Construction of provincial road No 987 on the section from DK 94 to ul. EU Cost to DP 1334 R (Q119067): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The implementation of this project is necessary in order to improve the connectivity of the entire region of the North-East and the central part of the Podkarpackie region with the A4 motorway and national road No 94. In order to facilitate the level crossing by region No 987 and make it available to all vehicle categories, it is necessary to change its course so as to ensure that the rail viaduct in km 133 + 341 is being circumvented by railw...)
(‎Created claim: summary (P836): Implementation of this project is necessary in order to improve the communication of the entire north-eastern region and the central part of Podkarpackie voivodship with the A4 motorway and national road No. 94. In order to improve the journey of voivodship road No. 987 and make it available to all categories of vehicles, it is necessary to change its course in such a way as to ensure that the railway viaduct in km 133 + 341 of railway line No....)
Property / summary
 
Implementation of this project is necessary in order to improve the communication of the entire north-eastern region and the central part of Podkarpackie voivodship with the A4 motorway and national road No. 94. In order to improve the journey of voivodship road No. 987 and make it available to all categories of vehicles, it is necessary to change its course in such a way as to ensure that the railway viaduct in km 133 + 341 of railway line No. 91 is bypassed. As a result of the construction of the new section of DW 987, the transport capacity of this region will increase, improve the liquidity of communication and the availability of entrepreneurs to existing economic zones. The implementation of the investment will also be of great local importance for the City and the Municipality of Sędziszów Młp. — will improve traffic safety and comfort of life of residents exposed to increased traffic on the road with poor surface condition and environmental nuisance (burning, noise). The projected section of the Voivodeship Road No. 987 is a continuation of the construction of a new section of the Voivodeship Road No. 987 implemented within the framework of an agreement concluded with PKP PLK S.A. The scope of the planned investment includes the construction of a section of the DW 987 road after a new track with a length of 0.8 km [class of the G road, carrying capacity of 115kN/axis, width of the road 7 m along with bitumen roads wide. 0.5 m and a wide aggregate. 0.75 m] and construction of a section of the DW 987 road after the trace of the existing communal road (ul. The Grand Duchy of Młp.) with a length of approx. 0.44 km along with the construction of an ordinary intersection with ul. The Duchy and the roundabout (crossing with DK94) [G class, load capacity 115kN/axle]In addition: construction/reconstruction of road drainage including rainwater drainage, construction/reconstruction of culverts, execution of individual and public exits, reconstruction/construction of lighting, reconstruction and security of existing technical networks, execution of vertical and horizontal marking and road safety elements, construction of pavement and environmental protection equipment. (English)
Property / summary: Implementation of this project is necessary in order to improve the communication of the entire north-eastern region and the central part of Podkarpackie voivodship with the A4 motorway and national road No. 94. In order to improve the journey of voivodship road No. 987 and make it available to all categories of vehicles, it is necessary to change its course in such a way as to ensure that the railway viaduct in km 133 + 341 of railway line No. 91 is bypassed. As a result of the construction of the new section of DW 987, the transport capacity of this region will increase, improve the liquidity of communication and the availability of entrepreneurs to existing economic zones. The implementation of the investment will also be of great local importance for the City and the Municipality of Sędziszów Młp. — will improve traffic safety and comfort of life of residents exposed to increased traffic on the road with poor surface condition and environmental nuisance (burning, noise). The projected section of the Voivodeship Road No. 987 is a continuation of the construction of a new section of the Voivodeship Road No. 987 implemented within the framework of an agreement concluded with PKP PLK S.A. The scope of the planned investment includes the construction of a section of the DW 987 road after a new track with a length of 0.8 km [class of the G road, carrying capacity of 115kN/axis, width of the road 7 m along with bitumen roads wide. 0.5 m and a wide aggregate. 0.75 m] and construction of a section of the DW 987 road after the trace of the existing communal road (ul. The Grand Duchy of Młp.) with a length of approx. 0.44 km along with the construction of an ordinary intersection with ul. The Duchy and the roundabout (crossing with DK94) [G class, load capacity 115kN/axle]In addition: construction/reconstruction of road drainage including rainwater drainage, construction/reconstruction of culverts, execution of individual and public exits, reconstruction/construction of lighting, reconstruction and security of existing technical networks, execution of vertical and horizontal marking and road safety elements, construction of pavement and environmental protection equipment. (English) / rank
 
Normal rank
Property / summary: Implementation of this project is necessary in order to improve the communication of the entire north-eastern region and the central part of Podkarpackie voivodship with the A4 motorway and national road No. 94. In order to improve the journey of voivodship road No. 987 and make it available to all categories of vehicles, it is necessary to change its course in such a way as to ensure that the railway viaduct in km 133 + 341 of railway line No. 91 is bypassed. As a result of the construction of the new section of DW 987, the transport capacity of this region will increase, improve the liquidity of communication and the availability of entrepreneurs to existing economic zones. The implementation of the investment will also be of great local importance for the City and the Municipality of Sędziszów Młp. — will improve traffic safety and comfort of life of residents exposed to increased traffic on the road with poor surface condition and environmental nuisance (burning, noise). The projected section of the Voivodeship Road No. 987 is a continuation of the construction of a new section of the Voivodeship Road No. 987 implemented within the framework of an agreement concluded with PKP PLK S.A. The scope of the planned investment includes the construction of a section of the DW 987 road after a new track with a length of 0.8 km [class of the G road, carrying capacity of 115kN/axis, width of the road 7 m along with bitumen roads wide. 0.5 m and a wide aggregate. 0.75 m] and construction of a section of the DW 987 road after the trace of the existing communal road (ul. The Grand Duchy of Młp.) with a length of approx. 0.44 km along with the construction of an ordinary intersection with ul. The Duchy and the roundabout (crossing with DK94) [G class, load capacity 115kN/axle]In addition: construction/reconstruction of road drainage including rainwater drainage, construction/reconstruction of culverts, execution of individual and public exits, reconstruction/construction of lighting, reconstruction and security of existing technical networks, execution of vertical and horizontal marking and road safety elements, construction of pavement and environmental protection equipment. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:14, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of provincial road No 987 on the section from DK 94 to ul. EU Cost to DP 1334 R
Project in Poland financed by DG Regio

    Statements

    0 references
    6,353,438.6 zloty
    0 references
    1,524,825.26 Euro
    13 January 2020
    0 references
    7,474,633.68 zloty
    0 references
    1,793,912.08 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    31 August 2017
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO PODKARPACKIE
    0 references
    Realizacja niniejszego projektu jest niezbędna w celu poprawy skomunikowania całego regionu północno – wschodniej oraz środkowej części województwa podkarpackiego z autostradą A4 oraz drogą krajową Nr 94. W celu usprawnienia przejazdu drogą wojewódzką nr 987 i udostępnienia jej wszystkim kategoriom pojazdów niezbędna jest zmiana jej przebiegu w sposób zapewniający ominięcie wiaduktu kolejowego w km 133+341 linii kolejowej nr 91. Wskutek budowy nowego odcinka DW 987 zwiększy się przepustowość transportowa tego regionu, poprawi płynność komunikacji oraz dostępność przedsiębiorców do istniejących stref ekonomicznych. Realizacja inwestycji będzie miała również duże znaczenie lokalne dla Miasta i Gminy Sędziszów Młp. – doprowadzi do poprawy bezpieczeństwa ruchu i komfortu życia mieszkańców narażonych do tej pory na wzmożony ruch samochodowy po drodze o nie najlepszym stanie nawierzchni oraz uciążliwości środowiskowe (spaliny, hałas). Projektowany odcinek drogi wojewódzkiej nr 987 jest kontynuacją budowy nowego odcinka drogi wojewódzkiej Nr 987 realizowanej w ramach umowy zawartej z PKP PLK S.A. Zakres planowanej inwestycji obejmuje budowę odcinka drogi DW 987 po nowym śladzie o długości 0,8 km [klasa drogi G, nośność 115kN/oś, szerokość jezdni 7m wraz z poboczami bitumicznymi szer. 0,5m i z kruszywa szer. 0,75m] oraz budowę odcinka drogi DW 987 po śladzie istniejącej drogi gminnej (ul. Księżomost w m. Sędziszów Młp.) o długości ok. 0,44 km wraz z budową skrzyżowania zwykłego z ul. Księżomost oraz ronda jednopasowego (skrzyżowanie z DK94) [klasa drogi G, nośność 115kN/oś]Ponadto przewidziano: budowę/przebudowę odwodnienia drogi, w tym kanalizacji deszczowej, budowę/przebudowę przepustów, wykonanie zjazdów indywidualnych i publicznych, przebudowę/budowę oświetlenia, przebudowę i zabezpieczenie istniejących sieci technicznych, wykonanie oznakowania pionowego i poziomego oraz elementów bezpieczeństwa ruchu drogowego, budowę chodnika oraz urządzeń ochrony środowiska. (Polish)
    0 references
    Implementation of this project is necessary in order to improve the communication of the entire north-eastern region and the central part of Podkarpackie voivodship with the A4 motorway and national road No. 94. In order to improve the journey of voivodship road No. 987 and make it available to all categories of vehicles, it is necessary to change its course in such a way as to ensure that the railway viaduct in km 133 + 341 of railway line No. 91 is bypassed. As a result of the construction of the new section of DW 987, the transport capacity of this region will increase, improve the liquidity of communication and the availability of entrepreneurs to existing economic zones. The implementation of the investment will also be of great local importance for the City and the Municipality of Sędziszów Młp. — will improve traffic safety and comfort of life of residents exposed to increased traffic on the road with poor surface condition and environmental nuisance (burning, noise). The projected section of the Voivodeship Road No. 987 is a continuation of the construction of a new section of the Voivodeship Road No. 987 implemented within the framework of an agreement concluded with PKP PLK S.A. The scope of the planned investment includes the construction of a section of the DW 987 road after a new track with a length of 0.8 km [class of the G road, carrying capacity of 115kN/axis, width of the road 7 m along with bitumen roads wide. 0.5 m and a wide aggregate. 0.75 m] and construction of a section of the DW 987 road after the trace of the existing communal road (ul. The Grand Duchy of Młp.) with a length of approx. 0.44 km along with the construction of an ordinary intersection with ul. The Duchy and the roundabout (crossing with DK94) [G class, load capacity 115kN/axle]In addition: construction/reconstruction of road drainage including rainwater drainage, construction/reconstruction of culverts, execution of individual and public exits, reconstruction/construction of lighting, reconstruction and security of existing technical networks, execution of vertical and horizontal marking and road safety elements, construction of pavement and environmental protection equipment. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.05.01.00-18-0033/17
    0 references