Q100355 (Q100355): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the project is the construction of a network of bicycle paths, which will serve as transport corridors, which are an alternative to other modes of transport. The project is a road investment involving the construction of bicycle paths. It envisages construction works in the following sectors: road, bridge, construction and construction – small architecture (staying-bike stop 2 pcs: bicycle stand, picnic table, waste basket, table...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 00:41, 16 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
1,349,818.33 zloty
0 references
2,081,347.33 zloty
0 references
64.85 percent
0 references
30 January 2018
0 references
30 September 2020
0 references
GMINA SZCZANIEC
0 references
Przedmiotem projektu jest budowa sieci ścieżek rowerowych, które będą pełniły funkcję korytarzy transportowych, będących alternatywą dla innych środków transportu. Przedsięwzięcie to inwestycja drogowa polegająca na budowie ścieżek rowerowych. W jej ramach przewiduje się roboty budowlane w branżach: drogowej, mostowej, konstrukcyjno-budowlanej – mała architektura (miejsca postoju-bike stop 2 szt: stojak na rowery, stół piknikowy, kosz na odpady, tablica info. ustawione na utwardzonej nawierzchni). We wszystkich koniecznych przypadkach będą wykonane roboty branżowe związane z usunięciem kolizji ścieżek rowerowych z infrastr. podziemną i naziemną. Inwestycja realizowana jest w partnerstwie: Gm. Szczaniec (lider), Gm. Świebodzin, Gm. Zbąszynek, Pow. Świebodziński. Usytuowana jest w woj. lubuskim na terenie Gm. Szczaniec (pow. świebodziński). Obejmuje budowę ścieżki rowerowej o długości ok. 4,7 km, na odcinkach dróg ze Szczańca w kierunku Świebodzina, w tym na obszarze miejscowości Jerzyce i Szczaniec (gm. Szczaniec). Gr. docelowe: Mieszkańcy Pow. Świebodzińskiego; Inwestorzy i przedsiębiorcy; Władze JST: gm. Szczaniec, gm. Świebodzin, gm. Zbąszynek, pow. Świebodzińskiego; Instytucje systemu ochrony środowiska. Gł. celem projektu jest ograniczenie niskiej emisji zanieczyszczeń z sektora transportu poprzez rozwój infrastruktury rowerowej na terenie Pow. Świebodzińskiego. Do celów szczegółowych należą: 1. Rozwój infrastruktury dla rowerzystów 2. Poprawa jakości i funkcjonowania oferty systemu transportowego 3. Zwiększenie bezpieczeństwa rowerzystów na drogach publ. W. Produktu: Dł. wspartej infr. rowerowej: 4,7 km, L. obiektów dost. do potrzeb osób z niepełn.: 1 szt. L. proj., w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełn.: 1 szt. W. Rezultatu: Szac. roczny spadek emisji g. ciepl. (CI 34): 25,15 Tony równoważnika CO2/rok W. zatr: 1 EPC W. zatr. - kobiety: 0 EPC W. zatr. – mężczyźni: 1 EPC (Polish)
0 references
The subject of the project is the construction of a network of bicycle paths, which will serve as transport corridors, which are an alternative to other modes of transport. The project is a road investment involving the construction of bicycle paths. It envisages construction works in the following sectors: road, bridge, construction and construction – small architecture (staying-bike stop 2 pcs: bicycle stand, picnic table, waste basket, table info. set on paved surface). In all cases necessary, industry work will be done to remove collisions of bicycle paths from underground and terrestrial infrastr. The investment is carried out in partnership: GM. Szczaniec (leader), Gm. Świebodzin, Gm. Zbąszynek, Pow. It’s a freshman. It is located in Lubuskie Voivodeship in the area of Gm. Szczaniec (Pow. Świbodziński). It includes the construction of a bicycle path with a length of approx. 4.7 km, on sections of the roads from Szczaniec towards Świebodzina, including in the area of Jerzyce and Szczaniec (gm. Szczaniec). Target: Residents of Pow. Świebodziński; Investors and entrepreneurs; The authorities of the HST shall: Gm. Szczaniec, gm. Świebodzin, gm. Zbuszynek, pow. Świebodziński; Environmental protection system institutions. The aim of the project is to reduce the low emissions of pollutants from the transport sector through the development of cycling infrastructure in Pow. It’s Świebodziński. The specific objectives shall include: 1. Development of infrastructure for cyclists 2. Improving the quality and functioning of the transport system offer 3. Increase the safety of cyclists on publ roads. W. Product: D. in support of bicycle infr.: 4,7 km, L. facilities available for the needs of persons with incomplete.: 1 pcs L. project, which financed the costs of rational improvement for persons incomplete: 1 pcs W. Result: Estimated annual decrease in emissions of g. heat. (CI 34): 25,15 tonnes of CO2 equivalent/year W. zatr: 1 FTE W. zatr. — women: 0 FTE W. zatr. — men: 1 FTE (English)
16 October 2020
0 references
Identifiers
RPLB.03.03.01-08-0003/18
0 references