Active kindergartens in Gmina Stapsk (Q110831): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): A project is planned to be implemented in the PO at SP in Stupsk, Morales and Ecclesiastical Affairs, in okr. 01.09.2018-30.09.2019 (costab.no.1), org. propos. is the municipality of Stupsk. The period of operation of each centre of the PLO since 01.09.2016 (unsuccessful. (2)).In the context of the problem, there is a lack of awareness of the problem. (in the year SZK. 2016/2017 Pre-glass covers only 40 children — K 19, M21) from diagnosis of...)
(‎Created claim: summary (P836): It is planned to implement the project in the OP at the SP in Stupsk, Moravia and Wyszyna Kościelnych, in around. 01.09.2018-30.09.2019 (f.kryt.dostnr1), org. prow. is Stupsk Municipality. Functional period of each PLO centre from 01.09.2016r. (f.kryt.dost.nr2).In the building, the problem is unaware. the inn. about a third. pre-glass, problems of the finan. families, therefore the majority. dz. does not attend the front. (in a year of glass. On...)
Property / summary
 
It is planned to implement the project in the OP at the SP in Stupsk, Moravia and Wyszyna Kościelnych, in around. 01.09.2018-30.09.2019 (f.kryt.dostnr1), org. prow. is Stupsk Municipality. Functional period of each PLO centre from 01.09.2016r. (f.kryt.dost.nr2).In the building, the problem is unaware. the inn. about a third. pre-glass, problems of the finan. families, therefore the majority. dz. does not attend the front. (in a year of glass. Only 40 children – K 19, M21) On the diagnosis of need, for a meeting with a parent in 09.2017 of the pre-categorised children in 3. OWP, (in full. Kryt.dost.No. 3), results that most of them zaint. is participating in the project and has high hopes with it in a possible return to work, which is particularly important for the K having taken care of at home, and taking up work was not possible. Proj. the referral is to gr. doc. z Ter. woj. maz. (full. Kryt. form no. 13). Support covered by 88 children (39K,49M) aged 2.5-5 years with Stupsk, i.e. at the age of 2.5-3 years -25(15K,10M), 4years-34(15K,19M), 5years 29dz.(9K,20M), who do not participate in pre-school education. (particular description of the target groups. C3.1.). It is planned to create new places in the OP in Stupsk (24-10K/14M), Moravia (44-19K/25M), Wysz. It’s the bones. (20-10K/10M), for children 2.5-5 l and support all children in the correct clash in fact, by covering them. doc. in terms of early development, in order to detect development deficits as soon as possible. For 88 dz. sure. food day. 5 days in week x 40 weeks.x13.00PLN, in the year‘18-7040, and in’19-10560 pc. Purchase. equipment. rooms, teaching aids, facilities for the organisation of playgrounds for 3 GTC, (description of zad. nr.1). Schedule. take additional classes in 3OWP i.e.: develop competence. emotion and social, gymnasium correction, dance and o char. therapist.(description zad. nrr2) and attendees. 4 n-li (2K from the OWP Stupsku, 2K from OWP Wyszyn.Chości.) within the frame of the quarter in training courses in the field of motor classes: instr. sport, dance sport., instr. rhythmics (description of the assortment no. 3). (English)
Property / summary: It is planned to implement the project in the OP at the SP in Stupsk, Moravia and Wyszyna Kościelnych, in around. 01.09.2018-30.09.2019 (f.kryt.dostnr1), org. prow. is Stupsk Municipality. Functional period of each PLO centre from 01.09.2016r. (f.kryt.dost.nr2).In the building, the problem is unaware. the inn. about a third. pre-glass, problems of the finan. families, therefore the majority. dz. does not attend the front. (in a year of glass. Only 40 children – K 19, M21) On the diagnosis of need, for a meeting with a parent in 09.2017 of the pre-categorised children in 3. OWP, (in full. Kryt.dost.No. 3), results that most of them zaint. is participating in the project and has high hopes with it in a possible return to work, which is particularly important for the K having taken care of at home, and taking up work was not possible. Proj. the referral is to gr. doc. z Ter. woj. maz. (full. Kryt. form no. 13). Support covered by 88 children (39K,49M) aged 2.5-5 years with Stupsk, i.e. at the age of 2.5-3 years -25(15K,10M), 4years-34(15K,19M), 5years 29dz.(9K,20M), who do not participate in pre-school education. (particular description of the target groups. C3.1.). It is planned to create new places in the OP in Stupsk (24-10K/14M), Moravia (44-19K/25M), Wysz. It’s the bones. (20-10K/10M), for children 2.5-5 l and support all children in the correct clash in fact, by covering them. doc. in terms of early development, in order to detect development deficits as soon as possible. For 88 dz. sure. food day. 5 days in week x 40 weeks.x13.00PLN, in the year‘18-7040, and in’19-10560 pc. Purchase. equipment. rooms, teaching aids, facilities for the organisation of playgrounds for 3 GTC, (description of zad. nr.1). Schedule. take additional classes in 3OWP i.e.: develop competence. emotion and social, gymnasium correction, dance and o char. therapist.(description zad. nrr2) and attendees. 4 n-li (2K from the OWP Stupsku, 2K from OWP Wyszyn.Chości.) within the frame of the quarter in training courses in the field of motor classes: instr. sport, dance sport., instr. rhythmics (description of the assortment no. 3). (English) / rank
 
Normal rank
Property / summary: It is planned to implement the project in the OP at the SP in Stupsk, Moravia and Wyszyna Kościelnych, in around. 01.09.2018-30.09.2019 (f.kryt.dostnr1), org. prow. is Stupsk Municipality. Functional period of each PLO centre from 01.09.2016r. (f.kryt.dost.nr2).In the building, the problem is unaware. the inn. about a third. pre-glass, problems of the finan. families, therefore the majority. dz. does not attend the front. (in a year of glass. Only 40 children – K 19, M21) On the diagnosis of need, for a meeting with a parent in 09.2017 of the pre-categorised children in 3. OWP, (in full. Kryt.dost.No. 3), results that most of them zaint. is participating in the project and has high hopes with it in a possible return to work, which is particularly important for the K having taken care of at home, and taking up work was not possible. Proj. the referral is to gr. doc. z Ter. woj. maz. (full. Kryt. form no. 13). Support covered by 88 children (39K,49M) aged 2.5-5 years with Stupsk, i.e. at the age of 2.5-3 years -25(15K,10M), 4years-34(15K,19M), 5years 29dz.(9K,20M), who do not participate in pre-school education. (particular description of the target groups. C3.1.). It is planned to create new places in the OP in Stupsk (24-10K/14M), Moravia (44-19K/25M), Wysz. It’s the bones. (20-10K/10M), for children 2.5-5 l and support all children in the correct clash in fact, by covering them. doc. in terms of early development, in order to detect development deficits as soon as possible. For 88 dz. sure. food day. 5 days in week x 40 weeks.x13.00PLN, in the year‘18-7040, and in’19-10560 pc. Purchase. equipment. rooms, teaching aids, facilities for the organisation of playgrounds for 3 GTC, (description of zad. nr.1). Schedule. take additional classes in 3OWP i.e.: develop competence. emotion and social, gymnasium correction, dance and o char. therapist.(description zad. nrr2) and attendees. 4 n-li (2K from the OWP Stupsku, 2K from OWP Wyszyn.Chości.) within the frame of the quarter in training courses in the field of motor classes: instr. sport, dance sport., instr. rhythmics (description of the assortment no. 3). (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:30, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Active kindergartens in Gmina Stapsk
Project in Poland financed by DG Regio

    Statements

    0 references
    910,210.0 zloty
    0 references
    218,450.4 Euro
    13 January 2020
    0 references
    1,138,380.0 zloty
    0 references
    273,211.2 Euro
    13 January 2020
    0 references
    79.96 percent
    0 references
    3 September 2018
    0 references
    30 September 2019
    0 references
    GMINA STUPSK
    0 references
    0 references
    0 references
    Planuje się realiz. projektu w OP przy SP w Stupsku,Morawach i Wyszynach Kościelnych, w okr. 01.09.2018-30.09.2019 (spełn.kryt.dostnr1), org. prow. jest Gmina Stupsk. Okres funkcjon. każdego ośrodka OWP od 01.09.2016r. (spełn.kryt.dost.nr2).W gm. podst. problem jest brak świadom. mieszk. o potrz. wych. przedszk., problemy finan. rodzin, dlatego większ. dz. nie uczęszcza do przedsz. (w roku szk. 2016/2017 wych. przedszk. objęto zaledwie 40 dzieci –K 19, M21 ) Z diagnoz dot. zapotrzeb., przepr. na spotk. z rodzic. w 09.2017 r. dzieci przedszk. w 3 ww. OWP, (spełn.kryt.dost.nr 3),wynika, że większość z nich zaint. jest uczest. w proj. i wiąże z nim duże nadzieje w możliw. powrotu do pracy, co jest szczeg. ważne dla K mających w domu pod opieką dz., i podjęcie pracy nie było możliwe. Proj. skier. jest do gr. doc. z ter. woj. maz.(spełn.kryt. form. nr 13). Wsparciem zost. objętych 88 dzieci (39K,49M) w wieku 2,5-5 lat z gm. Stupsk, tj. w wieku 2,5-3lat -25dz.(15K,10M), 4lat-34dz.(15K,19M), 5lat 29dz.(9K,20M), które dotych. nie uczestn.w edukacji przedszk. (szczeg. opis Grup docel. C3.1.). Planuje się utworz. nowych miejsc wych. przedszk.w OP w Stupsku (24 - 10K / 14M), Morawach (44-19K / 25M),Wysz. Kości. (20-10K/10M),dla dzieci 2,5-5 l oraz wsparcie wszyst. dzieci w prawid. starcie w rzeczywist szk.,przez objęcie ich zaj. dod. w zakresie wczesn. wspom. rozwoju, w celu jak najszybsz. wykrycia deficytów rozwoju. Dla 88 dz. zapewn. zost. wyżyw. dzien. 5 dni w tyg.x 40 tyg.x13,00PLN,w r.'18-7040, a w '19-10560 szt.dz.wyż. Zakup. zost. wyposaż. sal, pomoce dydakt., urządzenia do organiz. placów zabaw dla 3 OWP,(szczeg.opis zad.nr1). Plan. się zajęcia dodatk. w 3OWP tj.: zaj. rozwij. kompet. emocjon. i społeczne, gimn. korekc., zaj. taneczne i o char. terapeut.(szczeg.opis zad.nr2) oraz uczestn. 4 n-li (2K z OWP Stupsku, 2K z OWP Wyszyn.Kości.) w ramach podn. kwal. zaw. w kursach w zakresie zajęć ruchowych: instr. sportu, taniec sport., instr. rytmiki (szczeg.opis zad. nr 3). (Polish)
    0 references
    It is planned to implement the project in the OP at the SP in Stupsk, Moravia and Wyszyna Kościelnych, in around. 01.09.2018-30.09.2019 (f.kryt.dostnr1), org. prow. is Stupsk Municipality. Functional period of each PLO centre from 01.09.2016r. (f.kryt.dost.nr2).In the building, the problem is unaware. the inn. about a third. pre-glass, problems of the finan. families, therefore the majority. dz. does not attend the front. (in a year of glass. Only 40 children – K 19, M21) On the diagnosis of need, for a meeting with a parent in 09.2017 of the pre-categorised children in 3. OWP, (in full. Kryt.dost.No. 3), results that most of them zaint. is participating in the project and has high hopes with it in a possible return to work, which is particularly important for the K having taken care of at home, and taking up work was not possible. Proj. the referral is to gr. doc. z Ter. woj. maz. (full. Kryt. form no. 13). Support covered by 88 children (39K,49M) aged 2.5-5 years with Stupsk, i.e. at the age of 2.5-3 years -25(15K,10M), 4years-34(15K,19M), 5years 29dz.(9K,20M), who do not participate in pre-school education. (particular description of the target groups. C3.1.). It is planned to create new places in the OP in Stupsk (24-10K/14M), Moravia (44-19K/25M), Wysz. It’s the bones. (20-10K/10M), for children 2.5-5 l and support all children in the correct clash in fact, by covering them. doc. in terms of early development, in order to detect development deficits as soon as possible. For 88 dz. sure. food day. 5 days in week x 40 weeks.x13.00PLN, in the year‘18-7040, and in’19-10560 pc. Purchase. equipment. rooms, teaching aids, facilities for the organisation of playgrounds for 3 GTC, (description of zad. nr.1). Schedule. take additional classes in 3OWP i.e.: develop competence. emotion and social, gymnasium correction, dance and o char. therapist.(description zad. nrr2) and attendees. 4 n-li (2K from the OWP Stupsku, 2K from OWP Wyszyn.Chości.) within the frame of the quarter in training courses in the field of motor classes: instr. sport, dance sport., instr. rhythmics (description of the assortment no. 3). (English)
    20 October 2020
    0 references

    Identifiers

    RPMA.10.01.04-14-A601/18
    0 references