicant will reduce air pollution in the region, reduce low emissions and energy bills. The target power of the installation is 25.5 kWp, which will be generated by photovoltaic modules with a power of 255 Wp each. According to preliminary estimates, the applicant will be able to obtain up to 23662 kW per year the green energy it plans to use for its own needs. The applicant holds all the permits required by law. The installation project has been carried out and the Investor has the right to dispose of the property for construction purposes.The investment will take place in 3Q.2016r in the following stages:1.Preparation and design (realised)2.Selection of contractor3.Montaż4.Promotion and education of residents. (English)
Property / summary: As part of the project, it is planned to install a micro-installation of photovoltaic power plant on the roof of a complex of multi-family buildings belonging to the Workers’ Cooperative Housing Unity. The investment planned by the applicant will reduce air pollution in the region, reduce low emissions and energy bills. The target power of the installation is 25.5 kWp, which will be generated by photovoltaic modules with a power of 255 Wp each. According to preliminary estimates, the applicant will be able to obtain up to 23662 kW per year the green energy it plans to use for its own needs. The applicant holds all the permits required by law. The installation project has been carried out and the Investor has the right to dispose of the property for construction purposes.The investment will take place in 3Q.2016r in the following stages:1.Preparation and design (realised)2.Selection of contractor3.Montaż4.Promotion and education of residents. (English) / rank
 
Normal rank
Property / summary: As part of the project, it is planned to install a micro-installation of photovoltaic power plant on the roof of a complex of multi-family buildings belonging to the Workers’ Cooperative Housing Unity. The investment planned by the applicant will reduce air pollution in the region, reduce low emissions and energy bills. The target power of the installation is 25.5 kWp, which will be generated by photovoltaic modules with a power of 255 Wp each. According to preliminary estimates, the applicant will be able to obtain up to 23662 kW per year the green energy it plans to use for its own needs. The applicant holds all the permits required by law. The installation project has been carried out and the Investor has the right to dispose of the property for construction purposes.The investment will take place in 3Q.2016r in the following stages:1.Preparation and design (realised)2.Selection of contractor3.Montaż4.Promotion and education of residents. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:36, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The purchase and installation of solar panels with a capacity of 25,5 kw by the Workers’ Cooperative Association for the Housing of Siemianowice in Siemianowice.
Project in Poland financed by DG Regio

    Statements

    0 references
    70,510.51 zloty
    0 references
    16,922.52 Euro
    13 January 2020
    0 references
    88,138.18 zloty
    0 references
    21,153.16 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    6 April 2017
    0 references
    28 July 2017
    0 references
    ROBOTNICZA SPÓŁDZIELNIA MIESZKANIOWA "JEDNOŚĆ"
    0 references
    0 references

    50°18'46.4"N, 19°1'4.1"E
    0 references
    W ramach przedsięwzięcia planowany jest montaż mikroinstalacji elektrowni fotowoltaicznej na dachu zespołu budynków wielorodzinnych należących do Robotniczej Spółdzielni Mieszkaniowej Jedność. Planowana przez Wnioskodawcę inwestycja wpłynie na zmniejszenie zanieczyszczenie powietrza w regionie, redukcję niskiej emisji, jak i rachunków za energię. Docelowa moc instalacji to 25,5 kWp, która zostanie wytworzona dzięki modułom fotowoltaicznym o mocy 255 Wp każdy. Zgodnie z wstępnymi szacunkami, Wnioskodawca będzie mógł w stanie uzyskać do 23 662 kW rocznie zielonej energii, którą planuje wykorzystać na własne potrzeby. Wnioskodawca posiada wszystkie wymagane prawem pozwolenia.Zabezpieczył środki własne. Wykonano projekt instalacji, a Inwestor posiada prawo do dysponowania nieruchomością na cele budowlane.Realizacja inwestycji nastąpi w 3 kw.2016rw następujących etapach:1.Przygotowanie i projektowanie( zrealizowane)2.Wybór wykonawcy3.Montaż4.promocja i edukacja mieszkańców. (Polish)
    0 references
    As part of the project, it is planned to install a micro-installation of photovoltaic power plant on the roof of a complex of multi-family buildings belonging to the Workers’ Cooperative Housing Unity. The investment planned by the applicant will reduce air pollution in the region, reduce low emissions and energy bills. The target power of the installation is 25.5 kWp, which will be generated by photovoltaic modules with a power of 255 Wp each. According to preliminary estimates, the applicant will be able to obtain up to 23662 kW per year the green energy it plans to use for its own needs. The applicant holds all the permits required by law. The installation project has been carried out and the Investor has the right to dispose of the property for construction purposes.The investment will take place in 3Q.2016r in the following stages:1.Preparation and design (realised)2.Selection of contractor3.Montaż4.Promotion and education of residents. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.01.01-24-0292/16
    0 references