The development of a publicly available ice cream in the Muszyna through performance for a multi-purpose facility along with the further development of the site. (Q112921): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The straw is located in Muszyna, on parcels 3803, 3341, 3342, 3332, 3333, 3334, 11603 and is used seasonally during the winter period from 15 December to 15 March. demolition works, paving of parts of the area of rock aggregates, insulating works, audience construction and fencing and a small archal. installation of a low decorated ornamental area, installation of lay.2 Construction works: The roof of a refrigerator shall be designed as a stru...)
(‎Created claim: summary (P836): The ice rink is located in Muszyno, on plots no.3803, 3341, 3342, 3332, 3333, 3334, 11603 and is used seasonally during the winter season in the period from December 15 to March 15.The project is to perform the roofing of the ice rink in Muszyna together with the audience, the execution of the ice rink and the freezing canal, as well as the development of the terrain, including skatepark surface and walking path. demolition works, surface harden...)
Property / summary
 
The ice rink is located in Muszyno, on plots no.3803, 3341, 3342, 3332, 3333, 3334, 11603 and is used seasonally during the winter season in the period from December 15 to March 15.The project is to perform the roofing of the ice rink in Muszyna together with the audience, the execution of the ice rink and the freezing canal, as well as the development of the terrain, including skatepark surface and walking path. demolition works, surface hardening of part of the area with stone aggregate, insulating work, building of the auditorium and work on the fence and small arch. installation of pots with low ornamental greenery, installation of benches.2 Construction works: The roofing of the ice rink is designed as a glued wood construction with a tight membrane covering. It consists of 10 frames of glued wood based on reinforced concrete foundations. The posts are articulated to the foundation, and rigid connections are designed in the ridge. It will be covered by a polyester membrane. Parameters: The roofs in the roofing area of 1039,43 m² of total roofs will be: 41,80x25,45 m. Iceland glazing plate 821,25 m² Dimensions of the ice rink so far 20.0 x 40.0 m Max. height of the object from area item 11.75 m Height of the object to the cornice ca. 2.60 m Length of the object 41,80 m Object width 25,45 m Design span of 23.75 m variable angle of roof in the range of 20 35 Installation works include the execution of connections and internal installations: rainwater, water, electrical and land-based sewage systems; the entrances to the facility were designed from the north-west from the existing pedestrian line on plot No. 3803. Access to the facility is provided by an existing road to the dz. 3317, along with the existing exit from Dz. 3803. (English)
Property / summary: The ice rink is located in Muszyno, on plots no.3803, 3341, 3342, 3332, 3333, 3334, 11603 and is used seasonally during the winter season in the period from December 15 to March 15.The project is to perform the roofing of the ice rink in Muszyna together with the audience, the execution of the ice rink and the freezing canal, as well as the development of the terrain, including skatepark surface and walking path. demolition works, surface hardening of part of the area with stone aggregate, insulating work, building of the auditorium and work on the fence and small arch. installation of pots with low ornamental greenery, installation of benches.2 Construction works: The roofing of the ice rink is designed as a glued wood construction with a tight membrane covering. It consists of 10 frames of glued wood based on reinforced concrete foundations. The posts are articulated to the foundation, and rigid connections are designed in the ridge. It will be covered by a polyester membrane. Parameters: The roofs in the roofing area of 1039,43 m² of total roofs will be: 41,80x25,45 m. Iceland glazing plate 821,25 m² Dimensions of the ice rink so far 20.0 x 40.0 m Max. height of the object from area item 11.75 m Height of the object to the cornice ca. 2.60 m Length of the object 41,80 m Object width 25,45 m Design span of 23.75 m variable angle of roof in the range of 20 35 Installation works include the execution of connections and internal installations: rainwater, water, electrical and land-based sewage systems; the entrances to the facility were designed from the north-west from the existing pedestrian line on plot No. 3803. Access to the facility is provided by an existing road to the dz. 3317, along with the existing exit from Dz. 3803. (English) / rank
 
Normal rank
Property / summary: The ice rink is located in Muszyno, on plots no.3803, 3341, 3342, 3332, 3333, 3334, 11603 and is used seasonally during the winter season in the period from December 15 to March 15.The project is to perform the roofing of the ice rink in Muszyna together with the audience, the execution of the ice rink and the freezing canal, as well as the development of the terrain, including skatepark surface and walking path. demolition works, surface hardening of part of the area with stone aggregate, insulating work, building of the auditorium and work on the fence and small arch. installation of pots with low ornamental greenery, installation of benches.2 Construction works: The roofing of the ice rink is designed as a glued wood construction with a tight membrane covering. It consists of 10 frames of glued wood based on reinforced concrete foundations. The posts are articulated to the foundation, and rigid connections are designed in the ridge. It will be covered by a polyester membrane. Parameters: The roofs in the roofing area of 1039,43 m² of total roofs will be: 41,80x25,45 m. Iceland glazing plate 821,25 m² Dimensions of the ice rink so far 20.0 x 40.0 m Max. height of the object from area item 11.75 m Height of the object to the cornice ca. 2.60 m Length of the object 41,80 m Object width 25,45 m Design span of 23.75 m variable angle of roof in the range of 20 35 Installation works include the execution of connections and internal installations: rainwater, water, electrical and land-based sewage systems; the entrances to the facility were designed from the north-west from the existing pedestrian line on plot No. 3803. Access to the facility is provided by an existing road to the dz. 3317, along with the existing exit from Dz. 3803. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:33, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The development of a publicly available ice cream in the Muszyna through performance for a multi-purpose facility along with the further development of the site.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,773,042.82 zloty
    0 references
    425,530.28 Euro
    13 January 2020
    0 references
    2,626,730.18 zloty
    0 references
    630,415.24 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    1 December 2015
    0 references
    1 July 2019
    0 references
    MIASTO I GMINA UZDROWISKOWA MUSZYNA
    0 references
    0 references
    Lodowisko jest zlokalizowane w Muszynie ,na działkach nr 3803, 3341, 3342, 3332, 3333, 3334, 11603 i jest wykorzystywane sezonowo w okresie zimowym orientacyjnie w okresie od 15 grudnia do 15 marca.Przedmiotem projektu jest wykonanie zadaszenia lodowiska w Muszynie wraz z widownią, wykonaniem płyty mrożeniowej lodowiska i kanału mrożeniowego oraz zagospodarowanie terenu, obejmującego wykonanie nawierzchni skateparku i ścieżki spacerowej.Zaplanowane w projekcie działania obejmują:1 Prace budowlane, w tym: prace rozbiórkowe, nawierzchniowe utwardzenie części terenu kruszywem kamiennym, izolacyjne, prace przy budowie widowni oraz prace przy ogrodzeniu i małą arch. montaż donic z niską zielenią ozdobną, montaż ławek.2 Prace konstrukcyjne: Zadaszenie lodowiska projektuje się jako konstrukcję z drewna klejonego z pokryciem z napiętej membrany. Składa się z 10 ram z drewna klejonego opartych na fundamentach żelbetowym. Mocowanie słupów do fundamentu jest przegubowe, a w kalenicy zaprojektowano sztywne połączenia elementów. Pokrycie stanowić będzie membrana tkanina poliestrowa. Parametry: Pow. zadaszenia w obrysie dachu 1039,43 m2 wym. zbiorcze zadaszenia będą wynosić: 41,80x25,45 m. Pow. płyty mrożeniowej lodowiska 821,25m2 Wymiary lodowiska tak jak dotychczas 20,0 x 40,0 m Maks. wys. obiektu od poz. terenu 11,75 m Wys. obiektu do gzymsuokapu ok. 2,60m Dł. obiektu 41,80 m Szer. obiektu 25,45 m Rozpiętość konstrukcyjna osiowa 23,75m kąt nachylenia zadaszenia zmienny w zakresie 20 35 Prace instalacyjne obejmują wykonanie przyłączy i instalacji wewnętrznych: kanalizacji deszczowej, wodociągowej, elektrycznej i oświetlenia terenu; oraz likwidacje i przekładki sieci wodociągowej i kanalizacji deszczowej.Wejścia do obiektu zaprojektowano od strony północnozachodniej z istniejącego ciągu pieszego na działce nr 3803. Dojazd do obiektu zapewnia istniejąca droga na dz. 3317 wraz z istniejącym zjazdem z dz. 3803. (Polish)
    0 references
    The ice rink is located in Muszyno, on plots no.3803, 3341, 3342, 3332, 3333, 3334, 11603 and is used seasonally during the winter season in the period from December 15 to March 15.The project is to perform the roofing of the ice rink in Muszyna together with the audience, the execution of the ice rink and the freezing canal, as well as the development of the terrain, including skatepark surface and walking path. demolition works, surface hardening of part of the area with stone aggregate, insulating work, building of the auditorium and work on the fence and small arch. installation of pots with low ornamental greenery, installation of benches.2 Construction works: The roofing of the ice rink is designed as a glued wood construction with a tight membrane covering. It consists of 10 frames of glued wood based on reinforced concrete foundations. The posts are articulated to the foundation, and rigid connections are designed in the ridge. It will be covered by a polyester membrane. Parameters: The roofs in the roofing area of 1039,43 m² of total roofs will be: 41,80x25,45 m. Iceland glazing plate 821,25 m² Dimensions of the ice rink so far 20.0 x 40.0 m Max. height of the object from area item 11.75 m Height of the object to the cornice ca. 2.60 m Length of the object 41,80 m Object width 25,45 m Design span of 23.75 m variable angle of roof in the range of 20 35 Installation works include the execution of connections and internal installations: rainwater, water, electrical and land-based sewage systems; the entrances to the facility were designed from the north-west from the existing pedestrian line on plot No. 3803. Access to the facility is provided by an existing road to the dz. 3317, along with the existing exit from Dz. 3803. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.06.03.02-12-0516/16
    0 references