Replacement of heating equipment from local heat sources together with the thermal modernisation of buildings and the installation of RES in order to reduce the “low emission” in the municipality of Violzewo. (Q109136): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Project pn: The replacement of heating equipment from local heat sources together with the thermal modernisation of buildings and the installation of RES in order to reduce the ‘low emission’ in the municipality of the ‘low emission’ in the municipality of the ‘low emission’ will be carried out in the village of the village of Violzewo, in pow.skobsko. scope of the project takes account of the replacement of the heating equipment at the buildi...)
(‎Created claim: summary (P836): Project Bn: Replacement of heating equipment in the framework of local heat sources together with thermal modernisation of buildings and installation of RES in order to reduce “low emissions” in Naruszewo commune will be carried out in the rural commune Naruszewo, in Płoń.The material scope of the project includes the replacement of heating equipment in the building of the Podst. School in Krysk and in the auxiliary building of the Podst. School...)
Property / summary
 
Project Bn: Replacement of heating equipment in the framework of local heat sources together with thermal modernisation of buildings and installation of RES in order to reduce “low emissions” in Naruszewo commune will be carried out in the rural commune Naruszewo, in Płoń.The material scope of the project includes the replacement of heating equipment in the building of the Podst. School in Krysk and in the auxiliary building of the Podst. School in Krysk. 2 % of the heating factor is the reduction of the heating medium in the heating medium (main heat pump) and for the building of the Auxiliary School of Podst. in Krysk there will be a replacement of the heating device:from the coal boiler to the heating agent supplied with the RES (main heat pump), therefore there is a need to carry out the heat factor in the two buildings of the school’s heating work. The beneficiary has PGN, energy audits and design energy characteristics.The target group of the project concerns people who will use the infrastructure directly. (English)
Property / summary: Project Bn: Replacement of heating equipment in the framework of local heat sources together with thermal modernisation of buildings and installation of RES in order to reduce “low emissions” in Naruszewo commune will be carried out in the rural commune Naruszewo, in Płoń.The material scope of the project includes the replacement of heating equipment in the building of the Podst. School in Krysk and in the auxiliary building of the Podst. School in Krysk. 2 % of the heating factor is the reduction of the heating medium in the heating medium (main heat pump) and for the building of the Auxiliary School of Podst. in Krysk there will be a replacement of the heating device:from the coal boiler to the heating agent supplied with the RES (main heat pump), therefore there is a need to carry out the heat factor in the two buildings of the school’s heating work. The beneficiary has PGN, energy audits and design energy characteristics.The target group of the project concerns people who will use the infrastructure directly. (English) / rank
 
Normal rank
Property / summary: Project Bn: Replacement of heating equipment in the framework of local heat sources together with thermal modernisation of buildings and installation of RES in order to reduce “low emissions” in Naruszewo commune will be carried out in the rural commune Naruszewo, in Płoń.The material scope of the project includes the replacement of heating equipment in the building of the Podst. School in Krysk and in the auxiliary building of the Podst. School in Krysk. 2 % of the heating factor is the reduction of the heating medium in the heating medium (main heat pump) and for the building of the Auxiliary School of Podst. in Krysk there will be a replacement of the heating device:from the coal boiler to the heating agent supplied with the RES (main heat pump), therefore there is a need to carry out the heat factor in the two buildings of the school’s heating work. The beneficiary has PGN, energy audits and design energy characteristics.The target group of the project concerns people who will use the infrastructure directly. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:21, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Replacement of heating equipment from local heat sources together with the thermal modernisation of buildings and the installation of RES in order to reduce the “low emission” in the municipality of Violzewo.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,453,211.28 zloty
    0 references
    348,770.71 Euro
    13 January 2020
    0 references
    1,816,514.11 zloty
    0 references
    435,963.39 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    21 August 2017
    0 references
    31 December 2020
    0 references
    GMINA NARUSZEWO
    0 references

    52°31'38.3"N, 20°21'23.8"E
    0 references
    Projekt pn: Wymiana urządzeń grzewczych w ramach lokalnych źródeł ciepła wraz z termomodernizacją budynków oraz instalacją OZE celem ograniczenia "niskiej emisji" w gminie Naruszewo realizowany będzie w gminie wiejskiej Naruszewo, w pow.płońskim.Zakres rzeczowy projektu uwzględnia wymianę urządzeń grzewczych w budynku Szkoły Podst. w Krysku oraz w budynku Pomocniczym Szkoły Podst. w Krysku.Dla budynku Szkoły Podst. w Krysku zaprojektowano wymianę urządzenia grzewczego; z pieca na ekogroszek na czynnik grzewczy zasilany z OZE (gruntowa pompa ciepła) oraz dla budynku Pomocniczego Szkoły Podst. w Krysku nastąpi wymiana urządzenia grzewczego:z kotła węglowego na czynnik grzewczy zasilany z OZE (gruntowa pompa ciepła),dlatego istnieje konieczność przeprowadzenia w obydwu budynkach prac termomodernizacyjnych.Ciepło do celów grzewczych dostarczane będzie przy pomocy gruntowej pompy ciepła (zaopatrzenie w ciepło budynku Szkoły Podst. w Krysku oraz budynku Pomocniczego Szkoły Podst. w Krysku).W wyniku wymiany czynnika grzewczego w budynku Szkoły Podst. w Krysku z kotła na ekogroszek na czynnik grzewczy zasilany z OZE (gruntowa pompa ciepła) uzyskano zmniejszenie emisji CO2 o 73,08 % oraz pyłów o 96,12 %.W wyniku wymiany czynnika grzewczego w budynku Pomocniczym Szkoły Podst. w Krysku z kotła węglowego na czynnik grzewczy zasilany z OZE (gruntowa pompa ciepła) uzyskano zmniejszenie emisji CO2 o 88,61 % oraz pyłów o 98,34 %.Tak więc głównym celem projektu jest redukcja zanieczyszczeń powietrza.W związku z powyższym Wnioskodawca ubiega się o dofinansowanie projektu dotyczącego likwidacji „niskiej emisji” w regionie. Beneficjent posiada PGN, audyty energetyczne oraz projektowane charakterystyki energetyczne.Grupa docelowa projektu dotyczy osób, które w bezpośredni sposób będą korzystały z powstałej infrastruktury. (Polish)
    0 references
    Project Bn: Replacement of heating equipment in the framework of local heat sources together with thermal modernisation of buildings and installation of RES in order to reduce “low emissions” in Naruszewo commune will be carried out in the rural commune Naruszewo, in Płoń.The material scope of the project includes the replacement of heating equipment in the building of the Podst. School in Krysk and in the auxiliary building of the Podst. School in Krysk. 2 % of the heating factor is the reduction of the heating medium in the heating medium (main heat pump) and for the building of the Auxiliary School of Podst. in Krysk there will be a replacement of the heating device:from the coal boiler to the heating agent supplied with the RES (main heat pump), therefore there is a need to carry out the heat factor in the two buildings of the school’s heating work. The beneficiary has PGN, energy audits and design energy characteristics.The target group of the project concerns people who will use the infrastructure directly. (English)
    20 October 2020
    0 references

    Identifiers

    RPMA.04.03.01-14-B393/18
    0 references