Q105592 (Q105592): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the project is the modernisation of water in the town of Rudolfin in Kamień. According to the feasibility study, the main problem of water consumers in the context of the project is the unsatisfactory quality of water intake (increased iron level) and periodically low water pressure. Capture operator – MPGK in Chełm is struggling with problems of low functionality of the water intake object, due to: — high level of wear of install...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 16:43, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
543,138.23 zloty
0 references
638,986.18 zloty
0 references
85.0 percent
0 references
9 November 2015
0 references
31 January 2018
0 references
GMINA KAMIEŃ
0 references
Przedmiotem projektu jest modernizacja ujęcia wody w miejscowości Rudolfin w Gminie Kamień. Z przeprowadzonej w studium wykonalności analizy wynika, że głównym problemem odbiorców wody w kontekście projektu jest niezadowalająca jakość dostarczanej przez ujęcie wody (podwyższony poziom żelaza) oraz okresowo występujące niskie ciśnienie wody. Operator ujęcia - MPGK w Chełmie boryka się z problemami niskiej funkcjonalności obiektu ujęcia wody, z powodu: - wysokiego stopnia zużycia zainstalowanych urządzeń wysoka awaryjność); - anachroniczności rozwiązań technologicznych (do wodociągów tłoczą wodę pompy pobierające wodę bezpośrednio ze źródła, które muszą ją przetłoczyć przez system filtrowania, stąd wynikają spadki ciśnienia wody w sieci dla odbiorców końcowych); - stratność energii w powodu przestarzałych urządzeń oraz niewystarczające izolacji budynku pompowni; - zwiększona pracochłonność związana z dozorem nad pracą ujęcia. Celem projektu jest poprawa jakości i standardu usług dostarczanych przez ujęcie wody w Rudolfinie. Zadania zaplanowane w projekcie mają głównie charakter: - prac budowlanych, m.in. budowa zbiornika wyrównawczego, izolacja termiczna budynku; - oraz związanych z instalacją urządzeń, m.in. nowe filtry w systemie oczyszczania wody, pompy II stopnia tłoczące wodę do sieci wodociągowej oraz system zdalnego monitoringu pracy urządzeń. Grupą docelową efektów projektu są: - użytkownicy sieci: 738 osób, mieszkańców G. Kamień i Dorohusk - odczują poprawę jakości dostaw oraz jakości dostarczanej wody; - operator systemu - nastąpi usprawnienie zarządzania ujęciem oraz obniżka kosztów eksploatacyjnych; - G. Kamień, która jest ustawowo odpowiedzialna za gospodarkę komunalną na swoim terenie. Realizacja projektu doprowadzi do osiągnięcia wskaźników: - rezultatu "Przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę": 738 osób; "Wydajność dobowa wybudowanych ujęć wody: 50 m3/dobę; - produktu "Liczba wspartych stacji uzdatniania wody": 1. (Polish)
0 references
The subject of the project is the modernisation of water in the town of Rudolfin in Kamień. According to the feasibility study, the main problem of water consumers in the context of the project is the unsatisfactory quality of water intake (increased iron level) and periodically low water pressure. Capture operator – MPGK in Chełm is struggling with problems of low functionality of the water intake object, due to: — high level of wear of installed equipment high failure rate); — the anachronity of technological solutions (water pumps extracting water directly from the source, which must overwhelm it through the filtration system, result in drops of water pressure in the network for end-users); — energy loss due to outdated equipment and insufficient insulation of the pumping plant building; — increased labour intensity associated with the supervision of the work of the shot. The aim of the project is to improve the quality and standard of services provided by water intake in Rudolfin. The tasks planned in the project are mainly: — construction works, including the construction of a compensatory tank, thermal insulation of the building; — and equipment related to installation, among others new filters in the water purification system, second-degree pumps pumping water into the water supply network and remote monitoring system of equipment. The target group of the project’s effects are: — network users: 738 people, residents of G. Kamień and Dorohusk, will experience improvements in the quality of supplies and the quality of the water supplied; — system operator – improved recognition management and reduction of operating costs; — G. Kamień, which is legally responsible for the municipal economy in its territory. The implementation of the project will lead to the achievement of indicators: — result “Project number of persons benefiting from improved water supply”: 738 persons; ‘Daily capacity of built water intakes: 50 m³/day; — product “Number of supported water treatment stations”: 1. (English)
17 October 2020
0 references
Identifiers
RPLU.06.04.00-06-0012/15
0 references