Thermal modernisation of public buildings in the municipality of Solina (Q118638): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main aim of the project is to reduce the energy consumption needed to operate the 7 public buildings in the municipality of Solina, which are: A team of schools in Wołkowyi, a Primary School in Berezce, a Team of Schools in Bóbrce, G.Z.K in Polańczyk as non-eligible costs, the municipal authority in Polańczyk, the Primary School in Myczkowce, the Rural City of Myczkowce. The project concerns the reduction of the heating energy consumption...)
(‎Created claim: summary (P836): The main objective of the project is to reduce the energy consumption needed for the operation of 7 public buildings in the municipality of Solina: Ensemble of Schools in Wołkowyi, Primary School in Berezka, School Complex in Bóbrka, G.Z.K in Polańczyk as ineligible costs, Municipal Office in Polańczyk, Primary School in Myczkowce, Village Culture House in Myczkowce. The project concerns the reduction of heat consumption for building heating and...)
Property / summary
 
The main objective of the project is to reduce the energy consumption needed for the operation of 7 public buildings in the municipality of Solina: Ensemble of Schools in Wołkowyi, Primary School in Berezka, School Complex in Bóbrka, G.Z.K in Polańczyk as ineligible costs, Municipal Office in Polańczyk, Primary School in Myczkowce, Village Culture House in Myczkowce. The project concerns the reduction of heat consumption for building heating and CWU. The additional objective of the project is to increase the share of renewable energy sources in electricity production by making photovoltaic installations for own use of 2 buildings, heat in the form of solar collectors to CWU, GHP heat pump and 4 biomass boiler rooms. In connection with the implementation of the material scope of the project, the costs for the heat and electricity supplied to buildings will be reduced. The buildings are located in the municipality of Solina, the total heated area of the buildings is 6190.60 m². In the current state of the building, the buildings need to be modernised, as building divisions and window and door carpentry do not meet the applicable technical requirements for thermal insulation. As part of the actual implementation of the project, a number of modernisations are planned, consisting of: insulation of external and foundation walls, warming of stropodaches and ceilings, replacement of old window and door joinery, modernisation of heating and CWU systems with new heat sources. In addition, RES installations in the form of photovoltaics with a total power of 10 KW, solar collectors with a total power of 21 KW, GHP heat pumps with 120 KW heating power and 4 biomass boiler rooms with a total power of 565 KW are planned. The construction and installation works discussed will result in energy-modernised buildings, reducing final energy consumption by 1172.72 MWh/year, thereby reducing CO2 emissions to the atmosphere in the amount of 425.16 tonnes/year. (English)
Property / summary: The main objective of the project is to reduce the energy consumption needed for the operation of 7 public buildings in the municipality of Solina: Ensemble of Schools in Wołkowyi, Primary School in Berezka, School Complex in Bóbrka, G.Z.K in Polańczyk as ineligible costs, Municipal Office in Polańczyk, Primary School in Myczkowce, Village Culture House in Myczkowce. The project concerns the reduction of heat consumption for building heating and CWU. The additional objective of the project is to increase the share of renewable energy sources in electricity production by making photovoltaic installations for own use of 2 buildings, heat in the form of solar collectors to CWU, GHP heat pump and 4 biomass boiler rooms. In connection with the implementation of the material scope of the project, the costs for the heat and electricity supplied to buildings will be reduced. The buildings are located in the municipality of Solina, the total heated area of the buildings is 6190.60 m². In the current state of the building, the buildings need to be modernised, as building divisions and window and door carpentry do not meet the applicable technical requirements for thermal insulation. As part of the actual implementation of the project, a number of modernisations are planned, consisting of: insulation of external and foundation walls, warming of stropodaches and ceilings, replacement of old window and door joinery, modernisation of heating and CWU systems with new heat sources. In addition, RES installations in the form of photovoltaics with a total power of 10 KW, solar collectors with a total power of 21 KW, GHP heat pumps with 120 KW heating power and 4 biomass boiler rooms with a total power of 565 KW are planned. The construction and installation works discussed will result in energy-modernised buildings, reducing final energy consumption by 1172.72 MWh/year, thereby reducing CO2 emissions to the atmosphere in the amount of 425.16 tonnes/year. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to reduce the energy consumption needed for the operation of 7 public buildings in the municipality of Solina: Ensemble of Schools in Wołkowyi, Primary School in Berezka, School Complex in Bóbrka, G.Z.K in Polańczyk as ineligible costs, Municipal Office in Polańczyk, Primary School in Myczkowce, Village Culture House in Myczkowce. The project concerns the reduction of heat consumption for building heating and CWU. The additional objective of the project is to increase the share of renewable energy sources in electricity production by making photovoltaic installations for own use of 2 buildings, heat in the form of solar collectors to CWU, GHP heat pump and 4 biomass boiler rooms. In connection with the implementation of the material scope of the project, the costs for the heat and electricity supplied to buildings will be reduced. The buildings are located in the municipality of Solina, the total heated area of the buildings is 6190.60 m². In the current state of the building, the buildings need to be modernised, as building divisions and window and door carpentry do not meet the applicable technical requirements for thermal insulation. As part of the actual implementation of the project, a number of modernisations are planned, consisting of: insulation of external and foundation walls, warming of stropodaches and ceilings, replacement of old window and door joinery, modernisation of heating and CWU systems with new heat sources. In addition, RES installations in the form of photovoltaics with a total power of 10 KW, solar collectors with a total power of 21 KW, GHP heat pumps with 120 KW heating power and 4 biomass boiler rooms with a total power of 565 KW are planned. The construction and installation works discussed will result in energy-modernised buildings, reducing final energy consumption by 1172.72 MWh/year, thereby reducing CO2 emissions to the atmosphere in the amount of 425.16 tonnes/year. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:33, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of public buildings in the municipality of Solina
Project in Poland financed by DG Regio

    Statements

    0 references
    3,414,651.56 zloty
    0 references
    819,516.37 Euro
    13 January 2020
    0 references
    4,017,237.18 zloty
    0 references
    964,136.92 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 February 2016
    0 references
    31 December 2017
    0 references
    GMINA SOLINA
    0 references
    0 references
    Głównym celem projektu jest zmniejszenie zużycia energii potrzebnej do funkcjonowania 7 budynków użyteczności publicznej na terenie Gminy Solina, są to budynki : Zespołu Szkół w Wołkowyi, Szkoły Podstawowej w Berezce , Zespołu Szkół w Bóbrce, G.Z.K w Polańczyku jako koszty niekwalifikowane, Urzędu Gminy w Polańczyku, Szkoły Podstawowej w Myczkowcach, Wiejskiego Domu Kultury w Myczkowcach . Projekt dotyczy ograniczenia zużycia energii cieplnej do ogrzewania budynku i CWU . Dodatkowym celem projektu jest zwiększenie udziału odnawialnych źródeł energii w produkcji energii elektrycznej poprzez wykonanie instalacji fotowoltaicznej na potrzeby własne 2 budynków, energii cieplej w postaci kolektorów słonecznych do CWU, pompy ciepła GHP oraz 4 kotłowni biomasowych . W związku z realizacją zakresu rzeczowego projektu zostaną zmniejszone koszty za dostarczaną do budynków energię cieplną oraz elektryczną. Budynki zlokalizowane są na terenie Gminy Solina, całkowita powierzchnia ogrzewana budynków wynosi 6 190,60 m2. W obecnym stanie budynki wymagają modernizacji, gdyż przegrody budowlane oraz stolarka okienna i drzwiowa nie spełniają obowiązujących warunków technicznych co do izolacyjności cieplnej. W ramach rzeczowej realizacji projektu planuje się wykonać szereg modernizacji polegających na: ociepleniu ścian zewnętrznych i fundamentowych , ociepleniu stropodachów i stropów , wymianę starej stolarki okiennej i drzwiowej , modernizacji instalacji ogrzewania i CWU z nowymi źródłami ciepła. Dodatkowo planuje się wykonanie instalacji OZE w postaci fotowoltaiki o łącznej mocy 10 KW, kolektorów słonecznych o łącznej mocy 21 KW, pompy ciepła GHP o mocy grzewczej 120 KW i 4 kotłowni biomasowych o łącznej mocy 565 KW. Wykonanie omówionych prac budowlanych i instalacyjnych przyniesie efekt w postaci zmodernizowanych energetycznie budynków, zmniejszenie zużycia energii finalnej o 1172,72 MWh/rok, a tym samym ograniczenie emisji CO2 do atmosfery w ilości 425,16 ton /rok. (Polish)
    0 references
    The main objective of the project is to reduce the energy consumption needed for the operation of 7 public buildings in the municipality of Solina: Ensemble of Schools in Wołkowyi, Primary School in Berezka, School Complex in Bóbrka, G.Z.K in Polańczyk as ineligible costs, Municipal Office in Polańczyk, Primary School in Myczkowce, Village Culture House in Myczkowce. The project concerns the reduction of heat consumption for building heating and CWU. The additional objective of the project is to increase the share of renewable energy sources in electricity production by making photovoltaic installations for own use of 2 buildings, heat in the form of solar collectors to CWU, GHP heat pump and 4 biomass boiler rooms. In connection with the implementation of the material scope of the project, the costs for the heat and electricity supplied to buildings will be reduced. The buildings are located in the municipality of Solina, the total heated area of the buildings is 6190.60 m². In the current state of the building, the buildings need to be modernised, as building divisions and window and door carpentry do not meet the applicable technical requirements for thermal insulation. As part of the actual implementation of the project, a number of modernisations are planned, consisting of: insulation of external and foundation walls, warming of stropodaches and ceilings, replacement of old window and door joinery, modernisation of heating and CWU systems with new heat sources. In addition, RES installations in the form of photovoltaics with a total power of 10 KW, solar collectors with a total power of 21 KW, GHP heat pumps with 120 KW heating power and 4 biomass boiler rooms with a total power of 565 KW are planned. The construction and installation works discussed will result in energy-modernised buildings, reducing final energy consumption by 1172.72 MWh/year, thereby reducing CO2 emissions to the atmosphere in the amount of 425.16 tonnes/year. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0015/16
    0 references