Construction of the bypass of Kolbuszów and Weryn along the Voivodeship Road No. 875 Mielec – Leżajsk (Q119043): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q119043 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q119043 w Polsce |
Revision as of 14:57, 29 October 2020
Project Q119043 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the bypass of Kolbuszów and Weryn along the Voivodeship Road No. 875 Mielec – Leżajsk |
Project Q119043 in Poland |
Statements
44,256,484.38 zloty
0 references
52,066,452.25 zloty
0 references
85.0 percent
0 references
25 October 2016
0 references
31 December 2019
0 references
WOJEWÓDZTWO PODKARPACKIE
0 references
Przedmiotem przedsięwzięcia jest budowa drogi wojewódzkiej 875 (droga klasy G, kategoria ruchu KR4) na terenie gmin Kolbuszowa i Dzikowiec. W ramach inwestycji przewidziano:- Budowę i rozbudowę drogi i jej połączeń z drogami istniejącymi;- Budowę obiektów inżynierskich wynikających z w/w zakresu drogowego (wiadukt nad koleją, most nad rzeka Werynia);- Budowę jednopoziomowych skrzyżowań z drogami przecinającymi - jedno rondo, dwa skrzyżowania skanalizowane ;- Budowę zjazdów oraz dróg dojazdowych zapewniających dostęp do dróg publicznych;- Budowę urządzeń dla ruchu pieszego;- Budowę układu odwodnienia drogi odpowiadającej warunkom decyzji środowiskowej oraz uwarunkowaniom terenowym; - Budowę oświetlenia drogi;- Budowę, przebudowę / rozbudowę lub zabezpieczenie kolidujących urządzeń infrastruktury zewnętrznej;- Budowę wymaganych urządzeń ochrony środowiska;- Wykonanie oznakowania drogi oraz urządzeń bezpieczeństwa ruchu drogowego. Podstawowe parametry techniczne budowanej drogi wojewódzkiej nr 875:- Klasa techniczna drogi - G;- Przekrój drogi - 1 jezdnia z 2 pasami ruchu;- Pas ruchu - 3,50m.;- Opaska bitumiczna - min. 0,50 m.;- Pobocze gruntowe min. 0,75 m.;- Dodatkowy pas ruchu dla pojazdów skręcających w lewo o szerokości min. 3,0 m.;- Rowy drogowe trapezowe ziemne odcinkowo umocnione;Realizacja przedmiotowego przedsięwzięcia ma na celu: skrócenie czasu przejazdu samochodów, podwyższenie bezpieczeństwa ruchu drogowego, polepszenie warunków ruchu, zmniejszenie dla mieszkańców i środowiska uciążliwości spowodowanych ruchem. (Polish)
0 references
The subject of the project is the construction of the 875 voivodeship road (class G road, KR4 traffic category) in the municipalities of Kolbuszowa and Dzikowiec. The investment includes:- Construction and extension of the road and its connections with existing roads;- Construction of engineering facilities resulting from the abovementioned road range (viaduct over the railway, bridge over the river Verynia);- Construction of single-level intersections with intersections – one roundabout, two intersections, two intersections;- Construction of exits and access roads providing access to public roads;- Construction of waterways for pedestrian traffic; — Construction of road lighting;- Construction, reconstruction/expansion or protection of interfering external infrastructure equipment;- Construction of required environmental protection devices;- Execution of road marking and road safety equipment. Basic technical parameters of the built voivodeship road no. 875:- Technical class of the road – G;- Cross road – 1 roadway with 2 lanes;- Traffic belt – 3,50 m.;- Bituminous rail – min. 0,50 m.;- Groundsides min. 0,75 m.;- Additional lane for vehicles turning left with a width of min. 3,0 m.;- Trapeeze ditches with a specific purpose: concretely strengthened; reduced driving times, increased road safety, improved traffic conditions, reduction of traffic burdens for residents and the environment. (English)
20 October 2020
0 references
Identifiers
RPPK.05.01.00-18-0002/17
0 references