The extension of the provincial road No 710 from the Konstantyna Łódzki to Lutskiersk, stage I (Q101695): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The scope of this project, which consists of extending the regional road from km 10 + 036 to km 10 + 543, obejmuje:rozbudowę provincial roads, extension of the intersection of DW 710 of DP No 3302E (ul. Klonim) andDGNr108210E (ul.Bgreece) in Konst.Łódzki to the intersection of the roundabout ‘Small’, the extension of the district road Nr3302E and of the municipality of Nr108210E, the demolition and construction of pavements, the demolition and...)
(‎Created claim: summary (P836): The scope of the project consisting of the extension of the provincial road No.710 on the section from km 10+ 036 to km 10+ 543 includes: extension of the provincial road, extension of the junction DW 710 with DP No 3302E (ul. Maple) iDGNr108210E(ul.Bechcice) inKonst.Łódzkim at the junction of the roundabout“small”, extension of the district roadNr3302E and the communeNr108210E, demolition and construction of pavements, demolition and constructi...)
Property / summary
 
The scope of the project consisting of the extension of the provincial road No.710 on the section from km 10+ 036 to km 10+ 543 includes: extension of the provincial road, extension of the junction DW 710 with DP No 3302E (ul. Maple) iDGNr108210E(ul.Bechcice) inKonst.Łódzkim at the junction of the roundabout“small”, extension of the district roadNr3302E and the communeNr108210E, demolition and construction of pavements, demolition and construction of the roadway, construction of the bicycle path with the admission of pedestrian traffic, the construction of the scope of the bus bay, construction of the grooving platform, construction of the single-stage track and reconstruction of the track. The implementation of the expansion of DW will result in a decisive improvement in the free movement of pedestrians and people with disabilities by separating pedestrian traffic from the car (walks), vertical and horizontal signs of roads, bus bay, tram platform. Expenditure related to the reconstruction of the site’s armament network, which conflicts with the investment for the entire Project, is included in the cost category Reconstruction of the technical infrastructure conflicting with the investment. The aim of the project is to: improving the technical conditions, capacity and safety of road traffic (transit and local) and pedestrians, adapting the load capacity of the road to the requirements of existing regulations and improving environmental conditions.The implementation of the investment will serve residents who use it for professional or recreational purposes, as well as those coming from outside the region for tourist or business purposes. The road users are also carriers, professional drivers, entrepreneurs, tourists passing through DW 710. (English)
Property / summary: The scope of the project consisting of the extension of the provincial road No.710 on the section from km 10+ 036 to km 10+ 543 includes: extension of the provincial road, extension of the junction DW 710 with DP No 3302E (ul. Maple) iDGNr108210E(ul.Bechcice) inKonst.Łódzkim at the junction of the roundabout“small”, extension of the district roadNr3302E and the communeNr108210E, demolition and construction of pavements, demolition and construction of the roadway, construction of the bicycle path with the admission of pedestrian traffic, the construction of the scope of the bus bay, construction of the grooving platform, construction of the single-stage track and reconstruction of the track. The implementation of the expansion of DW will result in a decisive improvement in the free movement of pedestrians and people with disabilities by separating pedestrian traffic from the car (walks), vertical and horizontal signs of roads, bus bay, tram platform. Expenditure related to the reconstruction of the site’s armament network, which conflicts with the investment for the entire Project, is included in the cost category Reconstruction of the technical infrastructure conflicting with the investment. The aim of the project is to: improving the technical conditions, capacity and safety of road traffic (transit and local) and pedestrians, adapting the load capacity of the road to the requirements of existing regulations and improving environmental conditions.The implementation of the investment will serve residents who use it for professional or recreational purposes, as well as those coming from outside the region for tourist or business purposes. The road users are also carriers, professional drivers, entrepreneurs, tourists passing through DW 710. (English) / rank
 
Normal rank
Property / summary: The scope of the project consisting of the extension of the provincial road No.710 on the section from km 10+ 036 to km 10+ 543 includes: extension of the provincial road, extension of the junction DW 710 with DP No 3302E (ul. Maple) iDGNr108210E(ul.Bechcice) inKonst.Łódzkim at the junction of the roundabout“small”, extension of the district roadNr3302E and the communeNr108210E, demolition and construction of pavements, demolition and construction of the roadway, construction of the bicycle path with the admission of pedestrian traffic, the construction of the scope of the bus bay, construction of the grooving platform, construction of the single-stage track and reconstruction of the track. The implementation of the expansion of DW will result in a decisive improvement in the free movement of pedestrians and people with disabilities by separating pedestrian traffic from the car (walks), vertical and horizontal signs of roads, bus bay, tram platform. Expenditure related to the reconstruction of the site’s armament network, which conflicts with the investment for the entire Project, is included in the cost category Reconstruction of the technical infrastructure conflicting with the investment. The aim of the project is to: improving the technical conditions, capacity and safety of road traffic (transit and local) and pedestrians, adapting the load capacity of the road to the requirements of existing regulations and improving environmental conditions.The implementation of the investment will serve residents who use it for professional or recreational purposes, as well as those coming from outside the region for tourist or business purposes. The road users are also carriers, professional drivers, entrepreneurs, tourists passing through DW 710. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:13, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The extension of the provincial road No 710 from the Konstantyna Łódzki to Lutskiersk, stage I
Project in Poland financed by DG Regio

    Statements

    0 references
    8,912,217.41 zloty
    0 references
    2,138,932.18 Euro
    13 January 2020
    0 references
    10,484,961.66 zloty
    0 references
    2,516,390.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 June 2019
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO ŁÓDZKIE
    0 references
    0 references

    51°45'25.9"N, 19°18'29.5"E
    0 references
    Zakres przedmiotowego Projektu polegającego na rozbudowie drogi wojewódzkiejNr710na odcinku od km 10+036 do km 10+543, obejmuje:rozbudowę drogi wojewódzkiej,rozbudowę skrzyżowania DW 710 z DP Nr 3302E (ul. Klonową) iDGNr108210E(ul.Bechcice) wKonst.Łódzkim na skrzyżowanie typu rondo"małe",rozbudowa drogi powiatowejNr3302E i gminnejNr108210E,rozbiórkę i budowę chodników,rozbiórkę i budowę zjazdów,budowę ścieżki rowerowej z dopuszczeniem ruchu pieszych,budowę zatoki autobusowej,budowę peronu tramwajowego,odcinkową przebudowę torowiska linii tramwajowej jednotorowej,likwidację, budowę i przebudowę rowów otwartych,budowę kanalizacji deszczowej,rozbiórkę przepustu,rozbudowę oświetlenia drogowego, budowę przyłączy do sygnalizacji świetlnej,budowę sygnalizacji świetlnej wraz z przyłączeniem do sieci energetycznej,przebudowę sieci elektroenerget., teletech., wodociągowej i światłowodowej.Uszczegółowienie zakresu projekzakresu projektu znajduje się w studium wykonalności. Realizacja rozbudowy DWspowoduje zdecydowaną poprawę bezp. ruchu pieszych i osób niepełnosprawnych poprzez odseparowanie ruchu pieszego od samochodowego (chodniki), oznakowanie pionowe i poziome drogi, zatoka autobusowa, peron tramwajowy. Wydatki związane z przebudową sieci uzbrojenia terenu kolidującą z inwestycją dla całego Projektu, ujęte są w kategorii kosztów Przebudowa infrastruktury technicznej kolidującej z inwestycją. Celem realizacji Projektu jest: poprawa warunków technicznych, przepustowości i bezpieczeństwa ruchu kołowego (tranzytowego i lokalnego) i pieszego, dostosowanie nośności drogi do wymagań obowiązujących przepisów oraz poprawa warunków ekologicznych.Realizacja inwestycji służyć będzie mieszkańcom, którzy w celach zawodowych lub rekreacyjnych korzystają z niej, jak i osobom, przybywającym spoza regionu w celach turystycznych bądź biznesowych. Użytkownikami drogi są także przewoźnicy, kierowcy zawodowi, przedsiębiorcy, turyści przejeżdżający DW 710. (Polish)
    0 references
    The scope of the project consisting of the extension of the provincial road No.710 on the section from km 10+ 036 to km 10+ 543 includes: extension of the provincial road, extension of the junction DW 710 with DP No 3302E (ul. Maple) iDGNr108210E(ul.Bechcice) inKonst.Łódzkim at the junction of the roundabout“small”, extension of the district roadNr3302E and the communeNr108210E, demolition and construction of pavements, demolition and construction of the roadway, construction of the bicycle path with the admission of pedestrian traffic, the construction of the scope of the bus bay, construction of the grooving platform, construction of the single-stage track and reconstruction of the track. The implementation of the expansion of DW will result in a decisive improvement in the free movement of pedestrians and people with disabilities by separating pedestrian traffic from the car (walks), vertical and horizontal signs of roads, bus bay, tram platform. Expenditure related to the reconstruction of the site’s armament network, which conflicts with the investment for the entire Project, is included in the cost category Reconstruction of the technical infrastructure conflicting with the investment. The aim of the project is to: improving the technical conditions, capacity and safety of road traffic (transit and local) and pedestrians, adapting the load capacity of the road to the requirements of existing regulations and improving environmental conditions.The implementation of the investment will serve residents who use it for professional or recreational purposes, as well as those coming from outside the region for tourist or business purposes. The road users are also carriers, professional drivers, entrepreneurs, tourists passing through DW 710. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.03.02.01-10-0003/19
    0 references