Improving the energy efficiency of the Primary School Building in msoc. Hoplom Duży (Q105279): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project involves the completion of thermal modernisation, including the insulation of building envelope, the exchange of doors, the replacement of a c.o system with the installation of the heat meters, the vertical and thermostatic valves and the installation of solar panels in the building of the Primary School in Malje Duży. The target group of the project is the users of the infrastructure — children and their parents and school staff....) |
(Created claim: summary (P836): The project includes thermal modernisation, including warming of partitions of the building, replacement of doors, replacement of central heating systems, installation of heat meters, upholstery valves and thermostatic valves, as well as installation of photovoltaic panels in the building of the Primary School in Małochwiej Largeży. The target group of the project is infrastructure users – children and their parents and school staff. The project...) |
||||||||||||||
Property / summary | |||||||||||||||
The project includes thermal modernisation, including warming of partitions of the building, replacement of doors, replacement of central heating systems, installation of heat meters, upholstery valves and thermostatic valves, as well as installation of photovoltaic panels in the building of the Primary School in Małochwiej Largeży. The target group of the project is infrastructure users – children and their parents and school staff. The project will also benefit from the local community, as the project contributes to preventing low emissions and improving air quality in the municipality. The main objective of the project is to increase energy efficiency and share of energy from RES by carrying out thermal modernisation works and assembling photovoltaic panels in the building of the Primary School in Małochwiej Duży. The project will achieve the following key project results: The amount of thermal energy savings 353,30 GJ/year, The amount of electricity saved 18,12 MW/h, Manufacture of electricity from newly built/new generation capacity of installations using RES 18,12 MW/h, Reduction of annual primary energy consumption in public buildings (CI32) 159871,33 kWh/year, Estimated annual reduction in greenhouse gas emissions (CI34) 64.94 tonnes of CO2/year, Production of electricity from newly built installations using renewable energy, 18 (English) | |||||||||||||||
Property / summary: The project includes thermal modernisation, including warming of partitions of the building, replacement of doors, replacement of central heating systems, installation of heat meters, upholstery valves and thermostatic valves, as well as installation of photovoltaic panels in the building of the Primary School in Małochwiej Largeży. The target group of the project is infrastructure users – children and their parents and school staff. The project will also benefit from the local community, as the project contributes to preventing low emissions and improving air quality in the municipality. The main objective of the project is to increase energy efficiency and share of energy from RES by carrying out thermal modernisation works and assembling photovoltaic panels in the building of the Primary School in Małochwiej Duży. The project will achieve the following key project results: The amount of thermal energy savings 353,30 GJ/year, The amount of electricity saved 18,12 MW/h, Manufacture of electricity from newly built/new generation capacity of installations using RES 18,12 MW/h, Reduction of annual primary energy consumption in public buildings (CI32) 159871,33 kWh/year, Estimated annual reduction in greenhouse gas emissions (CI34) 64.94 tonnes of CO2/year, Production of electricity from newly built installations using renewable energy, 18 (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project includes thermal modernisation, including warming of partitions of the building, replacement of doors, replacement of central heating systems, installation of heat meters, upholstery valves and thermostatic valves, as well as installation of photovoltaic panels in the building of the Primary School in Małochwiej Largeży. The target group of the project is infrastructure users – children and their parents and school staff. The project will also benefit from the local community, as the project contributes to preventing low emissions and improving air quality in the municipality. The main objective of the project is to increase energy efficiency and share of energy from RES by carrying out thermal modernisation works and assembling photovoltaic panels in the building of the Primary School in Małochwiej Duży. The project will achieve the following key project results: The amount of thermal energy savings 353,30 GJ/year, The amount of electricity saved 18,12 MW/h, Manufacture of electricity from newly built/new generation capacity of installations using RES 18,12 MW/h, Reduction of annual primary energy consumption in public buildings (CI32) 159871,33 kWh/year, Estimated annual reduction in greenhouse gas emissions (CI34) 64.94 tonnes of CO2/year, Production of electricity from newly built installations using renewable energy, 18 (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 08:56, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of the Primary School Building in msoc. Hoplom Duży |
Project in Poland financed by DG Regio |
Statements
974,772.92 zloty
0 references
1,146,791.7 zloty
0 references
85.0 percent
0 references
15 September 2017
0 references
19 November 2021
0 references
GMINA KRASNYSTAW
0 references
Projekt obejmuje przeprowadzenie termomodernizacji, w tym docieplenie przegród budynku, wymianę drzwi, wymianę instalacji c.o. wraz z montażem liczników ciepła, zaworów podpionowych i zaworów termostatycznych oraz montaż paneli fotowoltaicznych w budynku Szkoły Podstawowej w miejscowości Małochwiej Duży. Grupą docelową projektu są użytkownicy infrastruktury - dzieci i ich rodzice oraz pracownicy szkoły. Z efektów projektu korzystać będzie również lokalna społeczność, gdyż projekt przyczynia się do przeciwdziałania niskiej emisji oraz poprawy jakości powietrza w gminie. Celem głównym projektu jest Zwiększenie efektywności energetycznej oraz udziału energii pochodzącej z OZE poprzez przeprowadzenie prac termomodernizacyjnych i montaż paneli fotowoltaicznych w budynku Szkoły Podstawowej w miejscowości Małochwiej Duży. W ramach projektu zostaną osiągnięte następujące kluczowe rezultaty projektu: Ilość zaoszczędzonej energii cieplnej 353,30 GJ/rok, Ilość zaoszczędzonej energii elektrycznej 18,12 MW/h, Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE 18,12 MW/h, Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CI32) 159 871,33 kWh/rok, Szacowany roczny spadek emisji gazów cieplarnianych (CI34) 64,94 tony równoważnika CO2/rok, Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE 18,12 MWhe/rok, Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (CI30) 20,02 [MW], Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych 20,02 [MWe]. (Polish)
0 references
The project includes thermal modernisation, including warming of partitions of the building, replacement of doors, replacement of central heating systems, installation of heat meters, upholstery valves and thermostatic valves, as well as installation of photovoltaic panels in the building of the Primary School in Małochwiej Largeży. The target group of the project is infrastructure users – children and their parents and school staff. The project will also benefit from the local community, as the project contributes to preventing low emissions and improving air quality in the municipality. The main objective of the project is to increase energy efficiency and share of energy from RES by carrying out thermal modernisation works and assembling photovoltaic panels in the building of the Primary School in Małochwiej Duży. The project will achieve the following key project results: The amount of thermal energy savings 353,30 GJ/year, The amount of electricity saved 18,12 MW/h, Manufacture of electricity from newly built/new generation capacity of installations using RES 18,12 MW/h, Reduction of annual primary energy consumption in public buildings (CI32) 159871,33 kWh/year, Estimated annual reduction in greenhouse gas emissions (CI34) 64.94 tonnes of CO2/year, Production of electricity from newly built installations using renewable energy, 18 (English)
20 October 2020
0 references
Identifiers
RPLU.05.02.00-06-0026/17
0 references