Q114848 (Q114848): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the c...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Construction of pedestrian and cycling infrastructure in Opole district — stage I

Revision as of 15:22, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    6,259,199.59 zloty
    0 references
    1,502,207.90 Euro
    13 January 2020
    0 references
    7,363,764.24 zloty
    0 references
    1,767,303.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    17 May 2016
    0 references
    31 January 2018
    0 references
    POWIAT OPOLSKI
    0 references
    W ramach realizacji projektu powstanie ścieżka rowerowa o szerokości 2,50 - 3,00 m (wzdłuż drogi wojewódzkiej nr 457 z betonu asfaltowego oraz wzdłuż drogi powiatowej nr 1807 O – z kostki betonowej) o łącznej długości: 3,58 km (w tym 2,36 km na terenie gminy Popielów, 1,05 km na terenie gminy Dobrzeń Wielki oraz 0,17 km na terenie gminy Ozimek) oraz dwa parkingi Bike&Ride: w Popielowie na 10 stojaków oraz w Dobrzeniu Wielkim na 20 stojaków. W ramach budowy ścieżek rowerowych powstanie kładka pieszo-rowerowa w miejscowości Krasiejów nad rzeką Mała Panew z murem oporowym i kładka pieszo-rowerowa nad rzeką Brynica. Projekt przewiduje również oświetlenie ścieżki rowerowej za pomocą lamp typu LED na odcinku Popielów - Stare Siołkowice oraz Stare Siołkowice - Chróścice. (Polish)
    0 references
    As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the construction of bicycle paths, there will be a foot and bicycle footbridge in the village of Krasiejów on the Mała Panew river with a resistance wall and a foot and bicycle footbridge over the Brynica River. The project also provides for illumination of the bicycle path using LED lamps on the Popielów – Stare Siołkowice section and Stare Siołkowice – Chróścice section. (English)
    20 October 2020
    0 references

    Identifiers

    RPOP.03.01.02-16-0001/16
    0 references