Renovation of the Urban and District Hall of the Public Library in Nowy Dwór Mazowiecki (Q109052): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is a thermo-modernisation of the public building, which is located in public libraries. It aims to decarbonise the economy. Thus, there will be an increase in the energy efficiency of the building, which will result in significant economic savings. Reducing consumption will also contribute to air and environmental protection. Currently, in terms of thermal protection, a building does not fulfil the technical and construction condit...) |
(Created claim: summary (P836): The aim of the project is to thermally modernise the public utility building, which is the seat of the publ library. The aim is to reduce the eulogy of the economy. This will result in increased energy efficiency in the building, resulting in significant economic savings. Reducing consumption will also contribute to the protection of air and the environment. Currently, in terms of thermal protection, the building does not meet the technical and...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to thermally modernise the public utility building, which is the seat of the publ library. The aim is to reduce the eulogy of the economy. This will result in increased energy efficiency in the building, resulting in significant economic savings. Reducing consumption will also contribute to the protection of air and the environment. Currently, in terms of thermal protection, the building does not meet the technical and construction requirements. The main objective of the project is to increase the energy efficiency of the building and the specific objectives are: — improvement of the technical condition of the building., – insulation of the outer walls, – reduction of heat loss, – improvement of the aesthetics of the building The material scope of the project and individual activities: — thermal insulation of the walls on the ground, the outer walls above the ground by the application of warming of the building using light wet method, – thermomodernisation of the floor on the ground by the application of polystyrofoam insulation and concrete excretion, – thermal modernisation of the outer ceiling under an unheated attic by application of insulation in the form of styropapapa, – thermal modernisation of the window and door carpentry. a) Reconstruction of a higher efficiency heating system (b) use of weather automation, c) heat counter installation, d) installation of upholstery valves and thermostats. — thermomodernisation of hot water installations by: a) connection to the district heating network and the use of cheaper heat source, b) heat counter installation. The most important stages of the project are the selection of the contractor of the task (tender procedure), the implementation of the investment and partial and final settlement of the project. The main beneficiaries of the project are people using the library, its employees, residents of the city, county and voivodship. The implementation of the project will create better conditions for life and development. (English) | |||||||||||||||
Property / summary: The aim of the project is to thermally modernise the public utility building, which is the seat of the publ library. The aim is to reduce the eulogy of the economy. This will result in increased energy efficiency in the building, resulting in significant economic savings. Reducing consumption will also contribute to the protection of air and the environment. Currently, in terms of thermal protection, the building does not meet the technical and construction requirements. The main objective of the project is to increase the energy efficiency of the building and the specific objectives are: — improvement of the technical condition of the building., – insulation of the outer walls, – reduction of heat loss, – improvement of the aesthetics of the building The material scope of the project and individual activities: — thermal insulation of the walls on the ground, the outer walls above the ground by the application of warming of the building using light wet method, – thermomodernisation of the floor on the ground by the application of polystyrofoam insulation and concrete excretion, – thermal modernisation of the outer ceiling under an unheated attic by application of insulation in the form of styropapapa, – thermal modernisation of the window and door carpentry. a) Reconstruction of a higher efficiency heating system (b) use of weather automation, c) heat counter installation, d) installation of upholstery valves and thermostats. — thermomodernisation of hot water installations by: a) connection to the district heating network and the use of cheaper heat source, b) heat counter installation. The most important stages of the project are the selection of the contractor of the task (tender procedure), the implementation of the investment and partial and final settlement of the project. The main beneficiaries of the project are people using the library, its employees, residents of the city, county and voivodship. The implementation of the project will create better conditions for life and development. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to thermally modernise the public utility building, which is the seat of the publ library. The aim is to reduce the eulogy of the economy. This will result in increased energy efficiency in the building, resulting in significant economic savings. Reducing consumption will also contribute to the protection of air and the environment. Currently, in terms of thermal protection, the building does not meet the technical and construction requirements. The main objective of the project is to increase the energy efficiency of the building and the specific objectives are: — improvement of the technical condition of the building., – insulation of the outer walls, – reduction of heat loss, – improvement of the aesthetics of the building The material scope of the project and individual activities: — thermal insulation of the walls on the ground, the outer walls above the ground by the application of warming of the building using light wet method, – thermomodernisation of the floor on the ground by the application of polystyrofoam insulation and concrete excretion, – thermal modernisation of the outer ceiling under an unheated attic by application of insulation in the form of styropapapa, – thermal modernisation of the window and door carpentry. a) Reconstruction of a higher efficiency heating system (b) use of weather automation, c) heat counter installation, d) installation of upholstery valves and thermostats. — thermomodernisation of hot water installations by: a) connection to the district heating network and the use of cheaper heat source, b) heat counter installation. The most important stages of the project are the selection of the contractor of the task (tender procedure), the implementation of the investment and partial and final settlement of the project. The main beneficiaries of the project are people using the library, its employees, residents of the city, county and voivodship. The implementation of the project will create better conditions for life and development. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 09:18, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of the Urban and District Hall of the Public Library in Nowy Dwór Mazowiecki |
Project in Poland financed by DG Regio |
Statements
347,676.45 zloty
0 references
434,595.57 zloty
0 references
80.0 percent
0 references
15 February 2016
0 references
30 September 2019
0 references
MIEJSKA I POWIATOWA BIBLIOTEKA PUBLICZNA W NOWYM DWORZE MAZOWIECKIM
0 references
Założeniem projektu jest termomodernizacja budynku użyteczności publicznej, będącego siedzibą biblioteki publ. Ma ona na celu zmniejszenie emisyjności gospodarki. Tym samym nastąpi zwiększenie efektywności energetycznej w budynku, co przyniesie znaczne oszczędności ekonomiczne. Zmniejszenie zużycia przyczyni się także do ochrony powietrza i środowiska naturalnego. Obecnie pod względem ochrony cieplnej budynek nie spełnia warunków techniczno – budowlanych. Celem głównym proj. jest zwiększenie efektywności energetycznej budynku a cele szczegółowe to: - poprawa stanu technicznego bud., - ocieplenie ścian zewn., - zmniejszenie strat ciepła, - poprawa estetyki budynku Zakres rzeczowy projektu i poszczególnych działań: - termoizolacja ścian na gruncie, ścian zewn. ponad gruntem poprzez zastosowanie ocieplenia budynku metodą lekką mokrą, - termomodernizacja podłogi na gruncie poprzez zastosowanie ocieplenia styropianem i warstwy wylewki betonowej, - termomodernizacja stropu zewn. pod nieogrzewanym poddaszem poprzez zastosowanie ocieplenia w formie styropapy, - termomodernizacja stolarki okiennej i drzwiowej, spełniającej kryteria WT 2017, - termomodernizacji instalacji c.o. poprzez : a) przebudowę systemu grzewczego o wyższych sprawnościach b) zastosowanie automatyki pogodowej, c) instalację licznika ciepła c.o. , d) instalację zaworów podpionowych i termostatów. - termomodernizacji instalacji c.w.u. poprzez: a) przyłączenie do miejskiej sieci ciepłow. i wykorzystanie tańszego źródła ciepła, b) instalację licznika ciepła c.w.u. Najważniejsze etapy projektu to wybór wykonawcy zadania (postępowanie przetargowe), realizacja inwestycji i częściowe oraz końcowe rozliczenie projektu. Głównymi beneficjentami projektu są osoby korzystające z biblioteki, jej pracownicy, mieszkańcy miasta i powiatu oraz województwa. Realizacja projektu stworzy im lepsze warunki do życia i rozwoju. (Polish)
0 references
The aim of the project is to thermally modernise the public utility building, which is the seat of the publ library. The aim is to reduce the eulogy of the economy. This will result in increased energy efficiency in the building, resulting in significant economic savings. Reducing consumption will also contribute to the protection of air and the environment. Currently, in terms of thermal protection, the building does not meet the technical and construction requirements. The main objective of the project is to increase the energy efficiency of the building and the specific objectives are: — improvement of the technical condition of the building., – insulation of the outer walls, – reduction of heat loss, – improvement of the aesthetics of the building The material scope of the project and individual activities: — thermal insulation of the walls on the ground, the outer walls above the ground by the application of warming of the building using light wet method, – thermomodernisation of the floor on the ground by the application of polystyrofoam insulation and concrete excretion, – thermal modernisation of the outer ceiling under an unheated attic by application of insulation in the form of styropapapa, – thermal modernisation of the window and door carpentry. a) Reconstruction of a higher efficiency heating system (b) use of weather automation, c) heat counter installation, d) installation of upholstery valves and thermostats. — thermomodernisation of hot water installations by: a) connection to the district heating network and the use of cheaper heat source, b) heat counter installation. The most important stages of the project are the selection of the contractor of the task (tender procedure), the implementation of the investment and partial and final settlement of the project. The main beneficiaries of the project are people using the library, its employees, residents of the city, county and voivodship. The implementation of the project will create better conditions for life and development. (English)
20 October 2020
0 references
Identifiers
RPMA.04.02.00-14-5397/16
0 references