Production of electricity from RES in Arkadiusz Kończyk — MIX (Q105027): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The object of the project is the construction of a photovoltaic farm in the town of Sitaiec situated in the town of town of Zamora, the municipality of Zamość. Electricity produced by the farm — ca. 103.05 MWh will be used to meet the applicant’s own needs and the excess production will be transferred to the local energy network. The design of the installation will be mounted on the steppe of the coil profiles and on the block frames in the fr...)
(‎Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm in Sitaniec Błonie in Zamość County, the village municipality Zamość. Electricity generated by the farm – approx. 103,05 MWh – will be designed to meet the applicant’s own needs and surplus production will be transferred to the local power grid. The designed installation will be mounted on frames made of ce-profiles and hat profiles in a freestanding system. The plot area will...)
Property / summary
 
The subject of the project is the construction of a photovoltaic farm in Sitaniec Błonie in Zamość County, the village municipality Zamość. Electricity generated by the farm – approx. 103,05 MWh – will be designed to meet the applicant’s own needs and surplus production will be transferred to the local power grid. The designed installation will be mounted on frames made of ce-profiles and hat profiles in a freestanding system. The plot area will allow installation of 332 PV panels. The applicant intends to use modern and efficient Sunmodule Plus SW 290 Mono panels with a capacity of 290 Wp (or similar), as well as photovoltaic inverters of the type Kaco Good Blueplanet 20.0 TL3-INT in the amount of 4 pieces. This configuration will offer real power approx. 90.00 kW (96.28 kW – theoretical power with an efficiency of 100 %). The applicant has an agreement with the local electricity distributor, i.e. PGE Fr. Zamość – thanks to the agreement surplus energy will power the urban power grid. The implementation of the project (construction of the power plant), as well as the subsequent operation of the facility, are environmentally neutral. There is no demand for water and sewage production, no gaseous pollutants and any solid and liquid waste. There is also no noise and vibration emissions. The impact of the installation on soil and surface water and subsurface water was determined at zero (neutral). (English)
Property / summary: The subject of the project is the construction of a photovoltaic farm in Sitaniec Błonie in Zamość County, the village municipality Zamość. Electricity generated by the farm – approx. 103,05 MWh – will be designed to meet the applicant’s own needs and surplus production will be transferred to the local power grid. The designed installation will be mounted on frames made of ce-profiles and hat profiles in a freestanding system. The plot area will allow installation of 332 PV panels. The applicant intends to use modern and efficient Sunmodule Plus SW 290 Mono panels with a capacity of 290 Wp (or similar), as well as photovoltaic inverters of the type Kaco Good Blueplanet 20.0 TL3-INT in the amount of 4 pieces. This configuration will offer real power approx. 90.00 kW (96.28 kW – theoretical power with an efficiency of 100 %). The applicant has an agreement with the local electricity distributor, i.e. PGE Fr. Zamość – thanks to the agreement surplus energy will power the urban power grid. The implementation of the project (construction of the power plant), as well as the subsequent operation of the facility, are environmentally neutral. There is no demand for water and sewage production, no gaseous pollutants and any solid and liquid waste. There is also no noise and vibration emissions. The impact of the installation on soil and surface water and subsurface water was determined at zero (neutral). (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a photovoltaic farm in Sitaniec Błonie in Zamość County, the village municipality Zamość. Electricity generated by the farm – approx. 103,05 MWh – will be designed to meet the applicant’s own needs and surplus production will be transferred to the local power grid. The designed installation will be mounted on frames made of ce-profiles and hat profiles in a freestanding system. The plot area will allow installation of 332 PV panels. The applicant intends to use modern and efficient Sunmodule Plus SW 290 Mono panels with a capacity of 290 Wp (or similar), as well as photovoltaic inverters of the type Kaco Good Blueplanet 20.0 TL3-INT in the amount of 4 pieces. This configuration will offer real power approx. 90.00 kW (96.28 kW – theoretical power with an efficiency of 100 %). The applicant has an agreement with the local electricity distributor, i.e. PGE Fr. Zamość – thanks to the agreement surplus energy will power the urban power grid. The implementation of the project (construction of the power plant), as well as the subsequent operation of the facility, are environmentally neutral. There is no demand for water and sewage production, no gaseous pollutants and any solid and liquid waste. There is also no noise and vibration emissions. The impact of the installation on soil and surface water and subsurface water was determined at zero (neutral). (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:34, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Production of electricity from RES in Arkadiusz Kończyk — MIX
Project in Poland financed by DG Regio

    Statements

    0 references
    301,235.03 zloty
    0 references
    72,296.41 Euro
    13 January 2020
    0 references
    463,438.51 zloty
    0 references
    111,225.24 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 February 2018
    0 references
    31 January 2019
    0 references
    ARKADIUSZ KOŃCZYŃSKI - MIX
    0 references
    0 references
    Przedmiotem projektu jest budowa farmy fotowoltaicznej w miejscowości Sitaniec Błonie w powiecie zamojskim, gmina wiejska Zamość. Energia elektryczna wytwarzana przez farmę - ok. 103,05 MWh - przeznaczona będzie dla zaspokojenia potrzeb własnych przedsiębiorstwa wnioskodawcy, zaś nadwyżki produkcji przekazywane będą do lokalnej sieci energetycznej. Projektowana instalacja zamocowana będzie na stelażach z profili ceowych i kształtowników kapeluszowych w systemie wolnostojącym. Powierzchnia działki umożliwi zainstalowanie 332 szt. paneli PV. Wnioskodawca zamierza wykorzystać nowoczesne i wydajne panele typu Sunmodule Plus SW 290 Mono o mocy 290 Wp (lub podobne), a także inwertery fotowoltaiczne typu KACO Good Blueplanet 20.0 TL3-INT w ilości 4 szt. Taka konfiguracja oferować będzie rzeczywistą moc ok. 90,00 kW (96,28 kW - moc teoretyczna przy sprawności 100%). Wnioskodawca posiada umowę z lokalnym dystrybutorem energii elektrycznej, tj. PGE o. Zamość - dzięki umowie nadwyżki energii będą zasilały miejską sieć energetyczną. Realizacja projektu (budowa elektrowni), a także późniejsza eksploatacja obiektu, są neutralne na środowiska. Nie występuje zapotrzebowanie na wodę i wytwarzanie ścieków, brak zanieczyszczeń gazowych i jakichkolwiek odpadów stałych i płynnych. Brak również emisji hałasu i wibracji. Wpływ instalacji na glebę i wody powierzchniowe i podpowierzchniowe określono na zerowy (neutralny). (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic farm in Sitaniec Błonie in Zamość County, the village municipality Zamość. Electricity generated by the farm – approx. 103,05 MWh – will be designed to meet the applicant’s own needs and surplus production will be transferred to the local power grid. The designed installation will be mounted on frames made of ce-profiles and hat profiles in a freestanding system. The plot area will allow installation of 332 PV panels. The applicant intends to use modern and efficient Sunmodule Plus SW 290 Mono panels with a capacity of 290 Wp (or similar), as well as photovoltaic inverters of the type Kaco Good Blueplanet 20.0 TL3-INT in the amount of 4 pieces. This configuration will offer real power approx. 90.00 kW (96.28 kW – theoretical power with an efficiency of 100 %). The applicant has an agreement with the local electricity distributor, i.e. PGE Fr. Zamość – thanks to the agreement surplus energy will power the urban power grid. The implementation of the project (construction of the power plant), as well as the subsequent operation of the facility, are environmentally neutral. There is no demand for water and sewage production, no gaseous pollutants and any solid and liquid waste. There is also no noise and vibration emissions. The impact of the installation on soil and surface water and subsurface water was determined at zero (neutral). (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0295/17
    0 references