Air protection and reduction of traditional energy use in the municipality of Wilkołacz (Q104743): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will create new installations for the production of solar power and biomass and will take place in the OSI area: 7. Type of vehicle: construction and reconstruction of infrastructure for a pro.en.pro.en.pro.pro.pro.unit.Main issue to be resolved by the proj.pro.pro.pro.will be resolved. remedial action will concentrate on reducing the harmful CO2 emissions in the area of Gm.Wilkołacz by improving the energy efficiency and the incre...)
(‎Created claim: summary (P836): The project creates new installations for the production of solar and biomass energy, and its implementation will take place in the OSI area:7. Type of project:Construction and reconstruction of infrastruk. served for prod.en. coming from RES.Proj.responsible to the needs of stakeholders.The main problem that will be solved by real.pre. project.There will be department.Remedial.repair. 291pcs.3150W/300l,4-5persons.power:0,9167MW; 162pcs.4200W/40...)
Property / summary
 
The project creates new installations for the production of solar and biomass energy, and its implementation will take place in the OSI area:7. Type of project:Construction and reconstruction of infrastruk. served for prod.en. coming from RES.Proj.responsible to the needs of stakeholders.The main problem that will be solved by real.pre. project.There will be department.Remedial.repair. 291pcs.3150W/300l,4-5persons.power:0,9167MW; 162pcs.4200W/400l,6+person,power:0,6804MW-assembly on facade or roof) and 35 biomass kilns (9pc.pellet20kW,power 0,18 MW; 1 pc.pellet24kW,power:0,024MW; In addition to the rest of the intervals, it is available in order of 0 % of the volume, the non-existence of the rest of the volume, and the rest of the time, in order of the non-fixing of the rest of the volumes.(714,1,8.302xxxx) in order.(85.1.1xxxxxx) in order.(714.1 % of the time, and the inconsistencies of the non-existence of the volume of the quantity.) in order of non-consumption of the quantity, the quantity of which is not available in order.(0.714-1xxxxxxxxxxxxx) in order of non-singlex., in the manner of the non-singlears, the non-singal of which, in the manner of non-existent time, is incomplete.(714,1,8.302,302,302,85.,1., and incl. 0.714-1,8.302,302,85,1.,1,1,1,1,992,081,302,302,302,302,302,85.1,1,992,302,302,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,714,1,1,8.302,85,1,1,1,992,081, and in 0. 714 % of the intervals of which, in order of 714 % of the intervals of the intervals of the intervals of the intervals, the quantity of non-existent, in order of 0.,714,1,8,302,85,1,1, and 8785 % of the quantity, in 0.-714,1,8xx,302,302,85,1,1,1,992,081,xxxxxx,--85,1,1,992,081,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,302,85,-1,1,1,-992.,-302,85,1,1, 992,081,1,992,081,-,-992.,-1.-992,081, and 20 % of the volumes of the Cost-Decorm.,-Net-Net-Net-Net-Net-,t, and the Cost. of the Cost., and the Cost., the Question of the Question of the Cost., and the Cost.,.,.,.,.,.,.,., the Cost.--714.,-Next.,-0.-714., the Cost.-R.-R.,-Red, inc.F.-714,1,8,302,302,85,1,1,1,992,081,-85,1,1,1,992,081,302,85.1,1,992,081xxxxxxxxt.,-85.1.1,992xxxxxt.,-8.302,85.1,1.992.,-992.081,-85.1.1,-992.-081.-85.1,1,-992.-992.081,-85.1,1,992.081xxx,-85.1 %,1xx,-1 % of the time available.,-992x-302,85x1x1,992.081,302,85x1x1x992x302,302,85.1.1.992xxxt-992.081,302,302-85.1.1.992.081xxxxxxxxxxxxxxxxxxxxxxxxxx-302-85.1x1xxxxxxxxxx)-714x302x85x1x1x1x1.1.1.992.081..992.302,302.85.1.1.992.302 % in 85.1.1 % of the size of the inc.-85.1 %, 1.1.1 % of the volume of the.1.1xxxxx, inc.---1.992.,302,302,302,85,1,1,992,081,302,85x1,1x1,1,992.081xx,302,302,85x1,1xxx,-992.302,302,85x1,1xx,302,302,302,85,302,302,85x1,1,302,85x1,1,1,992,081,081x302,302,85x1,1,992,302,302,302,302,85,302,302,85,302,85,1,1,1,1,1,992,302,302,85.1,1.1.1.992.302,302,85.1,1.992.302,302,85.1.1 (English)
Property / summary: The project creates new installations for the production of solar and biomass energy, and its implementation will take place in the OSI area:7. Type of project:Construction and reconstruction of infrastruk. served for prod.en. coming from RES.Proj.responsible to the needs of stakeholders.The main problem that will be solved by real.pre. project.There will be department.Remedial.repair. 291pcs.3150W/300l,4-5persons.power:0,9167MW; 162pcs.4200W/400l,6+person,power:0,6804MW-assembly on facade or roof) and 35 biomass kilns (9pc.pellet20kW,power 0,18 MW; 1 pc.pellet24kW,power:0,024MW; In addition to the rest of the intervals, it is available in order of 0 % of the volume, the non-existence of the rest of the volume, and the rest of the time, in order of the non-fixing of the rest of the volumes.(714,1,8.302xxxx) in order.(85.1.1xxxxxx) in order.(714.1 % of the time, and the inconsistencies of the non-existence of the volume of the quantity.) in order of non-consumption of the quantity, the quantity of which is not available in order.(0.714-1xxxxxxxxxxxxx) in order of non-singlex., in the manner of the non-singlears, the non-singal of which, in the manner of non-existent time, is incomplete.(714,1,8.302,302,302,85.,1., and incl. 0.714-1,8.302,302,85,1.,1,1,1,1,992,081,302,302,302,302,302,85.1,1,992,302,302,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,714,1,1,8.302,85,1,1,1,992,081, and in 0. 714 % of the intervals of which, in order of 714 % of the intervals of the intervals of the intervals of the intervals, the quantity of non-existent, in order of 0.,714,1,8,302,85,1,1, and 8785 % of the quantity, in 0.-714,1,8xx,302,302,85,1,1,1,992,081,xxxxxx,--85,1,1,992,081,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,302,85,-1,1,1,-992.,-302,85,1,1, 992,081,1,992,081,-,-992.,-1.-992,081, and 20 % of the volumes of the Cost-Decorm.,-Net-Net-Net-Net-Net-,t, and the Cost. of the Cost., and the Cost., the Question of the Question of the Cost., and the Cost.,.,.,.,.,.,.,., the Cost.--714.,-Next.,-0.-714., the Cost.-R.-R.,-Red, inc.F.-714,1,8,302,302,85,1,1,1,992,081,-85,1,1,1,992,081,302,85.1,1,992,081xxxxxxxxt.,-85.1.1,992xxxxxt.,-8.302,85.1,1.992.,-992.081,-85.1.1,-992.-081.-85.1,1,-992.-992.081,-85.1,1,992.081xxx,-85.1 %,1xx,-1 % of the time available.,-992x-302,85x1x1,992.081,302,85x1x1x992x302,302,85.1.1.992xxxt-992.081,302,302-85.1.1.992.081xxxxxxxxxxxxxxxxxxxxxxxxxx-302-85.1x1xxxxxxxxxx)-714x302x85x1x1x1x1.1.1.992.081..992.302,302.85.1.1.992.302 % in 85.1.1 % of the size of the inc.-85.1 %, 1.1.1 % of the volume of the.1.1xxxxx, inc.---1.992.,302,302,302,85,1,1,992,081,302,85x1,1x1,1,992.081xx,302,302,85x1,1xxx,-992.302,302,85x1,1xx,302,302,302,85,302,302,85x1,1,302,85x1,1,1,992,081,081x302,302,85x1,1,992,302,302,302,302,85,302,302,85,302,85,1,1,1,1,1,992,302,302,85.1,1.1.1.992.302,302,85.1,1.992.302,302,85.1.1 (English) / rank
 
Normal rank
Property / summary: The project creates new installations for the production of solar and biomass energy, and its implementation will take place in the OSI area:7. Type of project:Construction and reconstruction of infrastruk. served for prod.en. coming from RES.Proj.responsible to the needs of stakeholders.The main problem that will be solved by real.pre. project.There will be department.Remedial.repair. 291pcs.3150W/300l,4-5persons.power:0,9167MW; 162pcs.4200W/400l,6+person,power:0,6804MW-assembly on facade or roof) and 35 biomass kilns (9pc.pellet20kW,power 0,18 MW; 1 pc.pellet24kW,power:0,024MW; In addition to the rest of the intervals, it is available in order of 0 % of the volume, the non-existence of the rest of the volume, and the rest of the time, in order of the non-fixing of the rest of the volumes.(714,1,8.302xxxx) in order.(85.1.1xxxxxx) in order.(714.1 % of the time, and the inconsistencies of the non-existence of the volume of the quantity.) in order of non-consumption of the quantity, the quantity of which is not available in order.(0.714-1xxxxxxxxxxxxx) in order of non-singlex., in the manner of the non-singlears, the non-singal of which, in the manner of non-existent time, is incomplete.(714,1,8.302,302,302,85.,1., and incl. 0.714-1,8.302,302,85,1.,1,1,1,1,992,081,302,302,302,302,302,85.1,1,992,302,302,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,714,1,1,8.302,85,1,1,1,992,081, and in 0. 714 % of the intervals of which, in order of 714 % of the intervals of the intervals of the intervals of the intervals, the quantity of non-existent, in order of 0.,714,1,8,302,85,1,1, and 8785 % of the quantity, in 0.-714,1,8xx,302,302,85,1,1,1,992,081,xxxxxx,--85,1,1,992,081,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,302,85,-1,1,1,-992.,-302,85,1,1, 992,081,1,992,081,-,-992.,-1.-992,081, and 20 % of the volumes of the Cost-Decorm.,-Net-Net-Net-Net-Net-,t, and the Cost. of the Cost., and the Cost., the Question of the Question of the Cost., and the Cost.,.,.,.,.,.,.,., the Cost.--714.,-Next.,-0.-714., the Cost.-R.-R.,-Red, inc.F.-714,1,8,302,302,85,1,1,1,992,081,-85,1,1,1,992,081,302,85.1,1,992,081xxxxxxxxt.,-85.1.1,992xxxxxt.,-8.302,85.1,1.992.,-992.081,-85.1.1,-992.-081.-85.1,1,-992.-992.081,-85.1,1,992.081xxx,-85.1 %,1xx,-1 % of the time available.,-992x-302,85x1x1,992.081,302,85x1x1x992x302,302,85.1.1.992xxxt-992.081,302,302-85.1.1.992.081xxxxxxxxxxxxxxxxxxxxxxxxxx-302-85.1x1xxxxxxxxxx)-714x302x85x1x1x1x1.1.1.992.081..992.302,302.85.1.1.992.302 % in 85.1.1 % of the size of the inc.-85.1 %, 1.1.1 % of the volume of the.1.1xxxxx, inc.---1.992.,302,302,302,85,1,1,992,081,302,85x1,1x1,1,992.081xx,302,302,85x1,1xxx,-992.302,302,85x1,1xx,302,302,302,85,302,302,85x1,1,302,85x1,1,1,992,081,081x302,302,85x1,1,992,302,302,302,302,85,302,302,85,302,85,1,1,1,1,1,992,302,302,85.1,1.1.1.992.302,302,85.1,1.992.302,302,85.1.1 (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:41, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Air protection and reduction of traditional energy use in the municipality of Wilkołacz
Project in Poland financed by DG Regio

    Statements

    0 references
    5,157,570.5 zloty
    0 references
    1,237,816.92 Euro
    13 January 2020
    0 references
    6,067,730.0 zloty
    0 references
    1,456,255.2 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 July 2017
    0 references
    31 December 2019
    0 references
    GMINA WILKOŁAZ
    0 references
    Projekt tworzy nowe instalacje do produkcji energii ze słońca i biomasy,a jego realizacja odbędzie się na obszarze OSI:7. Typ proj.:Budowa i przebudowa infrastruk.służącej do prod.en.pochodzącej z OZE.Proj.odpowiada na zdiagn.potrzeby interesariuszy.Głównym problemem który będzie rozwiązany przez real.przedm.proj.będą dział.naprawcze koncentr.się na obniżeniu szkodliwej emisji CO2 na obszarze obejmującym Gm.Wilkołaz przez poprawę efektywności energ.oraz zwiększ.udziału en.słonecznej w końcowym zużyciu en.cieplnej przez montaż 587instalacji solarnych próżniowych(134szt.-2100W/200l,dla 1-3os.,o łącznej mocy 0,2814MW; 291szt.3150W/300l,4-5os.moc:0,9167MW; 162szt.4200W/400l,6+os.,moc:0,6804MW-montaż na elewacji lub dachu) i 35 pieców na biomasę (9szt.pellet20kW,moc 0,18MW; 1 szt.pellet24kW,moc:0,024MW; 5szt.zagazowujące niepełnowart.drewno22kW,moc:0,11MW;20szt.spalające niepeł.ziarna zbóż20kW,moc:0,4MW.Real.wyłącznie w budynkach prywatnych.Moc instalacji w proj.wynosi:dla en.słon.1,8785MW dla en.biomasy 0,714MW Założenia proj.:-zastępowanie istniejącej produkcji en.z surowców kopalnych prod.z OZE-wdrażanie intelig.systemów zarządz. en.w oparciu o TIK (w tym pomiaru,obsługi i monitoringu wykorz.en.w kontekście ich skalowalności,elast.i niezależ.od dostawców)-uruchamia serwisy,za pośred.których użytkow.będą mogli dokon.transakcji on-line (zawieranie umów,odczyty liczników,pobieranie opłat,stan rozliczeń,uwagi i skargi,zapytania,dostępność dotych.i nowych usług-wpływa na real.celów o char.strateg.jako element szerzej zaplan.działań w których istotnym efektem jest kumulacja i koordynacja inwestycji,których łączna real.przez efekt skali pozwala uzyskać lepsze rezultaty przez wpisywanie się w PGN-zawiera rozw.gwar.trwałość proj.w zakresie dostaw paliwa lub en.(inst.kumulujące en.)-Efekt.koszt.budowy1jedn.wytw.en.cieplnej-8 302,85zł -Efek.koszt.1MW dod.zdolności wytw.en.-1 992 081zł.Na obsz.objętym real.proj.nie istnieje konieczność opracow.programów dot. ochrony powietrza (Polish)
    0 references
    The project creates new installations for the production of solar and biomass energy, and its implementation will take place in the OSI area:7. Type of project:Construction and reconstruction of infrastruk. served for prod.en. coming from RES.Proj.responsible to the needs of stakeholders.The main problem that will be solved by real.pre. project.There will be department.Remedial.repair. 291pcs.3150W/300l,4-5persons.power:0,9167MW; 162pcs.4200W/400l,6+person,power:0,6804MW-assembly on facade or roof) and 35 biomass kilns (9pc.pellet20kW,power 0,18 MW; 1 pc.pellet24kW,power:0,024MW; In addition to the rest of the intervals, it is available in order of 0 % of the volume, the non-existence of the rest of the volume, and the rest of the time, in order of the non-fixing of the rest of the volumes.(714,1,8.302xxxx) in order.(85.1.1xxxxxx) in order.(714.1 % of the time, and the inconsistencies of the non-existence of the volume of the quantity.) in order of non-consumption of the quantity, the quantity of which is not available in order.(0.714-1xxxxxxxxxxxxx) in order of non-singlex., in the manner of the non-singlears, the non-singal of which, in the manner of non-existent time, is incomplete.(714,1,8.302,302,302,85.,1., and incl. 0.714-1,8.302,302,85,1.,1,1,1,1,992,081,302,302,302,302,302,85.1,1,992,302,302,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,714,1,1,8.302,85,1,1,1,992,081, and in 0. 714 % of the intervals of which, in order of 714 % of the intervals of the intervals of the intervals of the intervals, the quantity of non-existent, in order of 0.,714,1,8,302,85,1,1, and 8785 % of the quantity, in 0.-714,1,8xx,302,302,85,1,1,1,992,081,xxxxxx,--85,1,1,992,081,081,302,85,1,1,1,992,081,302,85,1,1,1,992,081,302,302,85,-1,1,1,-992.,-302,85,1,1, 992,081,1,992,081,-,-992.,-1.-992,081, and 20 % of the volumes of the Cost-Decorm.,-Net-Net-Net-Net-Net-,t, and the Cost. of the Cost., and the Cost., the Question of the Question of the Cost., and the Cost.,.,.,.,.,.,.,., the Cost.--714.,-Next.,-0.-714., the Cost.-R.-R.,-Red, inc.F.-714,1,8,302,302,85,1,1,1,992,081,-85,1,1,1,992,081,302,85.1,1,992,081xxxxxxxxt.,-85.1.1,992xxxxxt.,-8.302,85.1,1.992.,-992.081,-85.1.1,-992.-081.-85.1,1,-992.-992.081,-85.1,1,992.081xxx,-85.1 %,1xx,-1 % of the time available.,-992x-302,85x1x1,992.081,302,85x1x1x992x302,302,85.1.1.992xxxt-992.081,302,302-85.1.1.992.081xxxxxxxxxxxxxxxxxxxxxxxxxx-302-85.1x1xxxxxxxxxx)-714x302x85x1x1x1x1.1.1.992.081..992.302,302.85.1.1.992.302 % in 85.1.1 % of the size of the inc.-85.1 %, 1.1.1 % of the volume of the.1.1xxxxx, inc.---1.992.,302,302,302,85,1,1,992,081,302,85x1,1x1,1,992.081xx,302,302,85x1,1xxx,-992.302,302,85x1,1xx,302,302,302,85,302,302,85x1,1,302,85x1,1,1,992,081,081x302,302,85x1,1,992,302,302,302,302,85,302,302,85,302,85,1,1,1,1,1,992,302,302,85.1,1.1.1.992.302,302,85.1,1.992.302,302,85.1.1 (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.01.00-06-0147/16
    0 references