Establishment of facilities — the transport centre for public transport at the slaughterhouse by upgrading the service infrastructure for passengers (Q113038): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aim of the project is to rebuild the heritage, which is in ruins, in the case of a railway service in a butcher and a site adjacent to the communication centre of the public transport operation, which are not covered by the works, and will not concern the maintenance of the infrastructure. This will provide the possibility to service travellers, including transfers of personal communications, to a means of collective communication. The sit...)
(‎Created claim: summary (P836): The project consists of the reconstruction of the historic railway station in Brzeźnica, which is in ruins and the development of areas adjacent to the public transport centre, the activities covered by the project do not concern repair works, nor will they concern the maintenance of this infrastructure. This will create the possibility of handling travellers, including switching from individual to public transport. The facilities created as par...)
Property / summary
 
The project consists of the reconstruction of the historic railway station in Brzeźnica, which is in ruins and the development of areas adjacent to the public transport centre, the activities covered by the project do not concern repair works, nor will they concern the maintenance of this infrastructure. This will create the possibility of handling travellers, including switching from individual to public transport. The facilities created as part of the project will be adapted to the needs of people with disabilities and will meet the guidelines included in the system of the Małopolska Agglomeration Card MKA. Material scope of investments:1. Reconstruction of the railway station building in the scope of: construction works for masonry, horizontal insulation of walls of crystal pressure injection, chimneys, reinforced concrete stairs from ground to floor, plaster works, replacement of roof structures and roof coverings, ceilings above the ground floor, above the floor, carpenter and locksmith, floors and wall coverings, painting works, facades, installations: C.O., water.can., electrical teletechnics, equipment2. The development of the area around the station consists of, among others: construction of new parking spaces paved with paving stones ParkRide, construction of pavements, partial reconstruction of the road providing access to the station, integration of bus transport facilities in the station area appropriate location and installation of a new stop shelter, driveways and facilities for disabled people, bicycle shelters, monitoring system, lighting, small architecture, development of green areas. In the interchange centre there will be a place for bicycles, light boards, as well as at least one ticket machine. There will be a parking lot for bicycles and spaces for traffic control and monitoring installations.In addition, the following tasks will be carried out: equipment of the PKP station including a system of passenger information multimedia boards, investor supervision and promotion. (English)
Property / summary: The project consists of the reconstruction of the historic railway station in Brzeźnica, which is in ruins and the development of areas adjacent to the public transport centre, the activities covered by the project do not concern repair works, nor will they concern the maintenance of this infrastructure. This will create the possibility of handling travellers, including switching from individual to public transport. The facilities created as part of the project will be adapted to the needs of people with disabilities and will meet the guidelines included in the system of the Małopolska Agglomeration Card MKA. Material scope of investments:1. Reconstruction of the railway station building in the scope of: construction works for masonry, horizontal insulation of walls of crystal pressure injection, chimneys, reinforced concrete stairs from ground to floor, plaster works, replacement of roof structures and roof coverings, ceilings above the ground floor, above the floor, carpenter and locksmith, floors and wall coverings, painting works, facades, installations: C.O., water.can., electrical teletechnics, equipment2. The development of the area around the station consists of, among others: construction of new parking spaces paved with paving stones ParkRide, construction of pavements, partial reconstruction of the road providing access to the station, integration of bus transport facilities in the station area appropriate location and installation of a new stop shelter, driveways and facilities for disabled people, bicycle shelters, monitoring system, lighting, small architecture, development of green areas. In the interchange centre there will be a place for bicycles, light boards, as well as at least one ticket machine. There will be a parking lot for bicycles and spaces for traffic control and monitoring installations.In addition, the following tasks will be carried out: equipment of the PKP station including a system of passenger information multimedia boards, investor supervision and promotion. (English) / rank
 
Normal rank
Property / summary: The project consists of the reconstruction of the historic railway station in Brzeźnica, which is in ruins and the development of areas adjacent to the public transport centre, the activities covered by the project do not concern repair works, nor will they concern the maintenance of this infrastructure. This will create the possibility of handling travellers, including switching from individual to public transport. The facilities created as part of the project will be adapted to the needs of people with disabilities and will meet the guidelines included in the system of the Małopolska Agglomeration Card MKA. Material scope of investments:1. Reconstruction of the railway station building in the scope of: construction works for masonry, horizontal insulation of walls of crystal pressure injection, chimneys, reinforced concrete stairs from ground to floor, plaster works, replacement of roof structures and roof coverings, ceilings above the ground floor, above the floor, carpenter and locksmith, floors and wall coverings, painting works, facades, installations: C.O., water.can., electrical teletechnics, equipment2. The development of the area around the station consists of, among others: construction of new parking spaces paved with paving stones ParkRide, construction of pavements, partial reconstruction of the road providing access to the station, integration of bus transport facilities in the station area appropriate location and installation of a new stop shelter, driveways and facilities for disabled people, bicycle shelters, monitoring system, lighting, small architecture, development of green areas. In the interchange centre there will be a place for bicycles, light boards, as well as at least one ticket machine. There will be a parking lot for bicycles and spaces for traffic control and monitoring installations.In addition, the following tasks will be carried out: equipment of the PKP station including a system of passenger information multimedia boards, investor supervision and promotion. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:00, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Establishment of facilities — the transport centre for public transport at the slaughterhouse by upgrading the service infrastructure for passengers
Project in Poland financed by DG Regio

    Statements

    0 references
    2,251,979.66 zloty
    0 references
    540,475.12 Euro
    13 January 2020
    0 references
    2,649,387.97 zloty
    0 references
    635,853.11 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2018
    0 references
    31 December 2018
    0 references
    GMINA BRZEŹNICA
    0 references
    0 references
    Projekt polega na przebudowie zabytkowego, będącego w ruinie, Dworca kolejowego w Brzeźnicy i zagospodarowaniu terenów do niego przylegających na centrum transportu komunikacji zbiorowej działania objęte projektem nie dotyczą prac remontowych, jak również nie będą dotyczyły utrzymania tej infrastruktury. Stworzy to możliwość obsługi podróżnych, w tym przesiadki z komunikacji indywidualnej na środek komunikacji zbiorowej. Obiekty powstałe w ramach projektu zostaną przystosowane do potrzeb osób niepełnosprawnych oraz spełnią wytyczne ujęte w systemie Małopolska Karta Aglomeracyjna MKA. Zakres rzeczowy inwestycji:1. Przebudowa budynku dworca kolejowego w zakresie wykonania: robót budowlanych roboty murowe, izolacja pozioma ścian iniekcji krystalicznej ciśnieniowej, kominy, schody żelbetowe z parteru na piętro, roboty tynkarskie, wymiana konstrukcji i pokrycia dachu, stropy nad parterem, nad piętrem, stolarka i ślusarka budowlana, posadzki i okładziny ścian, roboty malarskie, elewacja, instalacje: c.o., wod.kan., elektrycznej teletechniczne, wyposażenie2. Zagospodarowanie terenu wokół dworca polegające m.in. na: wykonaniu nowych miejsc postojowych parkingów utwardzonych kostką brukową ParkRide, wykonanie chodników, częściowe przebudowanie drogi zapewniającej dojazd do dworca, wkomponowanie zaplecza komunikacji autobusowej w teren dworca odpowiednia lokalizacja i montaż nowej wiaty przystankowej, podjazdy i udogodnienia dla osób niepełnosprawnych, wiaty rowerowe, system monitoringu, oświetlenie, mała architektura, zagospodarowanie terenów zielonych. W centrum przesiadkowym znajdzie się miejsce m.in. na rowery, tablicę świetlną, a także na co najmniej jeden biletomat. Przygotowany zostanie parking dla rowerów i miejsca na instalacje sterujące ruchem drogowym i monitoringiem.Ponadto realizowane będą zadania z zakresu: wyposażenia dworca PKP w tym system informacji pasażerskiej tablice multimedialne, nadzoru inwestorskiego i promocji. (Polish)
    0 references
    The project consists of the reconstruction of the historic railway station in Brzeźnica, which is in ruins and the development of areas adjacent to the public transport centre, the activities covered by the project do not concern repair works, nor will they concern the maintenance of this infrastructure. This will create the possibility of handling travellers, including switching from individual to public transport. The facilities created as part of the project will be adapted to the needs of people with disabilities and will meet the guidelines included in the system of the Małopolska Agglomeration Card MKA. Material scope of investments:1. Reconstruction of the railway station building in the scope of: construction works for masonry, horizontal insulation of walls of crystal pressure injection, chimneys, reinforced concrete stairs from ground to floor, plaster works, replacement of roof structures and roof coverings, ceilings above the ground floor, above the floor, carpenter and locksmith, floors and wall coverings, painting works, facades, installations: C.O., water.can., electrical teletechnics, equipment2. The development of the area around the station consists of, among others: construction of new parking spaces paved with paving stones ParkRide, construction of pavements, partial reconstruction of the road providing access to the station, integration of bus transport facilities in the station area appropriate location and installation of a new stop shelter, driveways and facilities for disabled people, bicycle shelters, monitoring system, lighting, small architecture, development of green areas. In the interchange centre there will be a place for bicycles, light boards, as well as at least one ticket machine. There will be a parking lot for bicycles and spaces for traffic control and monitoring installations.In addition, the following tasks will be carried out: equipment of the PKP station including a system of passenger information multimedia boards, investor supervision and promotion. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.07.02.04-12-0345/17
    0 references