Use of renewable energy in Podkarpacie – development of distributed generation (Q118614): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Use of renewable energy in Podkarpacie – development of distributed generation

Revision as of 16:33, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Use of renewable energy in Podkarpacie – development of distributed generation
Project in Poland financed by DG Regio

    Statements

    0 references
    357,306.98 zloty
    0 references
    85,753.68 Euro
    13 January 2020
    0 references
    643,000.0 zloty
    0 references
    154,320.0 Euro
    13 January 2020
    0 references
    55.57 percent
    0 references
    20 March 2018
    0 references
    30 September 2019
    0 references
    EURO-RAMA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Niniejszy projekt obejmuje zadania inwestycyjne dotyczące budowy instalacji PV zlokalizowanych na terenie Gmin Ulanów i Borowa. Celem głównym projektu jest zwiększenie poziomu produkcji energii z odnawialnych źródeł energii w generacji rozproszonej. Cele szczegółowe projektu to: zmniejszenie emisji substancji szkodliwych i gazów cieplarnianych powstających w wyniku spalania węgla, zmniejszenie kosztów funkcjonowania obiektów należących do partnerów projektu, wprowadzenie i popularyzacja wśród mieszkańców nowoczesnych i ekologicznych źródeł energii, promocja działań dotyczących ochrony powietrza, tworzenie wizerunku gminy jako miejsca aktywności społecznej i gospodarczej. Projekt obejmuje budowę 2 instalacji o mocy 158,61 KW.System fotowoltaiczny projektowany w ramach zadania nr 1 wykonany zostanie na trzech budynkach zlokalizowanych przy ul. Cmentarnej 3, 37-410 Ulanów, działki ewidencyjne: 568/4; 566/3; 570; 569/3; 572,1; 2694/2; 592/7. Instalacja przyłączona zostanie do sieci wewnętrznej obiektów. Projektowana instalacja składa się z paneli fotowoltaicznych o łącznej mocy 155,61kWp. Panele przymocowane będą do własnej konstrukcji wsporczej Instalacja dodatkowo wyposażona zostanie w odpowiednio dobrane do paneli fotowoltaicznych falowniki. Każdy falownik wyposażony będzie w zabezpieczenie sieciowe, które automatycznie odłącza falownik od sieci w przypadku odchylenia się parametrów sieci od zapisanych ustawień (przełączenie stycznika na zaciskach wejściowych falownika). Instalacja wyposażona zostanie w system pomiarowy. (Polish)
    0 references
    This project covers investment tasks related to the construction of PV installations located in the Ulanów and Borów Municipalities. The main objective of the project is to increase the level of renewable energy production in distributed generation. The specific objectives of the project are: reducing emissions of harmful substances and greenhouse gases resulting from coal combustion, reducing the costs of operating facilities belonging to the project partners, introducing and popularising modern and ecological energy sources among residents, promotion of air protection measures, creating the image of the municipality as a place of social and economic activity. The project includes the construction of 2 installations with a capacity of 158.61 KW.The photovoltaic system designed as part of task 1 will be carried out on three buildings located at ul. Cemetery 3, 37-410 Ulanów, registration parcels: 568/4; 566/3; 570. 569/3; 572,1; 2694/2; IT’S 592/7. The installation will be connected to the internal network of objects. The designed installation consists of photovoltaic panels with a total power of 155.61kWp. Panels will be attached to their own support structure The installation will additionally be equipped with appropriately selected inverters for photovoltaic panels. Each inverter will be equipped with a network protection that automatically disconnects the inverter from the network if the network parameters deviate from the stored settings (switch the contactor at the input terminals of the inverter). The installation will be equipped with a measuring system. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.01.00-18-0566/17