Construction of the Regional Roads of Racizust-Pszczyna along the section crossing by the City of Rybnik — stage I (Q124480): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the construction of stage I of a road with a cross-section of 2x2, which will be a new trace of provincial road No 935 along the stretch of the city of Rybnik and formed part of its southern bypass. In view of the need to integrate the planned road into the existing road system, a small part of the road (ok.425 m) will be located in the City of Żory. Phase I covers the section from the roundabout to the so called Northe...)
(‎Created claim: summary (P836): The subject of the project is the construction of the first stage of the 2x2 road, which will constitute a new footprint of Voivodeship Road No. 935 on the section running through Rybnik City and forming its southern bypass. Due to the need to incorporate the planned road into the existing road system, a small section of the road (approximately 425 m) will be located in Żory City. Stage I includes a section from the Raciborski roundabout on the...)
Property / summary
 
The subject of the project is the construction of the first stage of the 2x2 road, which will constitute a new footprint of Voivodeship Road No. 935 on the section running through Rybnik City and forming its southern bypass. Due to the need to incorporate the planned road into the existing road system, a small section of the road (approximately 425 m) will be located in Żory City. Stage I includes a section from the Raciborski roundabout on the so-called northern ring road Żor to the junction with Wodzisławska Street (DK 78) in Rybnik – a total of 10.221 km. As part of the investment, 5 collision-free junctions will be built, communicating a new artery with the existing road system and 13 bridges on collisions with roads, railway tracks and rivers. The primary objective of the project is to enable fast and secure access to the A1 motorway, which is part of the TEN-T corridor. (English)
Property / summary: The subject of the project is the construction of the first stage of the 2x2 road, which will constitute a new footprint of Voivodeship Road No. 935 on the section running through Rybnik City and forming its southern bypass. Due to the need to incorporate the planned road into the existing road system, a small section of the road (approximately 425 m) will be located in Żory City. Stage I includes a section from the Raciborski roundabout on the so-called northern ring road Żor to the junction with Wodzisławska Street (DK 78) in Rybnik – a total of 10.221 km. As part of the investment, 5 collision-free junctions will be built, communicating a new artery with the existing road system and 13 bridges on collisions with roads, railway tracks and rivers. The primary objective of the project is to enable fast and secure access to the A1 motorway, which is part of the TEN-T corridor. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of the first stage of the 2x2 road, which will constitute a new footprint of Voivodeship Road No. 935 on the section running through Rybnik City and forming its southern bypass. Due to the need to incorporate the planned road into the existing road system, a small section of the road (approximately 425 m) will be located in Żory City. Stage I includes a section from the Raciborski roundabout on the so-called northern ring road Żor to the junction with Wodzisławska Street (DK 78) in Rybnik – a total of 10.221 km. As part of the investment, 5 collision-free junctions will be built, communicating a new artery with the existing road system and 13 bridges on collisions with roads, railway tracks and rivers. The primary objective of the project is to enable fast and secure access to the A1 motorway, which is part of the TEN-T corridor. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:13, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the Regional Roads of Racizust-Pszczyna along the section crossing by the City of Rybnik — stage I
Project in Poland financed by DG Regio

    Statements

    0 references
    289,989,933.34 zloty
    0 references
    69,597,584.00 Euro
    13 January 2020
    0 references
    389,666,666.67 zloty
    0 references
    93,520,000.0 Euro
    13 January 2020
    0 references
    74.42 percent
    0 references
    4 January 2016
    0 references
    30 June 2020
    0 references
    RYBNIK - MIASTO NA PRAWACH POWIATU
    0 references
    0 references

    50°6'38.2"N, 18°33'11.5"E
    0 references
    Przedmiotem projektu jest budowa I etapu drogi o przekroju 2x2, która będzie stanowiła nowy ślad drogi wojewódzkiej nr 935 na odcinku przebiegającym przez Miasto Rybnik i tworzyła jego południową obwodnicę. Z uwagi na konieczność włączenia planowanej drogi do istniejącego układu drogowego niewielki fragment drogi (ok.425 m) będzie zlokalizowany na terenie Miasta Żory. Etap I obejmuje odcinek od ronda Raciborskiego na tzw. północnej obwodnicy Żor do skrzyżowania z ul.Wodzisławską (DK 78) w Rybniku - w sumie 10,221 km. W ramach inwestycji zostanie wybudowanych 5 bezkolizyjnych węzłów, komunikujących nową arterię z dotychczasowym układem drogowym oraz 13 obiektów mostowych na kolizjach z drogami, torami kolejowymi i rzekami. Podstawowym celem projektu jest umożliwienie szybkiego i bezpiecznego dojazdu do autostrady A1 będącej częścią korytarza sieci TEN-T. (Polish)
    0 references
    The subject of the project is the construction of the first stage of the 2x2 road, which will constitute a new footprint of Voivodeship Road No. 935 on the section running through Rybnik City and forming its southern bypass. Due to the need to incorporate the planned road into the existing road system, a small section of the road (approximately 425 m) will be located in Żory City. Stage I includes a section from the Raciborski roundabout on the so-called northern ring road Żor to the junction with Wodzisławska Street (DK 78) in Rybnik – a total of 10.221 km. As part of the investment, 5 collision-free junctions will be built, communicating a new artery with the existing road system and 13 bridges on collisions with roads, railway tracks and rivers. The primary objective of the project is to enable fast and secure access to the A1 motorway, which is part of the TEN-T corridor. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.06.01.00-24-01HF/16
    0 references