Preschool of my dreams — construction of a community crèche through the development of nursery school No 1 in Lower Silesia (Q119142): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of an extension, of the Pre-School No 1 in the Lower House. The planned teaching strand of the new section: 190, m 2. The building will be expanded and one, and two floors, would be the connecting factor of the podpiwek. This will consist of the extension of the facility from the South to the additional learning rooms, including the exercise room and the speech therapy, changing rooms and the auxiliary facilities (with a c...) |
(Created claim: summary (P836): The project includes the extension of the Preschool No. 1 in Ustrzyky Dolny. Planned teaching area of the new part: 190, 2 feet. The planned expansion will be one – and two floors. cellar connector. It will consist of enlarging the facility on the south side by additional teaching rooms, including exercise room and Logopedyczny office, lockers and auxiliary rooms (with total area. 754.4 m 2). The new part of the building will be connected by a g...) |
||||||||||||||
Property / summary | |||||||||||||||
The project includes the extension of the Preschool No. 1 in Ustrzyky Dolny. Planned teaching area of the new part: 190, 2 feet. The planned expansion will be one – and two floors. cellar connector. It will consist of enlarging the facility on the south side by additional teaching rooms, including exercise room and Logopedyczny office, lockers and auxiliary rooms (with total area. 754.4 m 2). The new part of the building will be connected by a glass link to the existing part at the level of the current ground floor. There will be a new locker room for children attending kindergarten (for rooms in the old and new parts). At the same time, there will be a second entrance to the ground level (level -1) of the new part and a small locker room at this level for younger children. The entire building will be adapted to new heat requirements after construction and will be available at all levels for people with reduced mobility, also for people on a wheelchair and I have with children in wheelchairs. In front of the main entrance a ramp will be added, and a passenger crane connecting all the floors of the new and existing part of the building will be added. Scope OF REGULATION – It is planned to expand the existing kindergarten building for the purpose of the creation of a nursery. — The planned extension will be one- and two-storey, cellared connector. — The planned extension will consist of enlarging the facility from the south by additional classrooms, dressing rooms and auxiliary rooms. — Construction is planned in a traditional system (concrete pouring and masonry): the construction system is based on masonry supporting walls, supplemented locally by posts and reinforced concrete substrings, monolithic reinforced concrete ceilings, two-sided roofs on wooden structure, covered with tile sheet. — The current function of the building, extended to include a cradle, is envisaged to create an additional 3 branches for children under the age of 3. — It is designed to paint the whole new building. — In the built part of the building there will be the necessary installations. (English) | |||||||||||||||
Property / summary: The project includes the extension of the Preschool No. 1 in Ustrzyky Dolny. Planned teaching area of the new part: 190, 2 feet. The planned expansion will be one – and two floors. cellar connector. It will consist of enlarging the facility on the south side by additional teaching rooms, including exercise room and Logopedyczny office, lockers and auxiliary rooms (with total area. 754.4 m 2). The new part of the building will be connected by a glass link to the existing part at the level of the current ground floor. There will be a new locker room for children attending kindergarten (for rooms in the old and new parts). At the same time, there will be a second entrance to the ground level (level -1) of the new part and a small locker room at this level for younger children. The entire building will be adapted to new heat requirements after construction and will be available at all levels for people with reduced mobility, also for people on a wheelchair and I have with children in wheelchairs. In front of the main entrance a ramp will be added, and a passenger crane connecting all the floors of the new and existing part of the building will be added. Scope OF REGULATION – It is planned to expand the existing kindergarten building for the purpose of the creation of a nursery. — The planned extension will be one- and two-storey, cellared connector. — The planned extension will consist of enlarging the facility from the south by additional classrooms, dressing rooms and auxiliary rooms. — Construction is planned in a traditional system (concrete pouring and masonry): the construction system is based on masonry supporting walls, supplemented locally by posts and reinforced concrete substrings, monolithic reinforced concrete ceilings, two-sided roofs on wooden structure, covered with tile sheet. — The current function of the building, extended to include a cradle, is envisaged to create an additional 3 branches for children under the age of 3. — It is designed to paint the whole new building. — In the built part of the building there will be the necessary installations. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project includes the extension of the Preschool No. 1 in Ustrzyky Dolny. Planned teaching area of the new part: 190, 2 feet. The planned expansion will be one – and two floors. cellar connector. It will consist of enlarging the facility on the south side by additional teaching rooms, including exercise room and Logopedyczny office, lockers and auxiliary rooms (with total area. 754.4 m 2). The new part of the building will be connected by a glass link to the existing part at the level of the current ground floor. There will be a new locker room for children attending kindergarten (for rooms in the old and new parts). At the same time, there will be a second entrance to the ground level (level -1) of the new part and a small locker room at this level for younger children. The entire building will be adapted to new heat requirements after construction and will be available at all levels for people with reduced mobility, also for people on a wheelchair and I have with children in wheelchairs. In front of the main entrance a ramp will be added, and a passenger crane connecting all the floors of the new and existing part of the building will be added. Scope OF REGULATION – It is planned to expand the existing kindergarten building for the purpose of the creation of a nursery. — The planned extension will be one- and two-storey, cellared connector. — The planned extension will consist of enlarging the facility from the south by additional classrooms, dressing rooms and auxiliary rooms. — Construction is planned in a traditional system (concrete pouring and masonry): the construction system is based on masonry supporting walls, supplemented locally by posts and reinforced concrete substrings, monolithic reinforced concrete ceilings, two-sided roofs on wooden structure, covered with tile sheet. — The current function of the building, extended to include a cradle, is envisaged to create an additional 3 branches for children under the age of 3. — It is designed to paint the whole new building. — In the built part of the building there will be the necessary installations. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 16:16, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Preschool of my dreams — construction of a community crèche through the development of nursery school No 1 in Lower Silesia |
Project in Poland financed by DG Regio |
Statements
940,751.23 zloty
0 references
2,629,265.65 zloty
0 references
35.78 percent
0 references
1 March 2016
0 references
29 December 2017
0 references
GMINA USTRZYKI DOLNE
0 references
Projekt obejmuje rozbudowę, budynku Przedszkola nr 1 w Ustrzykach Dolnych. Planowana pow. dydaktyczna nowej części: 190, m 2 . Planowana rozbud. będzie jedno – i dwu kondygnac. łącznik podpiwniczony. Polegać będzie na powiększeniu obiektu od strony południowej o dodatkowe sale dydaktyczne, w tym salę ćwiczeń i gabinet logopedyczny, szatnie i pomieszczenia pomocnicze (o łącznej pow. 754,4 m 2 ). Nowa część budynku zostanie połączona przeszklonym łącznikiem z częścią istniejącą na poziomie obecnego parteru. Przy łączniku powstanie nowa szatnia dla dzieci uczęszczających do przedszkola (do sal w starej i nowej części). Równocześnie powstanie drugie wejście na poziom przyziemia (poziom -1) nowej części i małą szatnię na tym poziomie dla dzieci młodszych. Cały budynek po budowie zostanie dostosowany do nowych wymogów cieplnych oraz będzie dostępny na każdym poziomie dla osób z ograniczoną zdolnością poruszania się, również dla osób na wózku i mam z dziećmi w wózkach. Przed głównym wejściem zostanie dobudowana pochylnia, a w łączniku dźwig osobowy łączący wszystkie kondygnacje nowej i istniejącej części budynku. ZAKRES ROBÓT - Planuje się rozbudowę istniejącego budynku przedszkola na cele powstania żłobka. - Projektowana rozbudowa będzie jedno- i dwukondygnacyjna, łącznik podpiwniczony. - Planowana rozbudowa polegać będzie na powiększeniu obiektu od strony południowej o dodatkowe sale zajęć, szatnie i pomieszczenia pomocnicze. - Planuje się budowę w systemie tradycyjnym (wylewanie betonu na budowie i murowanie): układ konstrukcyjny w oparciu o ściany nośne murowane, uzupełnione miejscowo słupami i podciągami żelbetowymi, stropy monolityczne żelbetowe, dachy dwuspadowe na konstrukcji drewnianej, pokryte blachą dachówkową. - Obecna funkcja budynku rozszerzona o żlobek, przewiduje się stworzenie dodatkowo 3 oddziałów dla dzieci w wieku do lat 3. - Projektuje się malowanie całego nowego budynku. - W wybudowanej części obiektu zastaną wykonane potrzebne instalacje. (Polish)
0 references
The project includes the extension of the Preschool No. 1 in Ustrzyky Dolny. Planned teaching area of the new part: 190, 2 feet. The planned expansion will be one – and two floors. cellar connector. It will consist of enlarging the facility on the south side by additional teaching rooms, including exercise room and Logopedyczny office, lockers and auxiliary rooms (with total area. 754.4 m 2). The new part of the building will be connected by a glass link to the existing part at the level of the current ground floor. There will be a new locker room for children attending kindergarten (for rooms in the old and new parts). At the same time, there will be a second entrance to the ground level (level -1) of the new part and a small locker room at this level for younger children. The entire building will be adapted to new heat requirements after construction and will be available at all levels for people with reduced mobility, also for people on a wheelchair and I have with children in wheelchairs. In front of the main entrance a ramp will be added, and a passenger crane connecting all the floors of the new and existing part of the building will be added. Scope OF REGULATION – It is planned to expand the existing kindergarten building for the purpose of the creation of a nursery. — The planned extension will be one- and two-storey, cellared connector. — The planned extension will consist of enlarging the facility from the south by additional classrooms, dressing rooms and auxiliary rooms. — Construction is planned in a traditional system (concrete pouring and masonry): the construction system is based on masonry supporting walls, supplemented locally by posts and reinforced concrete substrings, monolithic reinforced concrete ceilings, two-sided roofs on wooden structure, covered with tile sheet. — The current function of the building, extended to include a cradle, is envisaged to create an additional 3 branches for children under the age of 3. — It is designed to paint the whole new building. — In the built part of the building there will be the necessary installations. (English)
20 October 2020
0 references
Identifiers
RPPK.06.02.02-18-0009/16
0 references