Activation of parts of downtown areas by revitalising Krakowska Street and adjacent areas in Opole – stage II_2 (Q115717): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q115717 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q115717 w Polsce |
Revision as of 15:08, 29 October 2020
Project Q115717 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Activation of parts of downtown areas by revitalising Krakowska Street and adjacent areas in Opole – stage II_2 |
Project Q115717 in Poland |
Statements
11,281,247.67 zloty
0 references
14,071,867.89 zloty
0 references
80.17 percent
0 references
5 April 2017
0 references
30 November 2019
0 references
MIASTO OPOLE
0 references
Przedmiotem projektu jest aktywizacja części obszarów śródmieścia poprzez rewitalizację ulicy Krakowskiej i obszarów przyległych w Opolu – etap II poprzez realizację zakresu rzeczowego projektu, który obejmuje rewitalizację wnętrza kwartału między ul. Krakowską – ul. Żwirki i Wigury – ul. Powolnego w Opolu. Projekt polegać będzie na: • przebudowie budynku przy ul. Krakowskiej 32 i stworzenie w nim Centrum Aktywności Społecznej • nowym zagospodarowaniu wnętrza kwartału pomiędzy ulicami Krakowską, Żwirki i Wigury oraz Powolnego (nowy układ i nawierzchnia ciągów pieszych, pieszo – jezdnych i dojazdów do budynków oraz placów zabaw, realizacja zespołów podziemnych zbiorników na odpady, montaż elementów zagospodarowania i małej architektury, rewitalizacja istniejącej i uzupełnienie zieleni ozdobnej, nowe oświetlenie wraz z siecią energetyczną, podłączenie odwodnienia nawierzchni do sieci infrastruktury technicznej). Realizacji planowanych inwestycji towarzyszyć będą działania o charakterze społecznym – zaplanowano przeprowadzenie kampanii świadomościowej. Inwestycja znalazła się na liście projektów podstawowych „Lokalnego Programu Rewitalizacji Opola do 2023 roku” przyjętego Uchwałą nr XXXIV/664/16 Rady Miasta Opole z dnia 24 listopada 2016r. Powstałe w wyniku inwestycji produkty: Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami szt. 1,00; Liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami szt. 1,00; Liczba wspartych obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach szt. 1,00; Powierzchnia obszarów objętych rewitalizacją ha 0,87; Ludność mieszkająca na obszarach objętych zintegrowanymi strategiami rozwoju obszarów miejskich osoby 22000,00; Otwarta przestrzeń utworzona lub rekultywowana na obszarach miejskich m2 4945,00; Liczba przebudowanych/rozbudowanych/zaadaptowanych obiektów infrastrukturalnych przeznaczonych na tworzenie mieszkań chronionych lub wspomaganych szt. 1,00 (Polish)
0 references
The subject of the project is to activate part of the areas of downtown by revitalising Krakowska Street and adjacent areas in Opole – stage II through the implementation of the material scope of the project, which includes revitalisation of the quarter interior between ul. Krakowska – ul. Gravel and Wigury – ul. Slow down in Opole. The project will consist of: • redevelopment of the building at ul. Krakowska 32 and the creation of the Centre for Social Activity • new development of the quarter interior between Krakowska, Żwirki and Wigury streets and Slow (new layout and pavement of pedestrians, walking – roadways and access to buildings and playgrounds, implementation of underground waste reservoirs, installation of technical elements and small architecture, revitalisation of the existing and complementing ornamental greenery, new lighting with power grid, connection of drainage infrastructure). The implementation of the planned investments will be accompanied by actions of a social nature – an awareness campaign is planned. The investment was included in the list of basic projects “Local Programme of Regeneration of Opole until 2023” adopted by Resolution No XXXIV/664/16 of the City Council of Opole of 24 November 2016. Products resulting from the investment: Number of facilities adapted to the needs of people with disabilities. 1,00; Number of projects which financed the costs of rational improvements for people with disabilities. 1,00; Number of supported infrastructure facilities located in revitalised areas of pcs. 1,00; The area of the revitalisation areas ha 0,87; Population living in areas covered by integrated urban development strategies 22000,00; Open space created or rehabilitated in urban areas of m² 4945,00; Number of reconstructed/developed/adapted infrastructure facilities designed for the creation of protected or assisted flats. 1,00 (English)
20 October 2020
0 references
Identifiers
RPOP.10.02.00-16-0014/17
0 references