Introduction of an innovative vacuum drainage service with high pressure Upstream technology using high speed mostupdays and evidence-based filters based on the results of R & D (Q118320): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): As a result of the project, an innovative sub-pressurised water drainage service using an advanced needle-fitting technology and based on the results of R & D performed by the applicant will be introduced into the firm’s bid. The project consists of the purchase of three fixed assets, such as: a crawler excavator, vibrating hammer and the filter aggregate in a sound-absorbent housing with an installation. The service will be innovative on a gl...) |
(Created claim: summary (P836): As a result of the project, an innovative service will be introduced to the company’s offer of deep excavation drainage using the use of advanced technology of assembly and voice and needle filters based on the results of R & D works carried out by the applicant. The project consists of the purchase of three fixed assets, such as: a caterpillar excavator, a vibration hammer and a flat filter unit in a sound-absorbing housing together with the in...) |
||||||||||||||
Property / summary | |||||||||||||||
As a result of the project, an innovative service will be introduced to the company’s offer of deep excavation drainage using the use of advanced technology of assembly and voice and needle filters based on the results of R & D works carried out by the applicant. The project consists of the purchase of three fixed assets, such as: a caterpillar excavator, a vibration hammer and a flat filter unit in a sound-absorbing housing together with the installation. The service introduced will be characterised by innovation on a global scale. (English) | |||||||||||||||
Property / summary: As a result of the project, an innovative service will be introduced to the company’s offer of deep excavation drainage using the use of advanced technology of assembly and voice and needle filters based on the results of R & D works carried out by the applicant. The project consists of the purchase of three fixed assets, such as: a caterpillar excavator, a vibration hammer and a flat filter unit in a sound-absorbing housing together with the installation. The service introduced will be characterised by innovation on a global scale. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As a result of the project, an innovative service will be introduced to the company’s offer of deep excavation drainage using the use of advanced technology of assembly and voice and needle filters based on the results of R & D works carried out by the applicant. The project consists of the purchase of three fixed assets, such as: a caterpillar excavator, a vibration hammer and a flat filter unit in a sound-absorbing housing together with the installation. The service introduced will be characterised by innovation on a global scale. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 15:58, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Introduction of an innovative vacuum drainage service with high pressure Upstream technology using high speed mostupdays and evidence-based filters based on the results of R & D |
Project in Poland financed by DG Regio |
Statements
1,025,375.0 zloty
0 references
1,577,500.0 zloty
0 references
65.0 percent
0 references
1 March 2017
0 references
30 June 2017
0 references
PRZEDSIĘBIORSTWO PRODUKCYJNO-USŁUGOWO-HANDLOWE "ARBUD" ARTUR CZAPKA
0 references
W wyniku realizacji projektu do oferty firmy wprowadzona zostanie innowacyjna usługa odwadniania głębokich wykopów metodą podciśnieniową z wykorzystaniem zaawansowanej technologii montażu igłostudni i igłofiltrów opartej na wynikach prac B+R przeprowadzonych przez wnioskodawcę. Projekt polega na zakupie trzech środków trwałych takich jak: koparka gąsienicowa, młot wibracyjny oraz agregat głofiltrowy w obudowie dźwiękochłonnej wraz z instalacją. Wprowadzona usługa cechować się będzie innowacyjnością w skali światowej. (Polish)
0 references
As a result of the project, an innovative service will be introduced to the company’s offer of deep excavation drainage using the use of advanced technology of assembly and voice and needle filters based on the results of R & D works carried out by the applicant. The project consists of the purchase of three fixed assets, such as: a caterpillar excavator, a vibration hammer and a flat filter unit in a sound-absorbing housing together with the installation. The service introduced will be characterised by innovation on a global scale. (English)
20 October 2020
0 references
Identifiers
RPPK.01.04.01-18-0546/16
0 references