(‎Removed claim: summary (P836): The project is planned to be 1. The design and construction of the upgrade of a wastewater treatment plant which includes: The construction of a container station from the aerator of an automatic staircase to the drainage system and the pan Montage of the sand separator with the injection system of the catator system into the DAF aeration system of the DAF aeration system of the DAF system, the construction of a second biological block that is...)
(‎Created claim: summary (P836): The project is planned to:1. Design and implementation of modernisation of the sewage treatment plant, which includes: Construction of a container water catchment station with aeration tank Installation of automatic staircase with drainage system and feeder Installation of a sand separator with feeder Equipment Flotator equipment in DAF aeration system Construction of a second biological block identical to the existing block Construction of nece...)
Property / summary
 
The project is planned to:1. Design and implementation of modernisation of the sewage treatment plant, which includes: Construction of a container water catchment station with aeration tank Installation of automatic staircase with drainage system and feeder Installation of a sand separator with feeder Equipment Flotator equipment in DAF aeration system Construction of a second biological block identical to the existing block Construction of necessary technological installations Installation of additional equipment and control systems Change in land use Renovation and modernisation of a technological building2. Design and construction of a 300 m³ clean water tank at a water treatment station together with associated facilities: with the pumping chamber for filling the tank3. Replacement of the water supply network in ul. It is planned to replace the water supply network in ul. A merry 0.374 km long along with connections with a total length of 0.178 km. The total length of the reconstructed water supply is 0.552 km. (English)
Property / summary: The project is planned to:1. Design and implementation of modernisation of the sewage treatment plant, which includes: Construction of a container water catchment station with aeration tank Installation of automatic staircase with drainage system and feeder Installation of a sand separator with feeder Equipment Flotator equipment in DAF aeration system Construction of a second biological block identical to the existing block Construction of necessary technological installations Installation of additional equipment and control systems Change in land use Renovation and modernisation of a technological building2. Design and construction of a 300 m³ clean water tank at a water treatment station together with associated facilities: with the pumping chamber for filling the tank3. Replacement of the water supply network in ul. It is planned to replace the water supply network in ul. A merry 0.374 km long along with connections with a total length of 0.178 km. The total length of the reconstructed water supply is 0.552 km. (English) / rank
 
Normal rank
Property / summary: The project is planned to:1. Design and implementation of modernisation of the sewage treatment plant, which includes: Construction of a container water catchment station with aeration tank Installation of automatic staircase with drainage system and feeder Installation of a sand separator with feeder Equipment Flotator equipment in DAF aeration system Construction of a second biological block identical to the existing block Construction of necessary technological installations Installation of additional equipment and control systems Change in land use Renovation and modernisation of a technological building2. Design and construction of a 300 m³ clean water tank at a water treatment station together with associated facilities: with the pumping chamber for filling the tank3. Replacement of the water supply network in ul. It is planned to replace the water supply network in ul. A merry 0.374 km long along with connections with a total length of 0.178 km. The total length of the reconstructed water supply is 0.552 km. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:41, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Water and wastewater management in Nowy Brzesko”
Project in Poland financed by DG Regio

    Statements

    0 references
    3,439,740.58 zloty
    0 references
    825,537.74 Euro
    13 January 2020
    0 references
    4,666,586.06 zloty
    0 references
    1,119,980.65 Euro
    13 January 2020
    0 references
    73.71 percent
    0 references
    2 July 2020
    0 references
    21 March 2022
    0 references
    GMINA NOWE BRZESKO
    0 references
    W ramach Projektu planuje się:1. Zaprojektowanie i wykonanie modernizacji oczyszczalni ścieków, w zakres której wchodzi: Budowę kontenerowej stacji zlewnej z napowietrzanym zbiornikiem Montaż automatycznej kraty schodkowej z systemem odwadniania i podajnikiem Montaż separatora piasku z podajnikiem Wyposażenie flotatora w system napowietrzania DAF Budowa drugiego bloku biologicznego identycznego jak blok istniejący Budowa koniecznych instalacji technologicznych Montaż dodatkowych urządzeń i układów sterowania Zmiana zagospodarowania terenu Wykonanie remontu i modernizacji budynku technologicznosocjalnego2. Zaprojektowanie i budowę zbiornika wody czystej o pojemności 300 m3 na stacji uzdatniania wody wraz z obiektami towarzyszącymi: komorą zasuw pompownią do napełniania zbiornika3. Wymianę sieci wodociągowej w ul. Wesołej.Planuje się wymianę sieci wodociągowej w ul. Wesołej na długości 0,374 km wraz z przyłączami o łącznej długości 0,178 km. Łączna długość przebudowywanego wodociągu wynosi 0,552 km. (Polish)
    0 references
    The project is planned to:1. Design and implementation of modernisation of the sewage treatment plant, which includes: Construction of a container water catchment station with aeration tank Installation of automatic staircase with drainage system and feeder Installation of a sand separator with feeder Equipment Flotator equipment in DAF aeration system Construction of a second biological block identical to the existing block Construction of necessary technological installations Installation of additional equipment and control systems Change in land use Renovation and modernisation of a technological building2. Design and construction of a 300 m³ clean water tank at a water treatment station together with associated facilities: with the pumping chamber for filling the tank3. Replacement of the water supply network in ul. It is planned to replace the water supply network in ul. A merry 0.374 km long along with connections with a total length of 0.178 km. The total length of the reconstructed water supply is 0.552 km. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.05.03.02-12-1017/17
    0 references