Q112786 (Q112786): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the proposal is to convert and change the use of the former chapel building into a public utility building, housing the functions of the cultural centre in Tarnów on plot No. 128 of Tarnów Municipality. This building was erected in 1937. The building can generally be regarded as a three-storey building. It is partially subterranean on the west side and has one floor room directly above the hall on the east side. The scope of the i...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 14:26, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
472,342.92 zloty
0 references
944,676.5 zloty
0 references
50.0 percent
0 references
1 May 2017
0 references
31 January 2019
0 references
GMINA TARNÓW
0 references
Przedmiotem wniosku jest przebudowa oraz zmiana sposobu użytkowania budynku dawnej kaplicy na budynek użyteczności publicznej, mieszczący funkcje domu kultury w Tarnowcu na działce nr 128 gmina Tarnów. Niniejszy budynek został wzniesiony w roku 1937. Opisywany budynek można przyjąć zasadniczo jako trzykondygnacyjny. Jest częściowo podpiwniczony od zachodniej strony oraz posiada jedno pomieszczenie na piętrze bezpośrednio nad holem od strony wschodniej. Zakres inwestycji obejmuje roboty budowlane związane z przebudową istniejącego budynku dawnej kaplicy i nadanie mu nowych funkcji domu kultury wraz z: - wewnętrzną instalacją: wodociągową, kanalizacji sanitarnej, centralnego ogrzewania, gazową i elektryczną, - zewnętrzną instalacją kanalizacji opadowej - miejscami postojowymi, placem zabaw. W wyniku realizacji inwestycji, rozbudowy obiektu powierzchnia użytkowa zwiększy się z 155,74 m2 do 355,75 m2. Stworzy to możliwości lepszego wykorzystania infrastruktury w celu szerzenia kultury. Po zakończeniu inwestycji w budynku funkcjonować będą sale wielofunkcyjne, z których jedna w piwnicy będzie pełnić funkcję sali ćwiczeń (pow. niekwalifikowana), pozostałe jako sale warsztatowe a także biblioteka oraz czytelnia posiadająca bogaty księgozbiór i umożliwiająca użytkownikom na korzystanie z nich zarówno na miejscu jak i zaciszu własnego domu. Utworzenie sali ćwiczeń wraz z szatniami i natryskami stanowi koszt niekwalifikowany. Koszty niekwalifk. zostały wydzielone jako stosunek pow. niekwalifikowanej 42,75 m2 do pow. użyt. 355,75 m2, co daje 12,02%. w związku z powyższym z pozycji: przebudowa, rozbudowa budynku, roboty zew., promocja projektu 12,02% kosztów przeniesiono do niekwalifikowanych (143 202 zł brutto).Koszty wyposażenia sali ujęto w całości w kosztach niekwalifikowanych (9997 zł brutto). Koszty inspektora nadzoru są w całości niekwalifikowane. W budynku wygospodarowane są poniszczenia wspólne: WC, hole, pomieszczenia techniczne, kotłownia. Uzupełnienia w polu Q (Polish)
0 references
The subject of the proposal is to convert and change the use of the former chapel building into a public utility building, housing the functions of the cultural centre in Tarnów on plot No. 128 of Tarnów Municipality. This building was erected in 1937. The building can generally be regarded as a three-storey building. It is partially subterranean on the west side and has one floor room directly above the hall on the east side. The scope of the investment includes construction works related to the reconstruction of the existing building of the former chapel and giving it new functions of the cultural centre together with: — internal installation: water supply, sanitary sewerage, central heating, gas and electricity, – external plumbing system – parking places, playground. As a result of the investment, expansion of the facility will increase from 155.74 m² to 355.75 m². This will create opportunities for better use of infrastructure to promote culture. After completion of the investment in the building, multifunctional rooms, one of which in the basement will serve as an exercise room (ineligible), the remaining as workshop rooms, as well as a library and a reading room with a rich collection of books and allowing users to use them both on the spot and the comfort of their own home. The creation of an exercise room with dressing rooms and showers is an ineligible cost. Non-equivalent costs have been allocated as a ratio of the ineligible area of 42,75 m² to the area of use. 355,75 m², which gives 12,02 % of the following items: reconstruction, extension of the building, construction works, promotion of the project 12.02 % of the costs were transferred to the ineligible costs (PLN 143 202 gross).The costs of equipment of the hall were fully included in ineligible costs (PLN 9997 gross). The costs of the Supervisory Inspector shall be wholly ineligible. In the building there are common humiliations: Toilet, holes, technical rooms, boiler room. Refills in box Q (English)
20 October 2020
0 references
Identifiers
RPMP.06.01.03-12-0348/16
0 references