Installation of solar collectors for water heating in residential buildings in Trzeszczany Municipality (Q104767): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Installation of solar collectors for water heating in residential buildings in Trzeszczany Municipality

Revision as of 16:56, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of solar collectors for water heating in residential buildings in Trzeszczany Municipality
Project in Poland financed by DG Regio

    Statements

    0 references
    654,558.95 zloty
    0 references
    157,094.15 Euro
    13 January 2020
    0 references
    779,236.84 zloty
    0 references
    187,016.84 Euro
    13 January 2020
    0 references
    84.0 percent
    0 references
    2 April 2018
    0 references
    28 December 2018
    0 references
    GMINA TRZESZCZANY
    0 references
    Celem gł. proj. jest "zwiększenie wykorzystania OZE na terenie Gm. Trzeszczany". Cele szczegółowe to: Zwiększenie efektywności energetycznej gosp. domowych gm.. Poprawa jakości środowiska naturalnego GT. W związku z projektem zidenty. gr. interesariuszy: 1. I. główni (władzę lokalną, pracowników UG, IZ RPO WL, mieszkańców gm. biorący udział w proj.), 2. I. drugorzędni (mieszkańców gm. nie biorących udziału w proj., lokal. zakłady energetyczne, rolników.), 3. I. kontekstowi (mogący oddział. na proj: inst. publiczne związane z ochroną środ., władze region. i powiatowe, org. eko.) W ramach proj. zaplanowano realizację nast. zadań: Z.I.Instalacja kolektorów słonecznych w GT (84szt.) (2kol.+ podgrze.200l/d.skośny-12szt.; 2kol.+podgrze.200l/d. płaski4szt.; 2kol.+podgrze.200l/elewacja-6szt.; 2kol.+ podgrze.200l/d.skośny z korektą-4szt.; 3kol.+podgrze.300 l/d.płaski-8szt.; 3kol.+podgrze.300l/d. skośny-28szt.; 3kol.+podgrze.300l/elewacja-7szt.; 3 kol.+podgrze.300l/d.skośnym z korektą kąta-7szt.; 4kol.+podgrze.400l/d. skośny-7szt.; 4kol. + podgrze.400l/d. skośny z korektą-1szt.), Z.II.Nadzór inwestorski (1szt.) Z.III.Promocja - portal internetowy (1szt.) Bezp. rezultaty: - Dodatkowa zdolność wytwarzania e. odnawialne- 0,33MW - Produkcja e. cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzyst. OZE- 2 927,17MWht/rok - Szacowany roczny spadek emisji gazów cieplarnianych- 897,82 tony ekwiwalentu/rok. Projekt wpisuje się w "Strategię Rozwoju Gminy Trzeszczany 2015-2020" i ukierunkowany jest na pozyskiwanie e. z OZE, w tym także ze słońca. Dla osiągnięcia zakład. w proj. długofal. efektów, konieczna jest redukcja gazów cieplarni., powstałych w wyniku spalania paliw na terenie gm., -zwiększenie udziału ener. pochodzącej z OZE, -redukcja zużytej e. finalnej. Dodatkowo zgodnie z "Programem ochrony powietrza dla strefy lubelskiej" -inwestycja leży na ob. nieprzekracz. poz. dopuszcz. w odniesieniu do subst. podlegających ocenie jakości powietrza. (Polish)
    0 references
    The aim of the project is to “increase the use of RES in the territory of the Trzeszczany District”. The specific objectives are to: “Improvement of Energy Efficiency of Households”. Improving the quality of GT’s natural environment. In connection with the project, Identities of the Stakeholders: 1. I. main (local authority, employees of the UG, IZ RPO WL, residents of Gm. participating in the project), 2. I. secondary (inhabitants of the building not participating in the project, premises. energy plants, farmers.), 3. I. context (possible branch. on the project: public institutions related to the protection of Wednesdays, regional and county authorities, org. eco.) As part of the project, the following tasks are planned: Z.I.Installation of solar collectors in GT (84pcs) (2kol.+ preheat.200l/d. 2Col. + sub-heavy.200l/d. flat 4pcs; 2kol.+preheat.200l/elevation-6pcs; 2kol.+ preheated.200l/d. with correction – 4pcs; 3kol.+preservation.300 l/d. flat-8pcs; 3kol.+prepare.300l/d. diagonal-28pc.; 3kol.+preheat.300l/elevation-7pcs; 3 kol. + sub-heater.300l/d. with an angle correction of 7pcs; 4kol.+prepare.400l/d. diagonal-7pc.; It’s 4kol. + preheated.400l/d. with correction-1pieces), Z.II.Investor supervision (1pcs) Z.III.Promotion – web portal (1pcs) No results: — Additional production capacity e. renewables- 0,33 MW – Production of heat e. from newly built/new generation capacity of installations. RES- 2 927.17MWht/year – Estimated annual reduction in greenhouse gas emissions – 897.82 tonnes equivalent/year. The project is part of the “Strategy for the Development of the Municipality Trzeszczany 2015-2020” and is aimed at obtaining e. from RES, including from the sun. In order to achieve the plant’s long-wave effects, it is necessary to reduce greenhouse gases resulting from the combustion of fuels on the premises, -increase the share of energy from RES, -reduction of used e. final. In addition, according to the “Air Protection Programme for the Lubelskie Zone” – the investment lies on the subject matter of air quality assessment. (English)