Construction of a photovoltaic farm in Brzóza Stadnicka (Q118506): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources — the solar energy in Podkarpackie Province by the construction of a 1.17 MW photovoltaic power plant which converts solar radiation by direct conversion to electricity (direct implementation of the specific objective of POWP 3.1). the specific objectives will be 1. Increased production of energy from distributed renewable energy sources. 2. Reduce...)
(‎Created claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources – solar energy in Podkarpackie voivodship through the construction of 1.17 MW photovoltaic power plants, converting solar radiation by direct conversion to electric current (direct realisation of the specific objective of action 3.1 RPOWP). Increased production of energy from renewable energy sources in distributed generation. 2. Reduced emissions of...)
Property / summary
 
The main objective of the project is to increase the production of energy from renewable sources – solar energy in Podkarpackie voivodship through the construction of 1.17 MW photovoltaic power plants, converting solar radiation by direct conversion to electric current (direct realisation of the specific objective of action 3.1 RPOWP). Increased production of energy from renewable energy sources in distributed generation. 2. Reduced emissions of dust in urban centres of the voivodship.3. Better air quality in urban centres of the voivodship.4. Increasing the competitiveness of the Applicant’s enterprise through investments in environmental protection and RESThe project is to build a photovoltaic (solar) power plant on plot No 1279/2 and 1782/2 within the Municipality of Żołynia. Basic parameters of the installation:1. Installed power – 1,17 MW2. Amount of electricity produced – 1200 MWh/year3. Project infrastructure elements: a) Photovoltaic panels b) Inverters c) Intermediary dividers 230/400V ACD) Measuring system on the side 15 kV e) Support structures f) Transformer station 1600 kVA g) Measurement system on the side 0,4 kV h) Landing of the farm i) Execution and monitoring (j) Installation of peripheral protection with infrared barriers) System of control and monitoring of the photovoltaic farm. (English)
Property / summary: The main objective of the project is to increase the production of energy from renewable sources – solar energy in Podkarpackie voivodship through the construction of 1.17 MW photovoltaic power plants, converting solar radiation by direct conversion to electric current (direct realisation of the specific objective of action 3.1 RPOWP). Increased production of energy from renewable energy sources in distributed generation. 2. Reduced emissions of dust in urban centres of the voivodship.3. Better air quality in urban centres of the voivodship.4. Increasing the competitiveness of the Applicant’s enterprise through investments in environmental protection and RESThe project is to build a photovoltaic (solar) power plant on plot No 1279/2 and 1782/2 within the Municipality of Żołynia. Basic parameters of the installation:1. Installed power – 1,17 MW2. Amount of electricity produced – 1200 MWh/year3. Project infrastructure elements: a) Photovoltaic panels b) Inverters c) Intermediary dividers 230/400V ACD) Measuring system on the side 15 kV e) Support structures f) Transformer station 1600 kVA g) Measurement system on the side 0,4 kV h) Landing of the farm i) Execution and monitoring (j) Installation of peripheral protection with infrared barriers) System of control and monitoring of the photovoltaic farm. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to increase the production of energy from renewable sources – solar energy in Podkarpackie voivodship through the construction of 1.17 MW photovoltaic power plants, converting solar radiation by direct conversion to electric current (direct realisation of the specific objective of action 3.1 RPOWP). Increased production of energy from renewable energy sources in distributed generation. 2. Reduced emissions of dust in urban centres of the voivodship.3. Better air quality in urban centres of the voivodship.4. Increasing the competitiveness of the Applicant’s enterprise through investments in environmental protection and RESThe project is to build a photovoltaic (solar) power plant on plot No 1279/2 and 1782/2 within the Municipality of Żołynia. Basic parameters of the installation:1. Installed power – 1,17 MW2. Amount of electricity produced – 1200 MWh/year3. Project infrastructure elements: a) Photovoltaic panels b) Inverters c) Intermediary dividers 230/400V ACD) Measuring system on the side 15 kV e) Support structures f) Transformer station 1600 kVA g) Measurement system on the side 0,4 kV h) Landing of the farm i) Execution and monitoring (j) Installation of peripheral protection with infrared barriers) System of control and monitoring of the photovoltaic farm. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:21, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic farm in Brzóza Stadnicka
Project in Poland financed by DG Regio

    Statements

    0 references
    2,115,703.38 zloty
    0 references
    507,768.81 Euro
    13 January 2020
    0 references
    2,644,629.23 zloty
    0 references
    634,711.02 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 January 2018
    0 references
    31 October 2019
    0 references
    "AGMAD - SOLAR" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Głównym celem projektu jest zwiększenie produkcji energii z odnawialnych źródeł - energii słonecznej w województwie podkarpackim poprzez budowę elektrowni fotowoltaiczne 1,17 MW, zamieniającej energię promieniowania słonecznego w drodze bezpośredniej konwersji na prąd elektryczny (bezpośrednia realizacja celu szczegółowego działania 3.1 RPOWP).Celami szczegółowymi będą:1. Zwiększony poziom produkcji energii z odnawialnych źródeł energii w generacji rozproszonej. 2. Obniżona emisyjność pyłów w ośrodkach miejskich województwa.3. Lepsza jakość powietrza w ośrodkach miejskich województwa.4. Zwiększenie konkurencyjności przedsiębiorstwa Wnioskodawcy poprzez inwestycje w ochronę środowiska i OZEPrzedmiotem projektu jest budowa elektrowni fotowoltaicznej (słonecznej) na działce nr 1279/2 i 1782/2 w obrębie Gminy Żołynia. Podstawowe parametry instalacji:1. Moc zainstalowana - 1,17 MW2. Ilość wyprodukowanej energii elektrycznej - 1200 MWh/rok3. Elementy infrastruktury projektu: a) Panele fotowoltaiczne b) Inwertery c) Rozdzielnice pośrednie 230/400V ACd) Układ pomiarowy po stronie 15 kV e) Konstrukcje wsporcze f) Stacja transformatorowa 1600 kVA g) Układ pomiarowy po stronie 0,4kV h) Uziemienie farmy i) Oświetlenie i monitoring j) Instalacja ochrony obwodowej z barierami podczerwienik) System sterowania i monitorowania farmy fotowoltaicznejl) Przyłącze do sieci elektroenergetycznej Szczegółowo przedstawione w dokumentacji technicznej i studium wykonalności. (Polish)
    0 references
    The main objective of the project is to increase the production of energy from renewable sources – solar energy in Podkarpackie voivodship through the construction of 1.17 MW photovoltaic power plants, converting solar radiation by direct conversion to electric current (direct realisation of the specific objective of action 3.1 RPOWP). Increased production of energy from renewable energy sources in distributed generation. 2. Reduced emissions of dust in urban centres of the voivodship.3. Better air quality in urban centres of the voivodship.4. Increasing the competitiveness of the Applicant’s enterprise through investments in environmental protection and RESThe project is to build a photovoltaic (solar) power plant on plot No 1279/2 and 1782/2 within the Municipality of Żołynia. Basic parameters of the installation:1. Installed power – 1,17 MW2. Amount of electricity produced – 1200 MWh/year3. Project infrastructure elements: a) Photovoltaic panels b) Inverters c) Intermediary dividers 230/400V ACD) Measuring system on the side 15 kV e) Support structures f) Transformer station 1600 kVA g) Measurement system on the side 0,4 kV h) Landing of the farm i) Execution and monitoring (j) Installation of peripheral protection with infrared barriers) System of control and monitoring of the photovoltaic farm. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.01.00-18-0074/17
    0 references