Expansion of the photovoltaic installation on the roof of the production building of F.F. Wisan S.A. in Skopani with power up to 200 kW (Q118505): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Expansion of the photovoltaic installation on the roof of the production building of F.F. Wisan S.A. in Skopani with power up to 200 kW |
Revision as of 16:20, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Expansion of the photovoltaic installation on the roof of the production building of F.F. Wisan S.A. in Skopani with power up to 200 kW |
Project in Poland financed by DG Regio |
Statements
669,348.3 zloty
0 references
787,468.59 zloty
0 references
85.0 percent
0 references
1 May 2017
0 references
30 September 2019
0 references
FABRYKA FIRANEK „WISAN” SPÓŁKA AKCYJNA
0 references
Realizacja projektu pod nazwą „Rozbudowa instalacji fotowoltaicznej umieszczonej na dachu budynku produkcyjnego F.F. „Wisan” S.A. w Skopaniu o mocy do 200 kW” ma na celu uruchomienie produkcji energii elektrycznej z odnawialnego źródła w elektrowni o mocy zainstalowanej 196,56 kW. Celem głównym jest zmniejszenie kosztów produkcji oraz zwiększenie przychodów ze sprzedaży wyprodukowanej i niezużytej energii elektrycznej do własnej energochłonnej produkcji. Celami dodatkowymi jest poprawa jakości i ochrona środowiska naturalnego oraz zmniejszenie emisji gazów cieplarnianych do atmosfery. Projekt jest zlokalizowany na terenie Fabryki Firanek „Wisan” z siedzibą przy ulicy Włókniarzy 7, 39-451 Skopanie na działkach nr 1564/97; 1564/94; 1564/98 w miejscowości Skopanie w gminie Baranów Sandomierski. Wnioskowany zakres objęty Projektem jest rozbudową – realizacją drugiego etapu instalacji fotowoltaicznej objętej pozwoleniem na wykonanie robót, której pierwszy etap budowy został wykonany i oddany do użytku w 2015 roku o łącznej mocy 198 kW. Zakres Projektu obejmuje wykonanie i montaż instalacji na którą składają się następujących elementy i roboty: 1. Panele PV 260 Wp - 756 szt;2. Inwertery Trio 27,6 - 7 szt;3. Konstrukcja stalowa ocynkowana - 7 szt;4. Kable solarne oraz pozostały osprzęt elektryczny; 5. Maszty odgromowe - 14 szt;6. Montaż i uruchomienie elektrowni.W efekcie realizacji Projektu zostaną zmniejszone koszty działalności ponoszone z tytułu zużycia energii elektrycznej, jako podstawowego medium wykorzystywanego do energochłonnej produkcji prowadzonej przez fabrykę. Zużycie energii przez fabrykę firanek wyniosło w 2016 roku 4 586 MWh, w tym z własnej elektrowni fotowoltaicznej 206,5 MWh. Ilość energii, jaka będzie produkowana przez instalację fotowoltaiczną stanowiącą przedmiot Projektu łącznie z instalacją już użytkowaną (oddaną w 2015 roku do użytku o mocy 198 kW), osiągnie w skali roku około 9 % potrzeb fabryki, biorąc pod uwagę zużycie energii za 2016 rok. (Polish)
0 references
The project under the name "Expansion of the photovoltaic installation on the roof of the production building of F.F. "Wisan" S.A. in Skopani with capacity up to 200 kW is aimed at starting the production of electricity from a renewable source in a power plant with installed capacity of 196.56 kW. The main objective is to reduce production costs and increase revenues from the sale of produced and unused electricity to their own energy-intensive production. The additional objectives are to improve quality and protect the environment and reduce greenhouse gas emissions into the atmosphere. The project is located in the Firanek “Wisan” Factory with its registered office at ul. Włókniarzy 7, 39-451 Skopanie on plots no. 1564/97; 1564/94; 1564/98 in Skopanie in the municipality of Baranów Sandomierski. The proposed scope covered by the Project is an extension – the realisation of the second stage of the photovoltaic installation covered by the permit for the execution of works, the first stage of construction of which was completed and put into service in 2015 with a total capacity of 198 kW. The scope of the Project includes the construction and installation of the installation consisting of the following elements and works: 1. PV 260 Wp panels – 756 pcs;2. Inverters Trio 27.6-7 pcs;3. Galvanised steel structure – 7 pcs;4. Solar cables and other electrical accessories; 5. Lightning masts – 14 pcs;6. Installation and commissioning of the power plant.As a result of the implementation of the Project, the operating costs incurred by the electricity consumption will be reduced as the basic medium used for energy-intensive production carried out by the factory. The power consumption of the curtain factory in 2016 amounted to 4586 MWh, including its own photovoltaic power plant 206.5 MWh. The amount of energy that will be produced by the PV installation which is the subject of the Project, including the installation already in use (putd in 2015 for use with a capacity of 198 kW), will reach approximately 9 % of the plant’s needs per year, taking into account the energy consumption for 2016. (English)
20 October 2020
0 references
Identifiers
RPPK.03.01.00-18-0073/17
0 references