THERMO-MODERNISATION OF THE POZKALNO BUILDING — SERVICES IN OMUNACACHS (Q101920): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): THE PROJECT INVOLVES DEEP THERMAL RENOVATION OF THE PUBLIC BUILDING IN THE MUNICIPALITY OF GOMUNICE. THE PROJECT CONCERNS A MUNICIPAL HOUSING AND SERVICES BUILDING. THE SITE IS LOCATED IN THE MUNICIPALITY OF GOMUNICE AT ULICA WITOSA 1. THE BUILDING HOUSES HOUSING (AND 2ND FLOOR) AND PROVIDES FOR THE CREATION OF A MUNICIPAL CRÈCHE. DUE TO THEIR INTENDED USE, IT PLAYS A VERY IMPORTANT ROLE IN THE COMMUNITY’S LIVES. THE FACILITY IS DESIGNED TO WA...) |
(Created claim: summary (P836): THE PROJECT CONSISTS OF A DEEP THERMAL MODERNISATION OF THE PUBLIC UTILITY BUILDING IN GOMUNICE COMMUNE. THE SCOPE OF THE PROJECT CONCERNS A MUNICIPAL RESIDENTIAL AND SERVICE BUILDING. IT IS LOCATED IN GOMUNICE ON 1 WITOSA STREET. IN THE BUILDING THERE ARE RESIDENTIAL PREMISES (AND SECOND FLOOR) AND THE CREATION OF A COMMUNAL NURSERY (GROUND FLOOR). BECAUSE OF ITS DESTINY, IT PLAYS A VERY IMPORTANT ROLE IN THE LIFE OF THE LOCAL COMMUNITY. THE BU...) |
||||||||||||||
Property / summary | |||||||||||||||
THE PROJECT CONSISTS OF A DEEP THERMAL MODERNISATION OF THE PUBLIC UTILITY BUILDING IN GOMUNICE COMMUNE. THE SCOPE OF THE PROJECT CONCERNS A MUNICIPAL RESIDENTIAL AND SERVICE BUILDING. IT IS LOCATED IN GOMUNICE ON 1 WITOSA STREET. IN THE BUILDING THERE ARE RESIDENTIAL PREMISES (AND SECOND FLOOR) AND THE CREATION OF A COMMUNAL NURSERY (GROUND FLOOR). BECAUSE OF ITS DESTINY, IT PLAYS A VERY IMPORTANT ROLE IN THE LIFE OF THE LOCAL COMMUNITY. THE BUILDING PLANS TO WARM THE OUTER WALLS, THE CEILING OF THE LAST FLOOR AND THE REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. THE AIM OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY. WITH THE IMPLEMENTATION OF THE INVESTMENT, THE ANNUAL REDUCTION IN ENERGY DEMAND WILL AMOUNT TO 70.1 % AS A RESULT OF THE ENERGY AUDIT CARRIED OUT. THE BUILDING WILL BE USED BY 3 CARERS FOR CHILDREN UNDER THE AGE OF 3, AND THE ESTIMATED NUMBER OF PLACES OF CARE IS 18 CHILDREN. IN ADDITION, THE BUILDING HAS A POPULATION OF 9, WITH A MAXIMUM OF 15 INHABITANTS. DUE TO THE NATURE OF THE BUILDING, THE TARGET GROUP WILL CONSIST OF 5 876 INHABITANTS OF THE MUNICIPALITY. THE PROJECT WILL CONSIST OF THE FOLLOWING TASKS: 1. PREPARATION OF THE PROJECT – AS PART OF THE TASK OF THE PROJECT UNIT PREPARED TECHNICAL DOCUMENTATION 2. THERMAL MODERNISATION OF THE RESIDENTIAL AND SERVICE BUILDING IN GOMUNICACH – AS PART OF THE TASK ARE PLANNED THERMAL MODERNISATION WORKS INCLUDING: WARMING OF THE OUTER WALLS AND THE CEILING OF THE LAST FLOOR AND REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. 3. PROJECT MANAGEMENT AND ITS OPERATION – INVESTOR SUPERVISION AND PROJECT PROMOTION WILL BE IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLES OF UNIVERSAL DESIGN, IN ACCORDANCE WITH “GUIDELINES FOR THE IMPLEMENTATION OF THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES AND THE PRINCIPLE OF EQUAL OPPORTUNITIES FOR WOMEN AND MEN WITHIN THE FRAMEWORK OF EU FUNDS FOR THE PERIOD 2014-2020”. THE TECHNICAL SOLUTIONS PLANNED FOR USE IN THE PROJECT WILL BE USEFUL FOR ALL WITHOUT THE NEED FOR ADAPTATION OR SPECIALISED PR (English) | |||||||||||||||
Property / summary: THE PROJECT CONSISTS OF A DEEP THERMAL MODERNISATION OF THE PUBLIC UTILITY BUILDING IN GOMUNICE COMMUNE. THE SCOPE OF THE PROJECT CONCERNS A MUNICIPAL RESIDENTIAL AND SERVICE BUILDING. IT IS LOCATED IN GOMUNICE ON 1 WITOSA STREET. IN THE BUILDING THERE ARE RESIDENTIAL PREMISES (AND SECOND FLOOR) AND THE CREATION OF A COMMUNAL NURSERY (GROUND FLOOR). BECAUSE OF ITS DESTINY, IT PLAYS A VERY IMPORTANT ROLE IN THE LIFE OF THE LOCAL COMMUNITY. THE BUILDING PLANS TO WARM THE OUTER WALLS, THE CEILING OF THE LAST FLOOR AND THE REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. THE AIM OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY. WITH THE IMPLEMENTATION OF THE INVESTMENT, THE ANNUAL REDUCTION IN ENERGY DEMAND WILL AMOUNT TO 70.1 % AS A RESULT OF THE ENERGY AUDIT CARRIED OUT. THE BUILDING WILL BE USED BY 3 CARERS FOR CHILDREN UNDER THE AGE OF 3, AND THE ESTIMATED NUMBER OF PLACES OF CARE IS 18 CHILDREN. IN ADDITION, THE BUILDING HAS A POPULATION OF 9, WITH A MAXIMUM OF 15 INHABITANTS. DUE TO THE NATURE OF THE BUILDING, THE TARGET GROUP WILL CONSIST OF 5 876 INHABITANTS OF THE MUNICIPALITY. THE PROJECT WILL CONSIST OF THE FOLLOWING TASKS: 1. PREPARATION OF THE PROJECT – AS PART OF THE TASK OF THE PROJECT UNIT PREPARED TECHNICAL DOCUMENTATION 2. THERMAL MODERNISATION OF THE RESIDENTIAL AND SERVICE BUILDING IN GOMUNICACH – AS PART OF THE TASK ARE PLANNED THERMAL MODERNISATION WORKS INCLUDING: WARMING OF THE OUTER WALLS AND THE CEILING OF THE LAST FLOOR AND REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. 3. PROJECT MANAGEMENT AND ITS OPERATION – INVESTOR SUPERVISION AND PROJECT PROMOTION WILL BE IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLES OF UNIVERSAL DESIGN, IN ACCORDANCE WITH “GUIDELINES FOR THE IMPLEMENTATION OF THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES AND THE PRINCIPLE OF EQUAL OPPORTUNITIES FOR WOMEN AND MEN WITHIN THE FRAMEWORK OF EU FUNDS FOR THE PERIOD 2014-2020”. THE TECHNICAL SOLUTIONS PLANNED FOR USE IN THE PROJECT WILL BE USEFUL FOR ALL WITHOUT THE NEED FOR ADAPTATION OR SPECIALISED PR (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: THE PROJECT CONSISTS OF A DEEP THERMAL MODERNISATION OF THE PUBLIC UTILITY BUILDING IN GOMUNICE COMMUNE. THE SCOPE OF THE PROJECT CONCERNS A MUNICIPAL RESIDENTIAL AND SERVICE BUILDING. IT IS LOCATED IN GOMUNICE ON 1 WITOSA STREET. IN THE BUILDING THERE ARE RESIDENTIAL PREMISES (AND SECOND FLOOR) AND THE CREATION OF A COMMUNAL NURSERY (GROUND FLOOR). BECAUSE OF ITS DESTINY, IT PLAYS A VERY IMPORTANT ROLE IN THE LIFE OF THE LOCAL COMMUNITY. THE BUILDING PLANS TO WARM THE OUTER WALLS, THE CEILING OF THE LAST FLOOR AND THE REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. THE AIM OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY. WITH THE IMPLEMENTATION OF THE INVESTMENT, THE ANNUAL REDUCTION IN ENERGY DEMAND WILL AMOUNT TO 70.1 % AS A RESULT OF THE ENERGY AUDIT CARRIED OUT. THE BUILDING WILL BE USED BY 3 CARERS FOR CHILDREN UNDER THE AGE OF 3, AND THE ESTIMATED NUMBER OF PLACES OF CARE IS 18 CHILDREN. IN ADDITION, THE BUILDING HAS A POPULATION OF 9, WITH A MAXIMUM OF 15 INHABITANTS. DUE TO THE NATURE OF THE BUILDING, THE TARGET GROUP WILL CONSIST OF 5 876 INHABITANTS OF THE MUNICIPALITY. THE PROJECT WILL CONSIST OF THE FOLLOWING TASKS: 1. PREPARATION OF THE PROJECT – AS PART OF THE TASK OF THE PROJECT UNIT PREPARED TECHNICAL DOCUMENTATION 2. THERMAL MODERNISATION OF THE RESIDENTIAL AND SERVICE BUILDING IN GOMUNICACH – AS PART OF THE TASK ARE PLANNED THERMAL MODERNISATION WORKS INCLUDING: WARMING OF THE OUTER WALLS AND THE CEILING OF THE LAST FLOOR AND REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. 3. PROJECT MANAGEMENT AND ITS OPERATION – INVESTOR SUPERVISION AND PROJECT PROMOTION WILL BE IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLES OF UNIVERSAL DESIGN, IN ACCORDANCE WITH “GUIDELINES FOR THE IMPLEMENTATION OF THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES AND THE PRINCIPLE OF EQUAL OPPORTUNITIES FOR WOMEN AND MEN WITHIN THE FRAMEWORK OF EU FUNDS FOR THE PERIOD 2014-2020”. THE TECHNICAL SOLUTIONS PLANNED FOR USE IN THE PROJECT WILL BE USEFUL FOR ALL WITHOUT THE NEED FOR ADAPTATION OR SPECIALISED PR (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 15:53, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMO-MODERNISATION OF THE POZKALNO BUILDING — SERVICES IN OMUNACACHS |
Project in Poland financed by DG Regio |
Statements
126,967.76 zloty
0 references
149,373.84 zloty
0 references
85.0 percent
0 references
15 November 2017
0 references
31 December 2018
0 references
GMINA GOMUNICE
0 references
PROJEKT POLEGA NA GŁĘBOKIEJ TERMOMODERNIZACJI BUDYNKU UŻYTECZNOŚCI PUBLICZNEJ NA TERENIE GMINY GOMUNICE. ZAKRES PRZEDSIĘWZIĘCIA DOTYCZY KOMUNALNEGO BUDYNKU MIESZKALNO-USŁUGOWEGO. OBIEKT JEST ZLOKALIZOWANY W MIEJSCOWOŚCI GOMUNICE PRZY ULICY WITOSA 1. W BUDYNKU ZNAJDUJĄ SIĘ LOKALE MIESZKALNE (I I II PIĘTRO) ORAZ PRZEWIDZIANO UTWORZENIE GMINNEGO ŻŁOBKA(PARTER). ZE WZGLĘDU NA SWOJE PRZEZNACZENIE ODGRYWA ON BARDZO WAŻNA ROLĘ W ŻYCIU LOKALNEJ SPOŁECZNOŚCI. W OBIEKCIE PLANUJE SIĘ OCIEPLENIE ŚCIAN ZEWNĘTRZNYCH, STROPU OSTATNIEJ KONDYGNACJI ORAZ WYMIANĘ OKIEN W PIWNICY BUDYNKU. CELEM PROJEKTU JEST POPRAWA EFEKTYWNOŚCI ENERGETYCZNEJ. DZIĘKI REALIZACJI INWESTYCJI ROCZNE ZMNIEJSZENIE ZAPOTRZEBOWANIA NA ENERGIĘ WYNIESIE 70,1% CO WYNIKA Z PRZEPROWADZONEGO AUDYTU ENERGETYCZNEGO. Z BUDYNKU KORZYSTAĆ BĘDZIE 3 OPIEKUNÓW DZIECI DO LAT 3, A PRZEWIDYWANA ILOŚĆ MIEJSC OPIEKI TO 18 DZIECI. PONADTO BUDYNEK ZAMIESZKUJE 9 OSÓB, A MAKSYMALNIE MOŻE ZAMIESZKIWAĆ 15 OSÓB. ZE WZGLĘDU NA CHARAKTER BUDYNKU GRUPĄ DOCELOWĄ BĘDĄ STANOWIĆ WSZYSCY MIESZKAŃCY GMINY W ILOŚCI 5 876 OSÓB. NA PROJEKT SKŁADAĆ SIĘ BĘDĄ NASTĘPUJĄCE ZADANIA: 1. PRZYGOTOWANIE PROJEKTU - W RAMACH ZADANIA PRZEZ JEDNOSTKĘ PROJEKTOWĄ PRZYGOTOWANA ZOSTAŁA DOKUMENTACJA TECHNICZNA 2. TERMOMODERNIZACJA BUDYNKU MIESZKALNO-USŁUGOWEGO W GOMUNICACH - W RAMACH ZADANIA PLANOWANE SĄ PRACE TERMOMODERNIZACYJNE OBEJMUJĄCE: OCIEPLENIE ŚCIAN ZEWNĘTRZNYCH I STROPU OSTATNIEJ KONDYGNACJI ORAZ WYMIANĘ OKIEN W PIWNICY BUDYNKU. 3. ZARZĄDZANIE PROJEKTEM I JEGO OBSŁUGA - NADZÓR INWESTORSKI ORAZ PROMOCJA PROJEKTU PROJEKT BĘDZIE REALIZOWANY ZGODNIE Z ZASADAMI UNIWERSALNEGO PROJEKTOWANIA, ZGODNIE Z „WYTYCZNYMI W ZAKRESIE REALIZACJI ZASADY RÓWNOŚCI SZANS I NIEDYSKRYMINACJI, W TYM DOSTĘPNOŚCI DLA OSÓB Z NIEPEŁNOSPRAWNOŚCIAMI ORAZ ZASADY RÓWNOŚCI SZANS KOBIET I MĘŻCZYZN W RAMACH FUNDUSZY UNIJNYCH NA LATA 2014-2020”. PLANOWANE DO ZASTOSOWANIA W PROJEKCIE ROZWIĄZANIA TECHNICZNE BĘDĄ UŻYTECZNE DLA WSZYSTKICH BEZ POTRZEBY ADAPTACJI LUB SPECJALISTYCZNEGO PR (Polish)
0 references
THE PROJECT CONSISTS OF A DEEP THERMAL MODERNISATION OF THE PUBLIC UTILITY BUILDING IN GOMUNICE COMMUNE. THE SCOPE OF THE PROJECT CONCERNS A MUNICIPAL RESIDENTIAL AND SERVICE BUILDING. IT IS LOCATED IN GOMUNICE ON 1 WITOSA STREET. IN THE BUILDING THERE ARE RESIDENTIAL PREMISES (AND SECOND FLOOR) AND THE CREATION OF A COMMUNAL NURSERY (GROUND FLOOR). BECAUSE OF ITS DESTINY, IT PLAYS A VERY IMPORTANT ROLE IN THE LIFE OF THE LOCAL COMMUNITY. THE BUILDING PLANS TO WARM THE OUTER WALLS, THE CEILING OF THE LAST FLOOR AND THE REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. THE AIM OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY. WITH THE IMPLEMENTATION OF THE INVESTMENT, THE ANNUAL REDUCTION IN ENERGY DEMAND WILL AMOUNT TO 70.1 % AS A RESULT OF THE ENERGY AUDIT CARRIED OUT. THE BUILDING WILL BE USED BY 3 CARERS FOR CHILDREN UNDER THE AGE OF 3, AND THE ESTIMATED NUMBER OF PLACES OF CARE IS 18 CHILDREN. IN ADDITION, THE BUILDING HAS A POPULATION OF 9, WITH A MAXIMUM OF 15 INHABITANTS. DUE TO THE NATURE OF THE BUILDING, THE TARGET GROUP WILL CONSIST OF 5 876 INHABITANTS OF THE MUNICIPALITY. THE PROJECT WILL CONSIST OF THE FOLLOWING TASKS: 1. PREPARATION OF THE PROJECT – AS PART OF THE TASK OF THE PROJECT UNIT PREPARED TECHNICAL DOCUMENTATION 2. THERMAL MODERNISATION OF THE RESIDENTIAL AND SERVICE BUILDING IN GOMUNICACH – AS PART OF THE TASK ARE PLANNED THERMAL MODERNISATION WORKS INCLUDING: WARMING OF THE OUTER WALLS AND THE CEILING OF THE LAST FLOOR AND REPLACEMENT OF THE WINDOWS IN THE BASEMENT OF THE BUILDING. 3. PROJECT MANAGEMENT AND ITS OPERATION – INVESTOR SUPERVISION AND PROJECT PROMOTION WILL BE IMPLEMENTED IN ACCORDANCE WITH THE PRINCIPLES OF UNIVERSAL DESIGN, IN ACCORDANCE WITH “GUIDELINES FOR THE IMPLEMENTATION OF THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PEOPLE WITH DISABILITIES AND THE PRINCIPLE OF EQUAL OPPORTUNITIES FOR WOMEN AND MEN WITHIN THE FRAMEWORK OF EU FUNDS FOR THE PERIOD 2014-2020”. THE TECHNICAL SOLUTIONS PLANNED FOR USE IN THE PROJECT WILL BE USEFUL FOR ALL WITHOUT THE NEED FOR ADAPTATION OR SPECIALISED PR (English)
17 October 2020
0 references
Identifiers
RPLD.04.02.02-10-0019/17
0 references