Improvement of the water and wastewater management system in the agglomeration of Bytom Odra (Q100393): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): In order to support water and wastewater management. The purpose of the document is the reconstruction of the wastewater treatment plant in Bytomiu Oderz. renovation of the socialist building and technical building; the decommissioning of existing waste facilities, including the dismantling of the costume, the spiced sieve, the dismantling of 4 sediment liners, the catchment area of the feeder waste water; construction of a sewerage network in...) |
(Created claim: summary (P836): The project is based on the implementation of activities supporting water and sewage management. The subject of the project is the reconstruction of the sewage treatment plant in Bytom. renovation of the building social. and techn.; liquidation of existing technical objects, including dismantling of the basket grate, spiral sieve, dismantling of 4 plots of sludge, sinks of transported sewage; construction of sanitary sewage system in district st...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is based on the implementation of activities supporting water and sewage management. The subject of the project is the reconstruction of the sewage treatment plant in Bytom. renovation of the building social. and techn.; liquidation of existing technical objects, including dismantling of the basket grate, spiral sieve, dismantling of 4 plots of sludge, sinks of transported sewage; construction of sanitary sewage system in district street. Wheat and Żytnia in m. Bytom Odrz. on a stretch of 877 m; construction of a water supply network. in district St. Wheat and Life in M. Bytom Odrz. d. 543.29 m and the construction of photovoltaic micro-installations in Tarnów Bycki. Target: Residents of the Bytom Agglomeration. Residents of the municipality of Bytom Odrz. and Pow. The New Caledonia Municipality of Bytom. The aim of the project is to improve access to good quality infrastrukt. water and sewage in the area of Bytom Municipality odrz. Zdefin. target depth and objectives detail. Deal with define problems as a result of problem analysis. For the purposes of detail., closely related to the target, include: Improvement of access of residents of the Agglomeration Bytom Odrz. to infrastrukt. water supply, by building 543.29 m of water supply. Improving access to the people of Aglom. Bytom Odrz. do infrastrukt. sewage, through modernisation of sewage treatment plant and construction of 877 m sanitary sewage system. Increase the RLM numbers connected to the network in Aglom. Bytom Odrz. o31 RLM Product Indicators: The sewer net. sanit. (km) – 0,877 Dc. of construction. Canaliz. sanit. (km) – 0,877 Long construction of the water supply network. (km) – 0, 5432 L. reconstruction of municipal waste water treatment plants (pieces) – 1 L. repair of municipal waste water treatment plants (pieces) – 1 Results indicators: L. additive. pers. benefit from improved waste water treatment (CI 19) (RLM)-31; L. additive for improved water supply (CI 18) (persons) – 35; Projections. l. pers. benefit from improved waste water treatment (RLM) – 4469 Improved waste water cargo volume (RLM) – 4469 Employment growth in supported entities (other than by (English) | |||||||||||||||
Property / summary: The project is based on the implementation of activities supporting water and sewage management. The subject of the project is the reconstruction of the sewage treatment plant in Bytom. renovation of the building social. and techn.; liquidation of existing technical objects, including dismantling of the basket grate, spiral sieve, dismantling of 4 plots of sludge, sinks of transported sewage; construction of sanitary sewage system in district street. Wheat and Żytnia in m. Bytom Odrz. on a stretch of 877 m; construction of a water supply network. in district St. Wheat and Life in M. Bytom Odrz. d. 543.29 m and the construction of photovoltaic micro-installations in Tarnów Bycki. Target: Residents of the Bytom Agglomeration. Residents of the municipality of Bytom Odrz. and Pow. The New Caledonia Municipality of Bytom. The aim of the project is to improve access to good quality infrastrukt. water and sewage in the area of Bytom Municipality odrz. Zdefin. target depth and objectives detail. Deal with define problems as a result of problem analysis. For the purposes of detail., closely related to the target, include: Improvement of access of residents of the Agglomeration Bytom Odrz. to infrastrukt. water supply, by building 543.29 m of water supply. Improving access to the people of Aglom. Bytom Odrz. do infrastrukt. sewage, through modernisation of sewage treatment plant and construction of 877 m sanitary sewage system. Increase the RLM numbers connected to the network in Aglom. Bytom Odrz. o31 RLM Product Indicators: The sewer net. sanit. (km) – 0,877 Dc. of construction. Canaliz. sanit. (km) – 0,877 Long construction of the water supply network. (km) – 0, 5432 L. reconstruction of municipal waste water treatment plants (pieces) – 1 L. repair of municipal waste water treatment plants (pieces) – 1 Results indicators: L. additive. pers. benefit from improved waste water treatment (CI 19) (RLM)-31; L. additive for improved water supply (CI 18) (persons) – 35; Projections. l. pers. benefit from improved waste water treatment (RLM) – 4469 Improved waste water cargo volume (RLM) – 4469 Employment growth in supported entities (other than by (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is based on the implementation of activities supporting water and sewage management. The subject of the project is the reconstruction of the sewage treatment plant in Bytom. renovation of the building social. and techn.; liquidation of existing technical objects, including dismantling of the basket grate, spiral sieve, dismantling of 4 plots of sludge, sinks of transported sewage; construction of sanitary sewage system in district street. Wheat and Żytnia in m. Bytom Odrz. on a stretch of 877 m; construction of a water supply network. in district St. Wheat and Life in M. Bytom Odrz. d. 543.29 m and the construction of photovoltaic micro-installations in Tarnów Bycki. Target: Residents of the Bytom Agglomeration. Residents of the municipality of Bytom Odrz. and Pow. The New Caledonia Municipality of Bytom. The aim of the project is to improve access to good quality infrastrukt. water and sewage in the area of Bytom Municipality odrz. Zdefin. target depth and objectives detail. Deal with define problems as a result of problem analysis. For the purposes of detail., closely related to the target, include: Improvement of access of residents of the Agglomeration Bytom Odrz. to infrastrukt. water supply, by building 543.29 m of water supply. Improving access to the people of Aglom. Bytom Odrz. do infrastrukt. sewage, through modernisation of sewage treatment plant and construction of 877 m sanitary sewage system. Increase the RLM numbers connected to the network in Aglom. Bytom Odrz. o31 RLM Product Indicators: The sewer net. sanit. (km) – 0,877 Dc. of construction. Canaliz. sanit. (km) – 0,877 Long construction of the water supply network. (km) – 0, 5432 L. reconstruction of municipal waste water treatment plants (pieces) – 1 L. repair of municipal waste water treatment plants (pieces) – 1 Results indicators: L. additive. pers. benefit from improved waste water treatment (CI 19) (RLM)-31; L. additive for improved water supply (CI 18) (persons) – 35; Projections. l. pers. benefit from improved waste water treatment (RLM) – 4469 Improved waste water cargo volume (RLM) – 4469 Employment growth in supported entities (other than by (English) / qualifier | |||||||||||||||
point in time: 16 October 2020
|
Revision as of 00:42, 16 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the water and wastewater management system in the agglomeration of Bytom Odra |
Project in Poland financed by DG Regio |
Statements
2,310,265.07 zloty
0 references
2,717,958.98 zloty
0 references
85.0 percent
0 references
10 January 2017
0 references
15 October 2018
0 references
GMINA BYTOM ODRZAŃSKI
0 references
Proj. polega na realiz. działań wspierających gospodarkę wodno-ściekowej. Przedmiot. proj. jest przebudowa oczyszczalni ścieków w Bytomiu Odrz.; remont budynku socjal. i budynku techn.; likwidacja istniejących zużytych techn. obiektów, w tym demontaż kraty koszowej, sita spiralnego, demontaż 4 poletek osadu, zlewni ścieków dowożonych; budowa sieci kanalizacji sanitarnej w rej. ul. Pszenicznej i Żytniej w m. Bytom Odrz. na odcinku 877m; budowa sieci wodociąg. w rej. ul. Pszenicznej i Żytniej w m. Bytom Odrz. o dł. 543,29 m oraz budowa mikroinstalacji fotowoltaicznych w Tarnowie Byckim. Gr. docelowe: Mieszkańcy Aglomeracji Bytom Odrz. Mieszkańcy Gminy Bytom Odrz. i Pow. Nowosolskiego Władze Gminy Bytom Odrz. Gł. celem proj. jest poprawa dostępu do dobrej jakości infrastrukt. wodociągowo-kanalizacyjnej na obszarze Gminy Bytom Odrz. Zdefin. cel gł. oraz cele szczegół. Odp. na problemy zdefin. w wyniku analizy problemów. Do celów szczegół., ściśle powiązanych z celem gł. należą: Poprawa dostępu mieszkańców Aglomeracji Bytom Odrz. do infrastrukt. wodociąg., poprzez budowę 543,29 m wodociągu. Poprawa dostępu mieszkańców Aglom. Bytom Odrz. do infrastrukt. kanaliz., poprzez modernizację oczyszczalni ścieków oraz budowę 877 m kanalizacji sanitarnej. Zwiększ. liczby RLM przyłączonych do sieci w Aglom. Bytom Odrz. o31 RLM Wskaźniki produktu: Dł. sieci kanaliz. sanit. (km) – 0,877 Dł. wybudow. Kanaliz. sanit. (km) – 0,877 Dł. wybudow. sieci wodociąg. (km) – 0, 5432 L. przebudow. oczyszczalni ścieków komunalnych (szt.) – 1 L. wyremont. oczyszczalni ścieków komunalnych (szt.) – 1 Wskaźniki rezultatu: L. dodatk. os. korzyst. z ulepszonego oczyszczania ścieków (CI 19) (RLM)- 31; L. dodatk. os. korzyst. z ulepszonego zaopatrzenia w wodę (CI 18) (osoby) – 35; Przewidyw. l. os. korzyst. z ulepszonego oczyszczania ścieków (RLM) – 4469 Wielkość ładunku ścieków poddanych ulepsz. oczyszczaniu (RLM) – 4469 Wzrost zatrudnienia we wspieranych podmiotach (innych niż prze (Polish)
0 references
The project is based on the implementation of activities supporting water and sewage management. The subject of the project is the reconstruction of the sewage treatment plant in Bytom. renovation of the building social. and techn.; liquidation of existing technical objects, including dismantling of the basket grate, spiral sieve, dismantling of 4 plots of sludge, sinks of transported sewage; construction of sanitary sewage system in district street. Wheat and Żytnia in m. Bytom Odrz. on a stretch of 877 m; construction of a water supply network. in district St. Wheat and Life in M. Bytom Odrz. d. 543.29 m and the construction of photovoltaic micro-installations in Tarnów Bycki. Target: Residents of the Bytom Agglomeration. Residents of the municipality of Bytom Odrz. and Pow. The New Caledonia Municipality of Bytom. The aim of the project is to improve access to good quality infrastrukt. water and sewage in the area of Bytom Municipality odrz. Zdefin. target depth and objectives detail. Deal with define problems as a result of problem analysis. For the purposes of detail., closely related to the target, include: Improvement of access of residents of the Agglomeration Bytom Odrz. to infrastrukt. water supply, by building 543.29 m of water supply. Improving access to the people of Aglom. Bytom Odrz. do infrastrukt. sewage, through modernisation of sewage treatment plant and construction of 877 m sanitary sewage system. Increase the RLM numbers connected to the network in Aglom. Bytom Odrz. o31 RLM Product Indicators: The sewer net. sanit. (km) – 0,877 Dc. of construction. Canaliz. sanit. (km) – 0,877 Long construction of the water supply network. (km) – 0, 5432 L. reconstruction of municipal waste water treatment plants (pieces) – 1 L. repair of municipal waste water treatment plants (pieces) – 1 Results indicators: L. additive. pers. benefit from improved waste water treatment (CI 19) (RLM)-31; L. additive for improved water supply (CI 18) (persons) – 35; Projections. l. pers. benefit from improved waste water treatment (RLM) – 4469 Improved waste water cargo volume (RLM) – 4469 Employment growth in supported entities (other than by (English)
16 October 2020
0 references
Identifiers
RPLB.04.03.00-08-0008/17
0 references