Construction of gravity and pressure sewer with pumping stations in Kalniki — stage II (Q118896): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project is to: regularisation of water and wastewater management by extending the sanitary sewage system in the municipality of Stubno in the town of Kalniki. The aim of the proposed Project focuses on addressing social and economic marginalisation and inclusion of the area in the region’s development processes. The project’s objective is in line with the objective of Action 4.3 of the 2014-2020 ROP PP: ‘A majority pr...)
(‎Created claim: summary (P836): The main objective of the project is: regulation of water and sewage management through the extension of sanitary sewage system in the Stubno Municipality in Kalniki. The objective of the proposed Project focuses on combating social and economic marginalisation and integrating the above-mentioned area into the development processes of the region. The objective of the project is in line with the objective of action 4.3 of the ND ROP for the perio...)
Property / summary
 
The main objective of the project is: regulation of water and sewage management through the extension of sanitary sewage system in the Stubno Municipality in Kalniki. The objective of the proposed Project focuses on combating social and economic marginalisation and integrating the above-mentioned area into the development processes of the region. The objective of the project is in line with the objective of action 4.3 of the ND ROP for the period 2014-2020: ‘Increased proportion of the population using the sewage treatment system’. This will be achieved through specific objectives: reduction of pollution, including waste entering the environment. The subject of this project is the construction of a gravity sanitary sewer and pressure manifold with pumps in Kalniki, together with its introduction to the existing sewage treatment system in Stubno. The investment focuses on the construction of sanitary sewage system with a total length of 8.75 km (gravity pipe: 7495,00 m.b. – 7,49 km, pressure pipeline: 1262 m.b. – 1.26 km) and 5 sewage pumping plants (P2A, P3, P4, P5, P6). Addendum: the P1A and P2 pumping stations were made in the previous stage. As part of the construction, a sewer network made of PVC pipes for gravity and PE drainage for pressure drainage will be made. In addition, the project provides for the implementation of a monitoring system for sewage pumping plants. Object states information will be transmitted via GPRS to the monitoring station, which will visualise all monitored objects on the computer screen. As a result of the project, the number of additional persons benefiting from improved waste water treatment will amount to 800 RLM, while the amount of waste water cargo undergoing improved treatment will be at the level of 800 RLM. (English)
Property / summary: The main objective of the project is: regulation of water and sewage management through the extension of sanitary sewage system in the Stubno Municipality in Kalniki. The objective of the proposed Project focuses on combating social and economic marginalisation and integrating the above-mentioned area into the development processes of the region. The objective of the project is in line with the objective of action 4.3 of the ND ROP for the period 2014-2020: ‘Increased proportion of the population using the sewage treatment system’. This will be achieved through specific objectives: reduction of pollution, including waste entering the environment. The subject of this project is the construction of a gravity sanitary sewer and pressure manifold with pumps in Kalniki, together with its introduction to the existing sewage treatment system in Stubno. The investment focuses on the construction of sanitary sewage system with a total length of 8.75 km (gravity pipe: 7495,00 m.b. – 7,49 km, pressure pipeline: 1262 m.b. – 1.26 km) and 5 sewage pumping plants (P2A, P3, P4, P5, P6). Addendum: the P1A and P2 pumping stations were made in the previous stage. As part of the construction, a sewer network made of PVC pipes for gravity and PE drainage for pressure drainage will be made. In addition, the project provides for the implementation of a monitoring system for sewage pumping plants. Object states information will be transmitted via GPRS to the monitoring station, which will visualise all monitored objects on the computer screen. As a result of the project, the number of additional persons benefiting from improved waste water treatment will amount to 800 RLM, while the amount of waste water cargo undergoing improved treatment will be at the level of 800 RLM. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is: regulation of water and sewage management through the extension of sanitary sewage system in the Stubno Municipality in Kalniki. The objective of the proposed Project focuses on combating social and economic marginalisation and integrating the above-mentioned area into the development processes of the region. The objective of the project is in line with the objective of action 4.3 of the ND ROP for the period 2014-2020: ‘Increased proportion of the population using the sewage treatment system’. This will be achieved through specific objectives: reduction of pollution, including waste entering the environment. The subject of this project is the construction of a gravity sanitary sewer and pressure manifold with pumps in Kalniki, together with its introduction to the existing sewage treatment system in Stubno. The investment focuses on the construction of sanitary sewage system with a total length of 8.75 km (gravity pipe: 7495,00 m.b. – 7,49 km, pressure pipeline: 1262 m.b. – 1.26 km) and 5 sewage pumping plants (P2A, P3, P4, P5, P6). Addendum: the P1A and P2 pumping stations were made in the previous stage. As part of the construction, a sewer network made of PVC pipes for gravity and PE drainage for pressure drainage will be made. In addition, the project provides for the implementation of a monitoring system for sewage pumping plants. Object states information will be transmitted via GPRS to the monitoring station, which will visualise all monitored objects on the computer screen. As a result of the project, the number of additional persons benefiting from improved waste water treatment will amount to 800 RLM, while the amount of waste water cargo undergoing improved treatment will be at the level of 800 RLM. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:27, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of gravity and pressure sewer with pumping stations in Kalniki — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    1,217,857.93 zloty
    0 references
    292,285.90 Euro
    13 January 2020
    0 references
    1,432,774.06 zloty
    0 references
    343,865.77 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2017
    0 references
    30 November 2017
    0 references
    GMINA STUBNO
    0 references
    0 references
    Zakładany cel główny projektu to: uregulowanie gospodarki wodno-ściekowej poprzez rozbudowę kanalizacji sanitarnej w Gminie Stubno w miejscowości Kalników. Cel wnioskowanego Projektu skupia się na przeciwdziałaniu marginalizacji społecznej i ekonomicznej oraz włączeniu w/w obszaru w procesy rozwojowe regionu. Cel projektu jest zgodny z celem działania 4.3 RPO WP na lata 2014 - 2020, jakim jest: „Zwiększony odsetek ludności korzystającej z systemu oczyszczania ścieków”. Realizacja tego celu będzie następować poprzez cele szczegółowe: ograniczenie ilości zanieczyszczeń, w tym odpadów przedostających się do środowiska. Przedmiotem niniejszego projektu jest wykonanie kanalizacji sanitarnej grawitacyjnej oraz kolektora ciśnieniowego z pompami w miejscowości Kalników wraz z doprowadzeniem jej do istniejącego systemu oczyszczania ścieków w Stubnie. Inwestycja koncentruje się na budowie sieci kanalizacji sanitarnej o łącznej długości 8,75 km (rurociąg grawitacyjny: 7495,00 m.b. – 7,49 km, rurociąg ciśnieniowy: 1262 m.b. – 1,26 km) oraz 5 przepompowni ścieków (P2A, P3, P4, P5, P6). Uzupełnienie: przepompownie P1A i P2 wykonane zostały w poprzednim etapie. W ramach budowy wykonana zostanie sieć kanalizacyjna z rur PCV dla kanalizacji grawitacyjnej i PE dla kanalizacji ciśnieniowej. Dodatkowo w ramach przedsięwzięcia przewiduje się wdrożenie systemu monitoringu przepompowni ścieków. Informacje o stanach obiektów przesyłane będą za pomocą GPRS do stacji monitorującej, która, wizualizować będzie wszystkie monitorowane obiekty na ekranie komputera. W efekcie realizacji projektu liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków wyniesie 800 RLM, natomiast wielkość ładunku ścieków poddanych ulepszonemu oczyszczaniu kształtować się będzie na poziomie 800 RLM. (Polish)
    0 references
    The main objective of the project is: regulation of water and sewage management through the extension of sanitary sewage system in the Stubno Municipality in Kalniki. The objective of the proposed Project focuses on combating social and economic marginalisation and integrating the above-mentioned area into the development processes of the region. The objective of the project is in line with the objective of action 4.3 of the ND ROP for the period 2014-2020: ‘Increased proportion of the population using the sewage treatment system’. This will be achieved through specific objectives: reduction of pollution, including waste entering the environment. The subject of this project is the construction of a gravity sanitary sewer and pressure manifold with pumps in Kalniki, together with its introduction to the existing sewage treatment system in Stubno. The investment focuses on the construction of sanitary sewage system with a total length of 8.75 km (gravity pipe: 7495,00 m.b. – 7,49 km, pressure pipeline: 1262 m.b. – 1.26 km) and 5 sewage pumping plants (P2A, P3, P4, P5, P6). Addendum: the P1A and P2 pumping stations were made in the previous stage. As part of the construction, a sewer network made of PVC pipes for gravity and PE drainage for pressure drainage will be made. In addition, the project provides for the implementation of a monitoring system for sewage pumping plants. Object states information will be transmitted via GPRS to the monitoring station, which will visualise all monitored objects on the computer screen. As a result of the project, the number of additional persons benefiting from improved waste water treatment will amount to 800 RLM, while the amount of waste water cargo undergoing improved treatment will be at the level of 800 RLM. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.04.03.01-18-0010/16
    0 references