Development, reconstruction and renovation of the existing buildings of the Primary School with the construction of a gym at school in Ostaszewo. (Q98332): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The investment requested concerns the thermal modernisation of the two buildings of the Primary School in Ostazewie, is part of a larger investment called, Expansion, rebuilding and thermo-modernisation of the existing buildings of the Primary School with the construction of a gym at a school in Ostanzewo’. The tasks planned for the grant of funding consist of the thermal modernisation works of two buildings of the Primary School in Ostaszewie...)
(‎Created claim: summary (P836): The proposed investment concerns the thermal modernisation of the two buildings of the Primary School in Ostaszewo, part of a larger investment under the name, Expansion, reconstruction and thermal modernisation of the existing buildings of the Primary School together with the construction of a gym at the school in Ostaszewo. The planned tasks include thermal retrofitting work on two buildings of the primary school in Ostaszewo designated in the...)
Property / summary
 
The proposed investment concerns the thermal modernisation of the two buildings of the Primary School in Ostaszewo, part of a larger investment under the name, Expansion, reconstruction and thermal modernisation of the existing buildings of the Primary School together with the construction of a gym at the school in Ostaszewo. The planned tasks include thermal retrofitting work on two buildings of the primary school in Ostaszewo designated in the construction project as B and C. Thermomodernisation works planned to be carried out in building B:1. Internal central heating system with circulation and storage tank supplied from the gas boiler room,2. Warming of external walls not warmed (with facade repair),3. Replacement (others for replacement) of external windows for PVC windows,4. Warming of the floor on the ground (with a new floor),5. Warming of non-ventilated trophode (including the removal of existing warming and associated robots),6. Replacement (others for replacement) of the external door for the door,7. Warming of the warmed outer walls (including the dismantling of existing warming),8. Resigning from the local coal boiler room, making a new gas boiler room together with the replacement of the internal central heating system and installation of control devicesThermal modernisation works provided for in building C:1.Increasing of the outer walls from the inside with mineral insulating plates,2.Replacement of the new seating (other work for the replacement) of the external floor on the Windows PCV,3.Made of internal installation of the c.w.u. with circulatory. (English)
Property / summary: The proposed investment concerns the thermal modernisation of the two buildings of the Primary School in Ostaszewo, part of a larger investment under the name, Expansion, reconstruction and thermal modernisation of the existing buildings of the Primary School together with the construction of a gym at the school in Ostaszewo. The planned tasks include thermal retrofitting work on two buildings of the primary school in Ostaszewo designated in the construction project as B and C. Thermomodernisation works planned to be carried out in building B:1. Internal central heating system with circulation and storage tank supplied from the gas boiler room,2. Warming of external walls not warmed (with facade repair),3. Replacement (others for replacement) of external windows for PVC windows,4. Warming of the floor on the ground (with a new floor),5. Warming of non-ventilated trophode (including the removal of existing warming and associated robots),6. Replacement (others for replacement) of the external door for the door,7. Warming of the warmed outer walls (including the dismantling of existing warming),8. Resigning from the local coal boiler room, making a new gas boiler room together with the replacement of the internal central heating system and installation of control devicesThermal modernisation works provided for in building C:1.Increasing of the outer walls from the inside with mineral insulating plates,2.Replacement of the new seating (other work for the replacement) of the external floor on the Windows PCV,3.Made of internal installation of the c.w.u. with circulatory. (English) / rank
 
Normal rank
Property / summary: The proposed investment concerns the thermal modernisation of the two buildings of the Primary School in Ostaszewo, part of a larger investment under the name, Expansion, reconstruction and thermal modernisation of the existing buildings of the Primary School together with the construction of a gym at the school in Ostaszewo. The planned tasks include thermal retrofitting work on two buildings of the primary school in Ostaszewo designated in the construction project as B and C. Thermomodernisation works planned to be carried out in building B:1. Internal central heating system with circulation and storage tank supplied from the gas boiler room,2. Warming of external walls not warmed (with facade repair),3. Replacement (others for replacement) of external windows for PVC windows,4. Warming of the floor on the ground (with a new floor),5. Warming of non-ventilated trophode (including the removal of existing warming and associated robots),6. Replacement (others for replacement) of the external door for the door,7. Warming of the warmed outer walls (including the dismantling of existing warming),8. Resigning from the local coal boiler room, making a new gas boiler room together with the replacement of the internal central heating system and installation of control devicesThermal modernisation works provided for in building C:1.Increasing of the outer walls from the inside with mineral insulating plates,2.Replacement of the new seating (other work for the replacement) of the external floor on the Windows PCV,3.Made of internal installation of the c.w.u. with circulatory. (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:32, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development, reconstruction and renovation of the existing buildings of the Primary School with the construction of a gym at school in Ostaszewo.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,019,118.75 zloty
    0 references
    244,588.5 Euro
    13 January 2020
    0 references
    1,232,576.69 zloty
    0 references
    295,818.41 Euro
    13 January 2020
    0 references
    82.68 percent
    0 references
    30 May 2018
    0 references
    31 December 2019
    0 references
    GMINA ŁYSOMICE
    0 references
    Wnioskowana inwestycja dotyczy termomodernizacji dwóch budynków Szkoły Podstawowej w Ostaszewie, jest częścią większej inwestycji pod nazwą ,, Rozbudowa, przebudowa i termomodernizacja istniejących budynków Szkoły Podstawowej wraz z budową sali gimnastycznej przy szkole w miejscowości Ostaszewo’’. Planowane do dofinansowania zadania obejmują prace termomodernizacyjne dotyczą dwóch budynków szkoły Podstawowej w Ostaszewie oznaczonych w projekcie budowlanym jako budynki B i C. Prace termomodernizacyjne planowane do wykonania w budynku B :1. Wykonanie wewnętrznej instalacji c.w.u. z cyrkulacją i zasobnikiem zasilanym z kotłowni gazowej,2. Docieplenie ścian zewnętrznych nieocieplonych (z naprawą elewacji),3. Wymiana (pozostałych do wymiany) okien zewnętrznych na okna PCV,4. Docieplenie podłogi na gruncie (z wykonaniem nowej posadzki),5. Docieplenie stropodachu niewentylowanego (wraz z usunięciem istniejącego docieplenia i robotami towarzyszącymi),6. Wymiana (pozostałych do wymiany) drzwi zewnętrznych na drzwi,7. Docieplenie ścian zewnętrznych ocieplonych (wraz z demontażem istniejącego docieplenia),8. Rezygnacja z lokalnej kotłowni węglowej, wykonanie nowej kotłowni gazowej wraz z wymianą wewnętrznej instalacji c.o. i montażem urządzeń regulacyjnychPrace termomodernizacyjne przewidziane do wykonania w budynku C:1.Docieplenie ścian zewnętrznych od wewnątrz mineralnymi płytami izolacyjnymi,2.Wymiana (pozostałych do wymiany) okien zewnętrznych na okna PCV,3.Wykonanie wewnętrznej instalacji c.w.u. z cyrkulacją i zasobnikiem zasilanym z kotłowni gazowej,4.Docieplenie stropu pod nieogrzewanym poddaszem (z usunięciem istniejącej polepy i niezbędnymi robotami towarzyszącymi),5.Docieplenie podłogi na gruncie (z wykonaniem nowej posadzki),6.Wymiana (pozostałych do wymiany) drzwi zewnętrznych na drzwi,7.Rezygnacja z lokalnej kotłowni węglowej, wykonanie nowej kotłowni gazowej wraz z wymianą wewnętrznej instalacji c.o. i montażem urządzeń regulacyjnych. (Polish)
    0 references
    The proposed investment concerns the thermal modernisation of the two buildings of the Primary School in Ostaszewo, part of a larger investment under the name, Expansion, reconstruction and thermal modernisation of the existing buildings of the Primary School together with the construction of a gym at the school in Ostaszewo. The planned tasks include thermal retrofitting work on two buildings of the primary school in Ostaszewo designated in the construction project as B and C. Thermomodernisation works planned to be carried out in building B:1. Internal central heating system with circulation and storage tank supplied from the gas boiler room,2. Warming of external walls not warmed (with facade repair),3. Replacement (others for replacement) of external windows for PVC windows,4. Warming of the floor on the ground (with a new floor),5. Warming of non-ventilated trophode (including the removal of existing warming and associated robots),6. Replacement (others for replacement) of the external door for the door,7. Warming of the warmed outer walls (including the dismantling of existing warming),8. Resigning from the local coal boiler room, making a new gas boiler room together with the replacement of the internal central heating system and installation of control devicesThermal modernisation works provided for in building C:1.Increasing of the outer walls from the inside with mineral insulating plates,2.Replacement of the new seating (other work for the replacement) of the external floor on the Windows PCV,3.Made of internal installation of the c.w.u. with circulatory. (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.03.05.01-04-0006/18
    0 references