Reconstruction of the district road No 2442C CVE-CONGO from km 2 + 463 to km 3 + 460 with a length of time 0.997 km (Q98568): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The planned investment will consist of the conversion of district road No 2442C digging to Ciechoz. Wymyłowice — Ciechoz, from km 2 + 463 to km 3 + 460, with a length of 0.997 km, i.e. to extend it and increase the load capacity of the existing pavement capable of transferring the load of category KR-3. The scope of the planned investment consists of a widening of the road from a width of 5.00 m to a width of 6.00 m, the performance of the pro...)
(‎Created claim: summary (P836): The planned investment will consist of reconstruction of district road No. 2442C Kopanie – Ciechrz odc. Wymysłowice – Ciechrz from km 2+ 463 to km 3 + 460 with a length of 0.997 km, i.e. extending it and increasing the load capacity of the existing surface capable of transmitting traffic load category KR-3. The scope of the planned investment includes a double extension of the road from a width of 5.00 m to a width of 6.00 m, a profile layer mad...)
Property / summary
 
The planned investment will consist of reconstruction of district road No. 2442C Kopanie – Ciechrz odc. Wymysłowice – Ciechrz from km 2+ 463 to km 3 + 460 with a length of 0.997 km, i.e. extending it and increasing the load capacity of the existing surface capable of transmitting traffic load category KR-3. The scope of the planned investment includes a double extension of the road from a width of 5.00 m to a width of 6.00 m, a profile layer made of mineral-asphalt mass to achieve the required transverse and longitudinal drops, condensation of individual layers with asphalt emulsion, making a binding layer of gr. 5 cm and abrasive layer of gr. 4 cm from mineral-asphalt mixture. The scope of the reconstruction also includes reconstruction of exits and reconstruction and execution of regular width of both sides. As part of adapting infrastructure to changing climatic conditions, appropriate lateral and longitudinal drops to open evaporative ditches will be designed to ensure the removal of rainwater and meltwater from the road surface. This investment project to rebuild the existing district road through the performance of the above-mentioned scope of works will increase the technical and operational parameters of the road. (English)
Property / summary: The planned investment will consist of reconstruction of district road No. 2442C Kopanie – Ciechrz odc. Wymysłowice – Ciechrz from km 2+ 463 to km 3 + 460 with a length of 0.997 km, i.e. extending it and increasing the load capacity of the existing surface capable of transmitting traffic load category KR-3. The scope of the planned investment includes a double extension of the road from a width of 5.00 m to a width of 6.00 m, a profile layer made of mineral-asphalt mass to achieve the required transverse and longitudinal drops, condensation of individual layers with asphalt emulsion, making a binding layer of gr. 5 cm and abrasive layer of gr. 4 cm from mineral-asphalt mixture. The scope of the reconstruction also includes reconstruction of exits and reconstruction and execution of regular width of both sides. As part of adapting infrastructure to changing climatic conditions, appropriate lateral and longitudinal drops to open evaporative ditches will be designed to ensure the removal of rainwater and meltwater from the road surface. This investment project to rebuild the existing district road through the performance of the above-mentioned scope of works will increase the technical and operational parameters of the road. (English) / rank
 
Normal rank
Property / summary: The planned investment will consist of reconstruction of district road No. 2442C Kopanie – Ciechrz odc. Wymysłowice – Ciechrz from km 2+ 463 to km 3 + 460 with a length of 0.997 km, i.e. extending it and increasing the load capacity of the existing surface capable of transmitting traffic load category KR-3. The scope of the planned investment includes a double extension of the road from a width of 5.00 m to a width of 6.00 m, a profile layer made of mineral-asphalt mass to achieve the required transverse and longitudinal drops, condensation of individual layers with asphalt emulsion, making a binding layer of gr. 5 cm and abrasive layer of gr. 4 cm from mineral-asphalt mixture. The scope of the reconstruction also includes reconstruction of exits and reconstruction and execution of regular width of both sides. As part of adapting infrastructure to changing climatic conditions, appropriate lateral and longitudinal drops to open evaporative ditches will be designed to ensure the removal of rainwater and meltwater from the road surface. This investment project to rebuild the existing district road through the performance of the above-mentioned scope of works will increase the technical and operational parameters of the road. (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:59, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the district road No 2442C CVE-CONGO from km 2 + 463 to km 3 + 460 with a length of time 0.997 km
Project in Poland financed by DG Regio

    Statements

    0 references
    1,107,417.91 zloty
    0 references
    265,780.30 Euro
    13 January 2020
    0 references
    1,302,844.6 zloty
    0 references
    312,682.70 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 August 2018
    0 references
    31 December 2018
    0 references
    POWIAT MOGILEŃSKI
    0 references
    Planowana inwestycja polegać będzie na przebudowie drogi powiatowej nr 2442C Kopanie – Ciechrz odc. Wymysłowice – Ciechrz od km 2+463 do km 3+460 o długości 0,997 km, tj. na poszerzeniu jej i zwiększeniu nośności istniejącej nawierzchni zdolnej do przeniesienia obciążenia ruchem kategorii KR-3. Zakres planowanej inwestycji obejmuje obustronne poszerzenie jezdni z szerokości 5,00m do szerokości 6,00m, wykonanie warstwy profilowej z masy mineralno –asfaltowej w celu uzyskania wymaganych spadków poprzecznych i podłużnych, skropienie poszczególnych warstw emulsją asfaltową, wykonanie warstwy wiążącej gr. 5cm i warstwy ścieralnej gr. 4cm z mieszanki mineralno-asfaltowej. Zakres przebudowy obejmuje również przebudowę zjazdów oraz odtworzenie i wykonanie regularnej szerokości obustronnych poboczy. W ramach dostosowywania infrastruktury do zmieniających się warunków klimatycznych, dla zapewnienia odprowadzenia wód opadowych i roztopowych z powierzchni drogi zostaną zaprojektowane właściwe spadki poprzeczne i podłużne do rowów drogowych otwartych – odparowujących. Przedmiotowe przedsięwzięcie inwestycyjne przebudowy istniejącej drogi powiatowej poprzez wykonanie ww. zakresu robót spowoduje podwyższenie parametrów technicznych i eksploatacyjnych drogi. (Polish)
    0 references
    The planned investment will consist of reconstruction of district road No. 2442C Kopanie – Ciechrz odc. Wymysłowice – Ciechrz from km 2+ 463 to km 3 + 460 with a length of 0.997 km, i.e. extending it and increasing the load capacity of the existing surface capable of transmitting traffic load category KR-3. The scope of the planned investment includes a double extension of the road from a width of 5.00 m to a width of 6.00 m, a profile layer made of mineral-asphalt mass to achieve the required transverse and longitudinal drops, condensation of individual layers with asphalt emulsion, making a binding layer of gr. 5 cm and abrasive layer of gr. 4 cm from mineral-asphalt mixture. The scope of the reconstruction also includes reconstruction of exits and reconstruction and execution of regular width of both sides. As part of adapting infrastructure to changing climatic conditions, appropriate lateral and longitudinal drops to open evaporative ditches will be designed to ensure the removal of rainwater and meltwater from the road surface. This investment project to rebuild the existing district road through the performance of the above-mentioned scope of works will increase the technical and operational parameters of the road. (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.05.01.00-04-0013/17
    0 references