Limiting the introduction of cleanliness to the environment by construction of the sanitary sewage system (III stage) with the reconstruction of the water supply network and modernisation of the water intake of ‘Grabowiec’ in Mielec (Q117133): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): As part of the investment, it is planned to: 1) Construction of a sewerage system in Mielec — III step — 921.00 m of the channel, 34 branches, 1 individual pumping station; 2) Construction of water supply network in Mielec (of a total length of 0.85 km) in the streets: A. Biała (of a length of 0.53 km); Mr DUBOSA (of a length of 0.32 km); 3) Modernisation of the water intake of ‘Grabowiec’ in Mielec: a. construction of water nodes on deep-sea...)
(‎Created claim: summary (P836): As part of the investment, it is planned to: 1) Sewerage construction in Mielnik – stage III – 921.00 m canal, 34 branches, 1 individual pumping plant; 2) Reconstruction of the water supply network in Mielnik (with a total length of 0.85 km) in the streets: a. White (0.53 km long); B. Dubois (0.32 km long); 3) Modernisation of the water intake “Grabowiec” in Mielnik: a. Reconstruction of water nodes in deep-sea wells SW1 on plot No 6852 and SW2...)
Property / summary
 
As part of the investment, it is planned to: 1) Sewerage construction in Mielnik – stage III – 921.00 m canal, 34 branches, 1 individual pumping plant; 2) Reconstruction of the water supply network in Mielnik (with a total length of 0.85 km) in the streets: a. White (0.53 km long); B. Dubois (0.32 km long); 3) Modernisation of the water intake “Grabowiec” in Mielnik: a. Reconstruction of water nodes in deep-sea wells SW1 on plot No 6852 and SW2 on plot No. 6853 in Mielnik and pressing sections for the connecting tee; B. Modernisation of 4 water nodes in Mielnik; C. Purchase of a generator; In addition, expenditure on investor supervision and feasibility studies are foreseen in the project. The implementation of the project will allow the following indicators to be achieved: at product level: — Length of built sanitary sewage system – 0.92 km; — Length of reconstructed water supply – 0,85 km; at the level of the result: — Number of additional persons benefiting from improved waste water treatment – 117 RLM; — Number of additional persons benefiting from improved water supply – 98 people; — Daily capacity of modernised water intakes – 340 m³/day; — Increased employment in supported entities (other than companies) – 0 FTEs; The total cost of the investment will amount to PLN 2 445363.00 (gross), of which eligible expenditure will amount to PLN 1 988 100.00, VAT is not an eligible cost. The grant of 85 % of eligible costs will amount to PLN 1 689 884.99. The remaining amount of eligible costs in the amount of PLN 298215,01 and the total ineligible costs is the own contribution of the Municipality of Mielnik. The project is scheduled to be implemented from July 2017 to August 2018. (English)
Property / summary: As part of the investment, it is planned to: 1) Sewerage construction in Mielnik – stage III – 921.00 m canal, 34 branches, 1 individual pumping plant; 2) Reconstruction of the water supply network in Mielnik (with a total length of 0.85 km) in the streets: a. White (0.53 km long); B. Dubois (0.32 km long); 3) Modernisation of the water intake “Grabowiec” in Mielnik: a. Reconstruction of water nodes in deep-sea wells SW1 on plot No 6852 and SW2 on plot No. 6853 in Mielnik and pressing sections for the connecting tee; B. Modernisation of 4 water nodes in Mielnik; C. Purchase of a generator; In addition, expenditure on investor supervision and feasibility studies are foreseen in the project. The implementation of the project will allow the following indicators to be achieved: at product level: — Length of built sanitary sewage system – 0.92 km; — Length of reconstructed water supply – 0,85 km; at the level of the result: — Number of additional persons benefiting from improved waste water treatment – 117 RLM; — Number of additional persons benefiting from improved water supply – 98 people; — Daily capacity of modernised water intakes – 340 m³/day; — Increased employment in supported entities (other than companies) – 0 FTEs; The total cost of the investment will amount to PLN 2 445363.00 (gross), of which eligible expenditure will amount to PLN 1 988 100.00, VAT is not an eligible cost. The grant of 85 % of eligible costs will amount to PLN 1 689 884.99. The remaining amount of eligible costs in the amount of PLN 298215,01 and the total ineligible costs is the own contribution of the Municipality of Mielnik. The project is scheduled to be implemented from July 2017 to August 2018. (English) / rank
 
Normal rank
Property / summary: As part of the investment, it is planned to: 1) Sewerage construction in Mielnik – stage III – 921.00 m canal, 34 branches, 1 individual pumping plant; 2) Reconstruction of the water supply network in Mielnik (with a total length of 0.85 km) in the streets: a. White (0.53 km long); B. Dubois (0.32 km long); 3) Modernisation of the water intake “Grabowiec” in Mielnik: a. Reconstruction of water nodes in deep-sea wells SW1 on plot No 6852 and SW2 on plot No. 6853 in Mielnik and pressing sections for the connecting tee; B. Modernisation of 4 water nodes in Mielnik; C. Purchase of a generator; In addition, expenditure on investor supervision and feasibility studies are foreseen in the project. The implementation of the project will allow the following indicators to be achieved: at product level: — Length of built sanitary sewage system – 0.92 km; — Length of reconstructed water supply – 0,85 km; at the level of the result: — Number of additional persons benefiting from improved waste water treatment – 117 RLM; — Number of additional persons benefiting from improved water supply – 98 people; — Daily capacity of modernised water intakes – 340 m³/day; — Increased employment in supported entities (other than companies) – 0 FTEs; The total cost of the investment will amount to PLN 2 445363.00 (gross), of which eligible expenditure will amount to PLN 1 988 100.00, VAT is not an eligible cost. The grant of 85 % of eligible costs will amount to PLN 1 689 884.99. The remaining amount of eligible costs in the amount of PLN 298215,01 and the total ineligible costs is the own contribution of the Municipality of Mielnik. The project is scheduled to be implemented from July 2017 to August 2018. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:37, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Limiting the introduction of cleanliness to the environment by construction of the sanitary sewage system (III stage) with the reconstruction of the water supply network and modernisation of the water intake of ‘Grabowiec’ in Mielec
Project in Poland financed by DG Regio

    Statements

    0 references
    1,689,884.99 zloty
    0 references
    405,572.40 Euro
    13 January 2020
    0 references
    1,988,100.0 zloty
    0 references
    477,144.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 August 2017
    0 references
    31 August 2018
    0 references
    GMINA MIELNIK
    0 references
    0 references

    52°19'51.2"N, 23°2'56.0"E
    0 references
    W ramach inwestycji planuje się: 1) Budowę kanalizacji w Mielniku - III etap - 921,00 m kanału, 34 odgałęzienia, 1 przepompownia indywidualna; 2) Przebudowę sieci wodociągowej w Mielniku (o długości łącznej 0,85 km) w ulicach: a. Biała (o długości 0,53 km); b. Duboisa (o długości 0,32 km); 3) Modernizację ujęcia wody „Grabowiec” w Mielniku: a. Przebudowa węzłów wodnych w studniach głębinowych SW1 na działce nr 6852 i SW2 na działce nr 6853 w Mielniku oraz odcinków tłocznych do trójnika połączeniowego; b. Modernizacja 4 węzłów wodnych w Mielniku; c. Zakup agregatu prądotwórczego; Dodatkowo przewidziano w projekcie wydatki na nadzór inwestorski oraz sporządzenie studium wykonalności. Realizacja projektu pozwoli na osiągnięcie następujących wskaźników: a) na poziomie produktu: - Długość wybudowanej kanalizacji sanitarnej - 0,92 km; - Długość przebudowanej sieci wodociągowej – 0,85 km; b) na poziomie rezultatu: – Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków – 117 RLM; – Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę - 98 osób; – Wydajność dobowa zmodernizowanych ujęć wody - 340 m3/dobę; – Wzrost zatrudnienia we wspieranych podmiotach (innych niż przedsiębiorstwa) – 0 EPC; Łączny koszt inwestycji wyniesie 2 445363,00 zł (brutto), z czego wydatki kwalifikowane będą stanowić 1 988 100,00 zł, podatek VAT nie jest kosztem kwalifikowanym. Dotacja w wysokości 85% kosztów kwalifikowalnych będzie stanowić 1 689 884,99 zł. Pozostała kwota kosztów kwalifikowalnych w wysokości 298215,01 zł oraz całość kosztów niekwalifikowalnych stanowi wkład własny Gminy Mielnik. Termin realizacji projektu przewidziano od lipca 2017 do sierpnia 2018. (Polish)
    0 references
    As part of the investment, it is planned to: 1) Sewerage construction in Mielnik – stage III – 921.00 m canal, 34 branches, 1 individual pumping plant; 2) Reconstruction of the water supply network in Mielnik (with a total length of 0.85 km) in the streets: a. White (0.53 km long); B. Dubois (0.32 km long); 3) Modernisation of the water intake “Grabowiec” in Mielnik: a. Reconstruction of water nodes in deep-sea wells SW1 on plot No 6852 and SW2 on plot No. 6853 in Mielnik and pressing sections for the connecting tee; B. Modernisation of 4 water nodes in Mielnik; C. Purchase of a generator; In addition, expenditure on investor supervision and feasibility studies are foreseen in the project. The implementation of the project will allow the following indicators to be achieved: at product level: — Length of built sanitary sewage system – 0.92 km; — Length of reconstructed water supply – 0,85 km; at the level of the result: — Number of additional persons benefiting from improved waste water treatment – 117 RLM; — Number of additional persons benefiting from improved water supply – 98 people; — Daily capacity of modernised water intakes – 340 m³/day; — Increased employment in supported entities (other than companies) – 0 FTEs; The total cost of the investment will amount to PLN 2 445363.00 (gross), of which eligible expenditure will amount to PLN 1 988 100.00, VAT is not an eligible cost. The grant of 85 % of eligible costs will amount to PLN 1 689 884.99. The remaining amount of eligible costs in the amount of PLN 298215,01 and the total ineligible costs is the own contribution of the Municipality of Mielnik. The project is scheduled to be implemented from July 2017 to August 2018. (English)
    20 October 2020
    0 references

    Identifiers

    RPPD.06.02.00-20-0022/17
    0 references