Installation of renewable energy systems for households in the municipality of Piakowe and the municipality of Chorkówka (Q118473): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Held. In the municipality of Chorkówka, 431 households will be included in the project, which will include 489 installations using renewable energy sources, including 107 flat solar collectors kits; 326 solar and 56 biomass heating boilers. 321 households will be included in the Piastate project where 375 renewable energy sources, including 313 solar installations and 62 central biomass heating boilers, will be installed. This will allow for t...)
(‎Created claim: summary (P836): It’s a sandy one. In Chorkówka the project will cover 431 households with 489 renewable energy installations, including 107 sets of flat solar collectors; 326 photovoltaic installations and 56 central heating boilers per biomass. The project will include 321 households with 375 renewable energy installations, including 313 photovoltaic installations and 62 biomass central heating boilers. This will allow for additional production capacity: — ele...)
Property / summary
 
It’s a sandy one. In Chorkówka the project will cover 431 households with 489 renewable energy installations, including 107 sets of flat solar collectors; 326 photovoltaic installations and 56 central heating boilers per biomass. The project will include 321 households with 375 renewable energy installations, including 313 photovoltaic installations and 62 biomass central heating boilers. This will allow for additional production capacity: — electricity from renewable sources = 1,80 [MWe]; — thermal energy from renewable sources = 3,57 [MWt]. Number of manufactured units built: — electricity from RES = 639 pcs. — thermal energy from RES = 225 pcs. The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the municipalities of Chorkówka and Piastowe Place. The general objectives are: improving the well-being of residents; reduced emissions from low-height emitters; improving energy efficiency in individual housing – high energy supply costs; reduced health risk to residents arising from increasing air pollution; promoting energy-saving attitudes; increasing the responsibility of residents for the state of the environment and air pollution; combating climate change and enhancing the resilience of local energy systems to the risks arising from these changes. The project is implemented in a partnership between the municipalities of Chorkówka and the Piast Place. The Municipality of Place Piastowe will be the project leader and in a comprehensive way will ensure the preparation, implementation and coordination of the project. (English)
Property / summary: It’s a sandy one. In Chorkówka the project will cover 431 households with 489 renewable energy installations, including 107 sets of flat solar collectors; 326 photovoltaic installations and 56 central heating boilers per biomass. The project will include 321 households with 375 renewable energy installations, including 313 photovoltaic installations and 62 biomass central heating boilers. This will allow for additional production capacity: — electricity from renewable sources = 1,80 [MWe]; — thermal energy from renewable sources = 3,57 [MWt]. Number of manufactured units built: — electricity from RES = 639 pcs. — thermal energy from RES = 225 pcs. The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the municipalities of Chorkówka and Piastowe Place. The general objectives are: improving the well-being of residents; reduced emissions from low-height emitters; improving energy efficiency in individual housing – high energy supply costs; reduced health risk to residents arising from increasing air pollution; promoting energy-saving attitudes; increasing the responsibility of residents for the state of the environment and air pollution; combating climate change and enhancing the resilience of local energy systems to the risks arising from these changes. The project is implemented in a partnership between the municipalities of Chorkówka and the Piast Place. The Municipality of Place Piastowe will be the project leader and in a comprehensive way will ensure the preparation, implementation and coordination of the project. (English) / rank
 
Normal rank
Property / summary: It’s a sandy one. In Chorkówka the project will cover 431 households with 489 renewable energy installations, including 107 sets of flat solar collectors; 326 photovoltaic installations and 56 central heating boilers per biomass. The project will include 321 households with 375 renewable energy installations, including 313 photovoltaic installations and 62 biomass central heating boilers. This will allow for additional production capacity: — electricity from renewable sources = 1,80 [MWe]; — thermal energy from renewable sources = 3,57 [MWt]. Number of manufactured units built: — electricity from RES = 639 pcs. — thermal energy from RES = 225 pcs. The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the municipalities of Chorkówka and Piastowe Place. The general objectives are: improving the well-being of residents; reduced emissions from low-height emitters; improving energy efficiency in individual housing – high energy supply costs; reduced health risk to residents arising from increasing air pollution; promoting energy-saving attitudes; increasing the responsibility of residents for the state of the environment and air pollution; combating climate change and enhancing the resilience of local energy systems to the risks arising from these changes. The project is implemented in a partnership between the municipalities of Chorkówka and the Piast Place. The Municipality of Place Piastowe will be the project leader and in a comprehensive way will ensure the preparation, implementation and coordination of the project. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:20, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of renewable energy systems for households in the municipality of Piakowe and the municipality of Chorkówka
Project in Poland financed by DG Regio

    Statements

    0 references
    8,945,378.21 zloty
    0 references
    2,146,890.77 Euro
    13 January 2020
    0 references
    12,779,111.75 zloty
    0 references
    3,066,986.82 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    3 November 2016
    0 references
    15 October 2019
    0 references
    GMINA MIEJSCE PIASTOWE
    0 references
    Piastowe. W Gminie Chorkówka projektem objętych zostanie 431 gospodarstw domowych, w których zainstalowanych zostanie 489 instalacji wykorzystujących odnawialne źródła energii, w tym 107 zestawów kolektorów słonecznych płaskich; 326 instalacji fotowoltaicznych i 56 kotłów centralnego ogrzewania na biomasę. W Miejsce Piastowe projektem objętych zostanie 321 gospodarstw domowych, w których zainstalowanych zostanie 375 instalacji wykorzystujące odnawialne źródła energii, w tym 313 instalacje fotowoltaiczne i 62 kotły centralnego ogrzewania na biomasę. Pozwoli to na dodatkową zdolność wytwarzania: - energii elektrycznej ze źródeł odnawialnych = 1,80 [MWe]; - energii cieplnej ze źródeł odnawialnych = 3,57 [MWt]. Liczba wybudowanych jednostek wytwarzania: - energii elektrycznej z OZE = 639 szt. - energii cieplnej z OZE =225 szt. Celem bezpośrednim projektu jest podwyższenie poziomu produkcji energii z odnawialnych źródeł energii w generacji rozproszonej na terenie gmin Chorkówka i Miejsce Piastowe. Cele ogólne to: poprawa komfortu życia mieszkańców; zmniejszona emisja zanieczyszczeń z emitorów o niskiej wysokości; poprawa efektywności energetycznej w indywidualnych budynkach mieszkalnych - wysokie koszty zaopatrzenia w energię; zmniejszone zagrożenie dla zdrowia mieszkańców wynikające z wzrastającego zanieczyszczenia powietrza; promowanie postaw związanych z oszczędzaniem energii; zwiększenie odpowiedzialności mieszkańców za stan środowiska i zanieczyszczenie powietrza; przeciwdziałanie zmianom klimatu i zwiększanie odporności lokalnych systemów energetycznych na zagrożenia wynikające z tych zmian. Projekt jest realizowany w partnerstwie gmin Chorkówka i Miejsce Piastowe. Gmina Miejsce Piastowe będzie liderem projektu i w kompleksowy sposób zapewni przygotowanie, realizację i koordynację projektu. (Polish)
    0 references
    It’s a sandy one. In Chorkówka the project will cover 431 households with 489 renewable energy installations, including 107 sets of flat solar collectors; 326 photovoltaic installations and 56 central heating boilers per biomass. The project will include 321 households with 375 renewable energy installations, including 313 photovoltaic installations and 62 biomass central heating boilers. This will allow for additional production capacity: — electricity from renewable sources = 1,80 [MWe]; — thermal energy from renewable sources = 3,57 [MWt]. Number of manufactured units built: — electricity from RES = 639 pcs. — thermal energy from RES = 225 pcs. The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the municipalities of Chorkówka and Piastowe Place. The general objectives are: improving the well-being of residents; reduced emissions from low-height emitters; improving energy efficiency in individual housing – high energy supply costs; reduced health risk to residents arising from increasing air pollution; promoting energy-saving attitudes; increasing the responsibility of residents for the state of the environment and air pollution; combating climate change and enhancing the resilience of local energy systems to the risks arising from these changes. The project is implemented in a partnership between the municipalities of Chorkówka and the Piast Place. The Municipality of Place Piastowe will be the project leader and in a comprehensive way will ensure the preparation, implementation and coordination of the project. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.01.00-18-0016/17
    0 references