Thermal modernisation of educational buildings: ZS No 3 in Nisk and the gym building at CLS No 4 in Nisk (Q118700): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The subject of the project is the deep thermal renovation of the two educational buildings owned by the Municipality and the City of Niko. The scope of the work has been determined on the basis of previously prepared energy audits. The project is part of the strategic approach of the municipality to act in the framework of the Low Carbon Economy Plan for the Municipality and the City of Nikes.The project is a deep thermal renovation of the gym...) |
(Created claim: summary (P836): The subject of the project is a deep thermal modernisation of two educational buildings belonging to the Municipality and the City of Nisko. The scope of the work was established on the basis of pre-prepared energy audits. The project is an element of the municipality’s strategic approach to the operation of the Low-Emission Economy Plan developed for the municipality and the Low Town.The subject of the project is a deep thermal modernisation of...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep thermal modernisation of two educational buildings belonging to the Municipality and the City of Nisko. The scope of the work was established on the basis of pre-prepared energy audits. The project is an element of the municipality’s strategic approach to the operation of the Low-Emission Economy Plan developed for the municipality and the Low Town.The subject of the project is a deep thermal modernisation of the gym building at the Public Primary School No. 4 in Nisko – Podwolin and the School Complex No. 3 in Nisko. The scope of the thermal modernisation includes:The gymnasium building at PSP No. 4: replacement of window and door carpentry; warming of walls above the ground; granulate warming of the ceiling; roof warming; the development of post-executive audits; modernisation of sanitary installations, including: central heating disassembly works, installation of radiators, insulation, pipelines made of steel pipes, construction works and installation of solar installations. replacement of window and door carpentry; warming of walls below and above the ground; warming the walls of the school pedestal; warming the ceiling over the last floor of the school building; warming of the roof of the gym; overhaul of the lightning protection system; the development of post-executive audits; modernisation of sanitary installations, including: the main objective of the project is to increase the energy efficiency of two educational buildings, the gymnasium building at PSP No.4 in Nisko – Podwolin and the ZS No. 3 building in Nisko. For the purposes of the direct project include:- reducing the demand of buildings for energy;- reducing the consumption of thermal energy;- reducing CO2 emissions;- an increase in the production of heat based on RES installations (solar collectors);- lower heating costs of buildings;- the development of low-carbon economy in the municipality and the town of Nisko. (English) | |||||||||||||||
Property / summary: The subject of the project is a deep thermal modernisation of two educational buildings belonging to the Municipality and the City of Nisko. The scope of the work was established on the basis of pre-prepared energy audits. The project is an element of the municipality’s strategic approach to the operation of the Low-Emission Economy Plan developed for the municipality and the Low Town.The subject of the project is a deep thermal modernisation of the gym building at the Public Primary School No. 4 in Nisko – Podwolin and the School Complex No. 3 in Nisko. The scope of the thermal modernisation includes:The gymnasium building at PSP No. 4: replacement of window and door carpentry; warming of walls above the ground; granulate warming of the ceiling; roof warming; the development of post-executive audits; modernisation of sanitary installations, including: central heating disassembly works, installation of radiators, insulation, pipelines made of steel pipes, construction works and installation of solar installations. replacement of window and door carpentry; warming of walls below and above the ground; warming the walls of the school pedestal; warming the ceiling over the last floor of the school building; warming of the roof of the gym; overhaul of the lightning protection system; the development of post-executive audits; modernisation of sanitary installations, including: the main objective of the project is to increase the energy efficiency of two educational buildings, the gymnasium building at PSP No.4 in Nisko – Podwolin and the ZS No. 3 building in Nisko. For the purposes of the direct project include:- reducing the demand of buildings for energy;- reducing the consumption of thermal energy;- reducing CO2 emissions;- an increase in the production of heat based on RES installations (solar collectors);- lower heating costs of buildings;- the development of low-carbon economy in the municipality and the town of Nisko. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep thermal modernisation of two educational buildings belonging to the Municipality and the City of Nisko. The scope of the work was established on the basis of pre-prepared energy audits. The project is an element of the municipality’s strategic approach to the operation of the Low-Emission Economy Plan developed for the municipality and the Low Town.The subject of the project is a deep thermal modernisation of the gym building at the Public Primary School No. 4 in Nisko – Podwolin and the School Complex No. 3 in Nisko. The scope of the thermal modernisation includes:The gymnasium building at PSP No. 4: replacement of window and door carpentry; warming of walls above the ground; granulate warming of the ceiling; roof warming; the development of post-executive audits; modernisation of sanitary installations, including: central heating disassembly works, installation of radiators, insulation, pipelines made of steel pipes, construction works and installation of solar installations. replacement of window and door carpentry; warming of walls below and above the ground; warming the walls of the school pedestal; warming the ceiling over the last floor of the school building; warming of the roof of the gym; overhaul of the lightning protection system; the development of post-executive audits; modernisation of sanitary installations, including: the main objective of the project is to increase the energy efficiency of two educational buildings, the gymnasium building at PSP No.4 in Nisko – Podwolin and the ZS No. 3 building in Nisko. For the purposes of the direct project include:- reducing the demand of buildings for energy;- reducing the consumption of thermal energy;- reducing CO2 emissions;- an increase in the production of heat based on RES installations (solar collectors);- lower heating costs of buildings;- the development of low-carbon economy in the municipality and the town of Nisko. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 16:52, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of educational buildings: ZS No 3 in Nisk and the gym building at CLS No 4 in Nisk |
Project in Poland financed by DG Regio |
Statements
1,112,003.69 zloty
0 references
1,308,239.66 zloty
0 references
85.0 percent
0 references
12 September 2016
0 references
29 December 2017
0 references
GMINA I MIASTO NISKO
0 references
Przedmiotem realizowanego projektu jest głęboka termomodernizacja dwóch budynków oświatowych należących do Gminy i Miasta Nisko. Zakres prac został ustalony na podstawie wcześniej przygotowanych audytów energetycznych. Projekt stanowi element podejścia strategicznego gminy do działania w ramach opracowanego Planu Gospodarki Niskoemisyjnej dla Gminy i Miasta Nisko.Przedmiotem projektu jest głęboka termomodernizacja budynku sali gimnastycznej przy Publicznej Szkole Podstawowej Nr 4 w Nisku – Podwolinie oraz budynku Zespołu Szkół Nr 3 w Nisku. Zakres termomodernizacji obejmuje:Budynek Sali gimnastycznej przy PSP Nr 4: wymianę stolarki okiennej i drzwiowej; docieplenie ścian powyżej gruntu; docieplenie stropu granulatem; docieplenie dachu; opracowanie audytu powykonawczego; modernizację instalacji sanitarnej, w tym: roboty demontażowe c.o., montaż grzejników, izolacji, rurociągów z rur stalowych, roboty budowlane i montaż instalacji solarnej.Budynek ZS Nr 3 w Nisku: wymianę stolarki okiennej i drzwiowej; docieplenie ścian poniżej i powyżej gruntu; docieplenie ścian cokołu szkoły; docieplenie stropu nad ostatnią kondygnacją budynku szkoły; docieplenie dachu sali gimnastycznej; remont instalacji odgromowej; opracowanie audytu powykonawczego; modernizację instalacji sanitarnej, w tym: roboty demontażowe c.o., montaż grzejników, izolacji, rurociągów z rur stalowych, roboty budowlane i montaż instalacji solarnej.Celem nadrzędnym projektu jest podniesienie efektywności energetycznej dwóch budynków oświatowych, budynku sali gimnastycznej przy PSP Nr 4w Nisku – Podwolinie oraz budynku ZS Nr 3 w Nisku. Do celów bezpośrednich projektu należy:- zmniejszenie zapotrzebowania budynków na energię;- ograniczenie zużycia energii cieplnej;- ograniczenie emisji CO2;- wzrost produkcji energii cieplnej w oparciu o instalacje OZE (kolektory słoneczne);- obniżenie kosztów ogrzewania budynków;- rozwój gospodarki niskoemisyjnej na terenie gminy i miasta Nisko. (Polish)
0 references
The subject of the project is a deep thermal modernisation of two educational buildings belonging to the Municipality and the City of Nisko. The scope of the work was established on the basis of pre-prepared energy audits. The project is an element of the municipality’s strategic approach to the operation of the Low-Emission Economy Plan developed for the municipality and the Low Town.The subject of the project is a deep thermal modernisation of the gym building at the Public Primary School No. 4 in Nisko – Podwolin and the School Complex No. 3 in Nisko. The scope of the thermal modernisation includes:The gymnasium building at PSP No. 4: replacement of window and door carpentry; warming of walls above the ground; granulate warming of the ceiling; roof warming; the development of post-executive audits; modernisation of sanitary installations, including: central heating disassembly works, installation of radiators, insulation, pipelines made of steel pipes, construction works and installation of solar installations. replacement of window and door carpentry; warming of walls below and above the ground; warming the walls of the school pedestal; warming the ceiling over the last floor of the school building; warming of the roof of the gym; overhaul of the lightning protection system; the development of post-executive audits; modernisation of sanitary installations, including: the main objective of the project is to increase the energy efficiency of two educational buildings, the gymnasium building at PSP No.4 in Nisko – Podwolin and the ZS No. 3 building in Nisko. For the purposes of the direct project include:- reducing the demand of buildings for energy;- reducing the consumption of thermal energy;- reducing CO2 emissions;- an increase in the production of heat based on RES installations (solar collectors);- lower heating costs of buildings;- the development of low-carbon economy in the municipality and the town of Nisko. (English)
20 October 2020
0 references
Identifiers
RPPK.03.02.00-18-0070/16
0 references