Preparation of preparatory documentation for the ‘Improvement of capacity on line No 213 Reda — Hel’ (Q122353): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The preparation of the preparatory documentation for the project ‘Improvement of capacity on line No 213 Reda — Hel’, under which a detailed inventory of the line will be carried out, followed by a feasibility study in line with the standards in force (including the scope and cost of the works), the project information sheet, if it is to make a provision on the need to carry out an environmental impact assessment, also an EIA report to make fi...) |
(Created claim: summary (P836): Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding pla...) |
||||||||||||||
Property / summary | |||||||||||||||
Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English) | |||||||||||||||
Property / summary: Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 09:34, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Preparation of preparatory documentation for the ‘Improvement of capacity on line No 213 Reda — Hel’ |
Project in Poland financed by DG Regio |
Statements
1,289,253.88 zloty
0 references
1,516,769.28 zloty
0 references
85.0 percent
0 references
4 June 2019
0 references
30 December 2020
0 references
PKP POLSKIE LINIE KOLEJOWE S.A.
0 references
Q2515024 (Deleted Item)
0 references
Opracowanie dokumentacji przygotowawczej dla projektu „Poprawa przepustowości na linii Nr 213 Reda – Hel”, w ramach której zostanie wykonana szczegółowa inwentaryzacja linii, a następnie studium wykonalności zgodne z obowiązującymi w tym zakresie standardami (uwzględniające zakres i koszty robót), karta informacyjna przedsięwzięcia, jeśli będzie Postanowienie o potrzebie przeprowadzenia oceny oddziaływania na środowisko również raport OOŚ w celu podjęcia decyzji finansowych i rzeczowych w zakresie planowanej rewitalizacji i elektryfikacji linii kolejowej oraz przygotowany zostanie program funkcjonalno – użytkowy. (Polish)
0 references
Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding planned revitalisation and electrification of the railway line and a functional-use programme will be prepared. (English)
21 October 2020
0 references
Identifiers
RPPM.09.02.02-22-0002/18
0 references