“Thermal upgrading of public utility buildings — Station No 6 in Stalowa Wola” (Q118636): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main purpose of the project is to improve the energy efficiency of the building No 6 of the Stalowa Wola building with a usable surface area of 1 257.35 m². The building tool is a powerful tool for achieving this goal and will reduce energy consumption. Achievement of objectives shall be measured by means of indicators: The amount of heat energy saved 532,19 GJ/year, the electricity saved 4.12 MWh/year, the estimated annual decrease in gre...)
(‎Created claim: summary (P836): The main objective of the project is to improve the energy efficiency of the building of Infirmary No. 6 in Stalowa Wola with a usable area of 1257,35 m². A tool for achieving this goal is a deep thermal modernisation of the building, which will reduce energy consumption. The achievement of the objectives will be measured by indicators: The amount of thermal energy saved 532.19 GJ/year, The amount of electricity saved 4.12 MWh/year, Estimated an...)
Property / summary
 
The main objective of the project is to improve the energy efficiency of the building of Infirmary No. 6 in Stalowa Wola with a usable area of 1257,35 m². A tool for achieving this goal is a deep thermal modernisation of the building, which will reduce energy consumption. The achievement of the objectives will be measured by indicators: The amount of thermal energy saved 532.19 GJ/year, The amount of electricity saved 4.12 MWh/year, Estimated annual decrease in greenhouse gas emissions (CI34) 43,93 t CO2/year.The scope of the project includes: the modernisation of the heating system completed in 2017 (installation of steel pipes, plate radiators, valves), planned thermomodernisation, including warming of ceilings and walls together with the replacement of windows and external doors and modernisation of lighting inside the building (exchange of fluorescent lamps into LEDs).The source of heat – system heat – does not change. (English)
Property / summary: The main objective of the project is to improve the energy efficiency of the building of Infirmary No. 6 in Stalowa Wola with a usable area of 1257,35 m². A tool for achieving this goal is a deep thermal modernisation of the building, which will reduce energy consumption. The achievement of the objectives will be measured by indicators: The amount of thermal energy saved 532.19 GJ/year, The amount of electricity saved 4.12 MWh/year, Estimated annual decrease in greenhouse gas emissions (CI34) 43,93 t CO2/year.The scope of the project includes: the modernisation of the heating system completed in 2017 (installation of steel pipes, plate radiators, valves), planned thermomodernisation, including warming of ceilings and walls together with the replacement of windows and external doors and modernisation of lighting inside the building (exchange of fluorescent lamps into LEDs).The source of heat – system heat – does not change. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to improve the energy efficiency of the building of Infirmary No. 6 in Stalowa Wola with a usable area of 1257,35 m². A tool for achieving this goal is a deep thermal modernisation of the building, which will reduce energy consumption. The achievement of the objectives will be measured by indicators: The amount of thermal energy saved 532.19 GJ/year, The amount of electricity saved 4.12 MWh/year, Estimated annual decrease in greenhouse gas emissions (CI34) 43,93 t CO2/year.The scope of the project includes: the modernisation of the heating system completed in 2017 (installation of steel pipes, plate radiators, valves), planned thermomodernisation, including warming of ceilings and walls together with the replacement of windows and external doors and modernisation of lighting inside the building (exchange of fluorescent lamps into LEDs).The source of heat – system heat – does not change. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:33, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Thermal upgrading of public utility buildings — Station No 6 in Stalowa Wola”
Project in Poland financed by DG Regio

    Statements

    0 references
    543,257.44 zloty
    0 references
    130,381.79 Euro
    13 January 2020
    0 references
    639,126.43 zloty
    0 references
    153,390.34 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 October 2017
    0 references
    30 November 2019
    0 references
    GMINA STALOWA WOLA
    0 references
    0 references
    Celem głównym projektu jest poprawa efektywności energetycznej budynku Przychodni nr 6 w Stalowej Woli o powierzchni użytkowej 1257,35 m2. Narzędziem osiągania tego celu jest głęboka termomodernizacja budynku, która pozwoli na zmniejszenie zużycia energii. Osiąganie celów mierzone będzie poprzez wskaźniki: Ilość zaoszczędzonej energii cieplnej 532,19 GJ/rok, Ilość zaoszczędzonej energii elektrycznej 4,12 MWh/rok, Szacowany roczny spadek emisji gazów cieplarnianych (CI34) 43,93 t CO2/rok.Zakres przedsięwzięcia obejmuje: zrealizowaną w 2017 r. modernizację instalacji grzewczej (instalacja z rur stalowych, grzejniki płytowe, zawory), planowaną termomodernizację obejmującą docieplenie stropodachu oraz ścian wraz z wymianą okien i drzwi zewnętrznych oraz modernizację oświetlenia wewnątrz budynku (wymiana świetlówek na LED).Źródło ciepła – ciepło systemowe – nie ulega zmianie.Zadaniom rzeczowym towarzyszą zadania związane z przygotowaniem audytu energetycznego powykonawczego, dwóch ekspertyz ornitologicznych i chiropterologicznych oraz promocją projektu. (Polish)
    0 references
    The main objective of the project is to improve the energy efficiency of the building of Infirmary No. 6 in Stalowa Wola with a usable area of 1257,35 m². A tool for achieving this goal is a deep thermal modernisation of the building, which will reduce energy consumption. The achievement of the objectives will be measured by indicators: The amount of thermal energy saved 532.19 GJ/year, The amount of electricity saved 4.12 MWh/year, Estimated annual decrease in greenhouse gas emissions (CI34) 43,93 t CO2/year.The scope of the project includes: the modernisation of the heating system completed in 2017 (installation of steel pipes, plate radiators, valves), planned thermomodernisation, including warming of ceilings and walls together with the replacement of windows and external doors and modernisation of lighting inside the building (exchange of fluorescent lamps into LEDs).The source of heat – system heat – does not change. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0012/18
    0 references