CONSTRUCTION OF PUBLIC LIGHTING WITH ENERGY EFFICIENCY AND ENVIRONMENTAL EQUIPMENT IN THE COMMUNE OF SŁAWNO (Q102008): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): THE PROJECT CONSISTS OF BUILDING PUBLIC LIGHTING WITH ENERGY EFFICIENT AND ECOLOGICAL FACILITIES FOR THE FOLLOWING SECTIONS: • SZADKOWICE — ANTONSCKA: 17 POINTS OF LIGHT OF THE TYPE LED AND 2 ACTIVE CHARACTERS SUPPLIED FROM THE SOLAR MODULE• BRATMAIN: 29 LIGHT POINTS WITH LED/LED• PRYMPUSOV WILL: THE 33 LIGHT POINTS WITH THE LEDS COMBINED WILL HAVE 79 LIGHT POINTS WITH LED AND 2 ACTIVE CHARACTERS FROM THE PV MODULE (RES), THE PLANNED INVESTMEN...)
(‎Created claim: summary (P836): THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ON SECTIONS: • SZADKOWICE – ANTONIÓWKA: 17 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE CHARACTERS POWERED FROM THE PHOTOVOLTAIC MODULE • FRATERNAL STONES: 29 LIGHT POINTS WITH LED LUMINAIRES • PRIMITIVE WILL: 33 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 79 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PH...)
Property / summary
 
THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ON SECTIONS: • SZADKOWICE – ANTONIÓWKA: 17 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE CHARACTERS POWERED FROM THE PHOTOVOLTAIC MODULE • FRATERNAL STONES: 29 LIGHT POINTS WITH LED LUMINAIRES • PRIMITIVE WILL: 33 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 79 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). THE NECESSARY MEASURES TO BE IMPLEMENTED ARE: TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE TOWNS OF SZADKOWICE AND ANTONIÓWKA. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGES AND STONE. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGE OF PRYMUSOWA WILL. 4. PROMOTION OF THE PROJECT. 5. IT’S INVESTOR SUPERVISION. SPECIFIC TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSERS-BY, USING PUBLIC INFRASTRUCTURE AND TOURISTS VISITING THE MUNICIPALITY OF SŁAWNO (English)
Property / summary: THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ON SECTIONS: • SZADKOWICE – ANTONIÓWKA: 17 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE CHARACTERS POWERED FROM THE PHOTOVOLTAIC MODULE • FRATERNAL STONES: 29 LIGHT POINTS WITH LED LUMINAIRES • PRIMITIVE WILL: 33 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 79 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). THE NECESSARY MEASURES TO BE IMPLEMENTED ARE: TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE TOWNS OF SZADKOWICE AND ANTONIÓWKA. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGES AND STONE. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGE OF PRYMUSOWA WILL. 4. PROMOTION OF THE PROJECT. 5. IT’S INVESTOR SUPERVISION. SPECIFIC TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSERS-BY, USING PUBLIC INFRASTRUCTURE AND TOURISTS VISITING THE MUNICIPALITY OF SŁAWNO (English) / rank
 
Normal rank
Property / summary: THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ON SECTIONS: • SZADKOWICE – ANTONIÓWKA: 17 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE CHARACTERS POWERED FROM THE PHOTOVOLTAIC MODULE • FRATERNAL STONES: 29 LIGHT POINTS WITH LED LUMINAIRES • PRIMITIVE WILL: 33 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 79 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). THE NECESSARY MEASURES TO BE IMPLEMENTED ARE: TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE TOWNS OF SZADKOWICE AND ANTONIÓWKA. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGES AND STONE. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGE OF PRYMUSOWA WILL. 4. PROMOTION OF THE PROJECT. 5. IT’S INVESTOR SUPERVISION. SPECIFIC TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSERS-BY, USING PUBLIC INFRASTRUCTURE AND TOURISTS VISITING THE MUNICIPALITY OF SŁAWNO (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:07, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF PUBLIC LIGHTING WITH ENERGY EFFICIENCY AND ENVIRONMENTAL EQUIPMENT IN THE COMMUNE OF SŁAWNO
Project in Poland financed by DG Regio

    Statements

    0 references
    383,214.94 zloty
    0 references
    91,971.59 Euro
    13 January 2020
    0 references
    451,372.13 zloty
    0 references
    108,329.31 Euro
    13 January 2020
    0 references
    84.9 percent
    0 references
    1 March 2017
    0 references
    30 November 2017
    0 references
    GMINA SŁAWNO
    0 references
    0 references

    51°23'31.2"N, 20°8'23.6"E
    0 references
    PROJEKT POLEGA NA BUDOWIE OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH NA ODCINKACH: • SZADKOWICE – ANTONIÓWKA: 17 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED I 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO • BRATKÓW-KAMIEŃ: 29 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED • PRYMUSOWA WOLA: 33 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ŁĄCZNIE WYBUDOWANE ZOSTANĄ 79 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ORAZ 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO (OZE) PLANOWANA INWESTYCJA JEST ELEMENTEM SZERSZEGO PROJEKTU INFRASTRUKTURALNEGO, RÓWNOLEGLE REALIZOWANEGO I FINANSOWANEGO PRZEZ BENEFICJENTA – WIĘCEJ W PKT. 6.6 WOD. OBECNE WYSOKIE KOSZTY OŚWIETLANIA MIEJSC UŻYTECZNOŚCI PUBLICZNEJ: • GENERUJĄ WYSOKIE KOSZTY OŚWIETLANIA • ZWIĘKSZAJĄ ZANIECZYSZCZANIE ŚRODOWISKA • WYSOKIE KOSZTY OŚWIETLANIA POWODUJĄ, IŻ NIE WZRASTA PROPORCJONALNIE DO POTRZEB LICZBA NOWYCH INWESTYCJI • ZWIĄZANE SĄ Z NIEWYKORZYSTANIEM SYSTEMÓW ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (OZE). NIEZBĘDNE DZIAŁANIA JAKIE NALEŻY WDROŻYĆ TO: ZADANIA: 1. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH W MIEJSCOWOŚCIACH SZADKOWICE I ANTONIÓWKA. 2. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCIACH BRATKÓW I KAMIEŃ. 3. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI PRYMUSOWA WOLA. 4. PROMOCJA PROJEKTU. 5. NADZÓR INWESTORSKI. SZCZEGÓŁOWE WYMAGANIA TECHNICZ. ZNAJDUJĄ SIĘ W SW ROZ. 4 ORAZ W ZAŁ. 3. CELE: DZIĘKI REALIZACJI PROJEKTU SPEŁNIONY ZOSTANIE CEL GŁÓWNY PROJEKTU TJ. ZWIĘKSZANIE OSZCZĘDNOŚCI ENERGII ORAZ POPRAWA CZYSTOŚCI POWIETRZA W GMINIE SŁAWNO. GRUPA DOCELOWA: BEZPOŚREDNIA: MIESZKAŃCY GMINY SŁAWNO, OSOBY PRZEJEZDNE, KORZYSTAJĄCE Z INFRASTRUKTURY PUBLICZNEJ ORAZ TURYŚCI ODWIEDZAJĄCY GMINĘ SŁAWNO (Polish)
    0 references
    THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ON SECTIONS: • SZADKOWICE – ANTONIÓWKA: 17 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE CHARACTERS POWERED FROM THE PHOTOVOLTAIC MODULE • FRATERNAL STONES: 29 LIGHT POINTS WITH LED LUMINAIRES • PRIMITIVE WILL: 33 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 79 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). THE NECESSARY MEASURES TO BE IMPLEMENTED ARE: TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE TOWNS OF SZADKOWICE AND ANTONIÓWKA. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGES AND STONE. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGE OF PRYMUSOWA WILL. 4. PROMOTION OF THE PROJECT. 5. IT’S INVESTOR SUPERVISION. SPECIFIC TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSERS-BY, USING PUBLIC INFRASTRUCTURE AND TOURISTS VISITING THE MUNICIPALITY OF SŁAWNO (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.03.02-10-0011/16
    0 references