(Removed claim: summary (P836): The project consists of the construction of two photovoltaic installations, one with a power of 17.50 kW (roof installation) and one with 20.00 kW (terrestrial) — installations for the production of energy from renewable sources. The main objectives of the project are to improve the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and by protecting and improving the state of the environment. AS A RESULT...) |
(Created claim: summary (P836): The subject of the project is the construction of two photovoltaic installations – one with a capacity of 17.50 kW (roof installation) and the other with a capacity of 20.00 kW (terrestrial installation) – installations for the production of energy from renewable sources. The main goal of the project is to increase the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and protecting and improving the enviro...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the construction of two photovoltaic installations – one with a capacity of 17.50 kW (roof installation) and the other with a capacity of 20.00 kW (terrestrial installation) – installations for the production of energy from renewable sources. The main goal of the project is to increase the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and protecting and improving the environment. AS A RESULT OF THE PROJECT, THE FOLLOWING INDICATORS WILL BE ACHIEVED: — AT PRODUCT LEVEL: * Additional renewable energy generation capacity (CI30). * Additional capacity to generate electricity from renewable sources. * Number of built units of electricity generation from RES. * Number of enterprises receiving support (CI1). — AT THE LEVEL OF THE RESULT: * Estimated annual reduction in greenhouse gas emissions (CI34). * Manufacture of electricity from newly built/new RES-based installations. * Manufacture of electricity from newly built RES installations. * Number of newly created jobs – other forms. (English) | |||||||||||||||
Property / summary: The subject of the project is the construction of two photovoltaic installations – one with a capacity of 17.50 kW (roof installation) and the other with a capacity of 20.00 kW (terrestrial installation) – installations for the production of energy from renewable sources. The main goal of the project is to increase the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and protecting and improving the environment. AS A RESULT OF THE PROJECT, THE FOLLOWING INDICATORS WILL BE ACHIEVED: — AT PRODUCT LEVEL: * Additional renewable energy generation capacity (CI30). * Additional capacity to generate electricity from renewable sources. * Number of built units of electricity generation from RES. * Number of enterprises receiving support (CI1). — AT THE LEVEL OF THE RESULT: * Estimated annual reduction in greenhouse gas emissions (CI34). * Manufacture of electricity from newly built/new RES-based installations. * Manufacture of electricity from newly built RES installations. * Number of newly created jobs – other forms. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the construction of two photovoltaic installations – one with a capacity of 17.50 kW (roof installation) and the other with a capacity of 20.00 kW (terrestrial installation) – installations for the production of energy from renewable sources. The main goal of the project is to increase the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and protecting and improving the environment. AS A RESULT OF THE PROJECT, THE FOLLOWING INDICATORS WILL BE ACHIEVED: — AT PRODUCT LEVEL: * Additional renewable energy generation capacity (CI30). * Additional capacity to generate electricity from renewable sources. * Number of built units of electricity generation from RES. * Number of enterprises receiving support (CI1). — AT THE LEVEL OF THE RESULT: * Estimated annual reduction in greenhouse gas emissions (CI34). * Manufacture of electricity from newly built/new RES-based installations. * Manufacture of electricity from newly built RES installations. * Number of newly created jobs – other forms. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 17:33, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The production of renewable energy at the Lublin Diagnostic Centre |
Project in Poland financed by DG Regio |
Statements
121,916.33 zloty
0 references
187,563.6 zloty
0 references
65.0 percent
0 references
1 March 2018
0 references
30 July 2018
0 references
TOMASZ BLICHARSKI LUBELSKIE CENTRUM DIAGNOSTYCZNE
0 references
PRZEDMIOTEM projektu jest budowa dwóch instalacji fotowoltaicznych - jednej o mocy 17,50 kW (instalacja dachowa) oraz drugiej o mocy 20,00 kW (instalacja naziemna) - instalacji służących do produkcji energii pochodzącej ze źródeł odnawialnych. Głównym CELEM projektu jest podniesienie konkurencyjności Lubelskiego Centrum Diagnostycznego poprzez inwestycję w odnawialne źródła energii oraz ochrona i poprawa stanu środowiska naturalnego. W EFEKCIE REALIZACJI PROJEKTU OSIĄGNIĘTE ZOSTANĄ NASTĘPUJĄCE WSKAŹNIKI: - NA POZIOMIE PRODUKTU: * Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (CI30). * Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych. * Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE. * Liczba przedsiębiorstw otrzymujących wsparcie (CI1). - NA POZIOMIE REZULTATU: * Szacowany roczny spadek emisji gazów cieplarnianych (CI34). * Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE. * Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE. * Liczba nowo utworzonych miejsc pracy - pozostałe formy. (Polish)
0 references
The subject of the project is the construction of two photovoltaic installations – one with a capacity of 17.50 kW (roof installation) and the other with a capacity of 20.00 kW (terrestrial installation) – installations for the production of energy from renewable sources. The main goal of the project is to increase the competitiveness of the Lublin Diagnostic Centre by investing in renewable energy sources and protecting and improving the environment. AS A RESULT OF THE PROJECT, THE FOLLOWING INDICATORS WILL BE ACHIEVED: — AT PRODUCT LEVEL: * Additional renewable energy generation capacity (CI30). * Additional capacity to generate electricity from renewable sources. * Number of built units of electricity generation from RES. * Number of enterprises receiving support (CI1). — AT THE LEVEL OF THE RESULT: * Estimated annual reduction in greenhouse gas emissions (CI34). * Manufacture of electricity from newly built/new RES-based installations. * Manufacture of electricity from newly built RES installations. * Number of newly created jobs – other forms. (English)
17 October 2020
0 references
Identifiers
RPLU.04.02.00-06-0199/17
0 references