(‎Removed claim: summary (P836): The scope of the project covers the rehabilitation and restoration of three degraded water retention basins situated within the housing of the area of Miloszyce, Chwowice and Jelzk-Laskowice in the municipality of Jelzk-Lacskowice in order to restore the retention capacity of the reservoirs of storm water reservoirs collected in a closed and open sewage system from built-up areas in order to improve water management in respect of small-scale r...)
(‎Created claim: summary (P836): The scope of the Project includes rehabilitation and reconstruction activities of three degraded retention tanks located within the residential area of Miłoszyce, Chwałowice and Jelcz-Laskowice in the commune Jelcz-Laskowice, in order to restore the retention capacity of reservoirs for rain waters collected by a closed and open sewerage system from areas built up to improve water management in the range of small areas; In addition, the project i...)
Property / summary
 
The scope of the Project includes rehabilitation and reconstruction activities of three degraded retention tanks located within the residential area of Miłoszyce, Chwałowice and Jelcz-Laskowice in the commune Jelcz-Laskowice, in order to restore the retention capacity of reservoirs for rain waters collected by a closed and open sewerage system from areas built up to improve water management in the range of small areas; In addition, the project involves the restoration, ordering and protection of natural natural sites built in water bodies and in the immediate area of water reservoirs and land development taking into account existing infrastructure. The scope of the project includes: 1.Construction works: • demolition work: • earthworks, i.e.: cleaning of tanks and drainage ditch, profiled grading, • installation work, i.e. installed separators, connecting wells, culvert construction, grading housing, • land management: places of rest (Miłoszyce tank), tramways – roadways, fishing bridge (Jelcz-Laskowice tank) and paths, installation of benches, trash bins, bicycle racks, construction of system fences. 2.Promotional activities •installation of educational boards within tanks, •installation of information and promotional boards according to cohesion policy, The total retention capacity of the tanks is 6900 m³. The beneficiary is the Municipality of Jelcz-Laskowice. The project will be implemented between 2017 and 2019 under 5 contracts (2 works contracts and 3 service contracts). Since the value of the Project is less than EUR1 million, the project is not an income-generating project. There are no grounds for state aid. The project management system will guarantee its smooth implementation in accordance with the agreed timetable and smooth settlement with the co-financing institution. The applicant shall have the organisational and financial capacity to maintain the project. (English)
Property / summary: The scope of the Project includes rehabilitation and reconstruction activities of three degraded retention tanks located within the residential area of Miłoszyce, Chwałowice and Jelcz-Laskowice in the commune Jelcz-Laskowice, in order to restore the retention capacity of reservoirs for rain waters collected by a closed and open sewerage system from areas built up to improve water management in the range of small areas; In addition, the project involves the restoration, ordering and protection of natural natural sites built in water bodies and in the immediate area of water reservoirs and land development taking into account existing infrastructure. The scope of the project includes: 1.Construction works: • demolition work: • earthworks, i.e.: cleaning of tanks and drainage ditch, profiled grading, • installation work, i.e. installed separators, connecting wells, culvert construction, grading housing, • land management: places of rest (Miłoszyce tank), tramways – roadways, fishing bridge (Jelcz-Laskowice tank) and paths, installation of benches, trash bins, bicycle racks, construction of system fences. 2.Promotional activities •installation of educational boards within tanks, •installation of information and promotional boards according to cohesion policy, The total retention capacity of the tanks is 6900 m³. The beneficiary is the Municipality of Jelcz-Laskowice. The project will be implemented between 2017 and 2019 under 5 contracts (2 works contracts and 3 service contracts). Since the value of the Project is less than EUR1 million, the project is not an income-generating project. There are no grounds for state aid. The project management system will guarantee its smooth implementation in accordance with the agreed timetable and smooth settlement with the co-financing institution. The applicant shall have the organisational and financial capacity to maintain the project. (English) / rank
 
Normal rank
Property / summary: The scope of the Project includes rehabilitation and reconstruction activities of three degraded retention tanks located within the residential area of Miłoszyce, Chwałowice and Jelcz-Laskowice in the commune Jelcz-Laskowice, in order to restore the retention capacity of reservoirs for rain waters collected by a closed and open sewerage system from areas built up to improve water management in the range of small areas; In addition, the project involves the restoration, ordering and protection of natural natural sites built in water bodies and in the immediate area of water reservoirs and land development taking into account existing infrastructure. The scope of the project includes: 1.Construction works: • demolition work: • earthworks, i.e.: cleaning of tanks and drainage ditch, profiled grading, • installation work, i.e. installed separators, connecting wells, culvert construction, grading housing, • land management: places of rest (Miłoszyce tank), tramways – roadways, fishing bridge (Jelcz-Laskowice tank) and paths, installation of benches, trash bins, bicycle racks, construction of system fences. 2.Promotional activities •installation of educational boards within tanks, •installation of information and promotional boards according to cohesion policy, The total retention capacity of the tanks is 6900 m³. The beneficiary is the Municipality of Jelcz-Laskowice. The project will be implemented between 2017 and 2019 under 5 contracts (2 works contracts and 3 service contracts). Since the value of the Project is less than EUR1 million, the project is not an income-generating project. There are no grounds for state aid. The project management system will guarantee its smooth implementation in accordance with the agreed timetable and smooth settlement with the co-financing institution. The applicant shall have the organisational and financial capacity to maintain the project. (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:23, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The restoration of three water bodies: in Miłoszyce, Chłowice and Jelczuk-Lakowice in the municipality of Jelcz-Laskowice
Project in Poland financed by DG Regio

    Statements

    0 references
    1,677,327.01 zloty
    0 references
    402,558.48 Euro
    13 January 2020
    0 references
    1,973,325.9 zloty
    0 references
    473,598.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 June 2017
    0 references
    27 December 2019
    0 references
    GMINA JELCZ-LASKOWICE
    0 references
    Zakres Projektu obejmuje działania rekultywacyjne i odtworzeniowe trzech zdegradowanych zbiorników retencyjnych położonych w obrębie zabudowy mieszkaniowej na terenie miejscowości Miłoszyce, Chwałowice i Jelcz-Laskowice w gminie Jelcz-Laskowice, w celu przywrócenia zdolności retencyjnej zbiorników dla wód opadowych nadmiarowych zbieranych systemem kanalizacji zamkniętej i otwartej z obszarów zabudowanych w celu poprawy gospodarki wodnej w zakresie małej retencji; Ponadto projekt zakłada odtworzenie, uporządkowanie i ochronę naturalnych stanowisk przyrodniczych powstałych w zbiornikach wodnych i w bezpośredniej strefie zbiorników wodnych oraz zagospodarowanie terenu z uwzględnieniem istniejącej infrastruktury. Zakres projektu obejmuje m.in: 1.Roboty budowlane: •prace rozbiórkowe: •prace ziemne t.j: czyszczenie zbiorników i rowu dopływowego, profilowane skarp, •prace instalacyjne t.j. instalowane separatorów, studni połączeniowych, budowę przepustu, obudowę skarp, •zagospodarowanie terenu: miejsca wypoczynku(zbiornik Miłoszyce), ciągów pieszo – jezdnych, pomostu wędkarskiego(zbiornik Jelcz –Laskowice)oraz ścieżek, instalację ławeczek, koszy na śmieci, stojaków na rowery, budowę ogrodzenia systemowego. 2.Działania promocyjne •instalacja tablic edukacyjnych w obrębie zbiorników, •instalacja tablic informacyjno-promocyjnych zgodnie z polityką spójności, Całkowita pojemność retencyjna zbiorników wynosi 6 900 m3. Beneficjentem jest Gmina Jelcz-Laskowice. Projekt zostanie zrealizowany w latach 2017-2019 w ramach 5 umów (2 umowy na roboty i 3 umowy na usługi). Ponieważ wartość Projektu jest mniejsza niż 1 mln euro, projekt nie jest projektem generującym dochód. Nie występują przesłanki pomocy publicznej. System zarządzania Projektem będzie gwarantować jego sprawną realizację zgodnie z przyjętym harmonogramem oraz bezproblemowe rozliczenia z instytucją współfinansującą. Wnioskodawca posiada zdolność organizacyjną i finansową do utrzymania projektu. (Polish)
    0 references
    The scope of the Project includes rehabilitation and reconstruction activities of three degraded retention tanks located within the residential area of Miłoszyce, Chwałowice and Jelcz-Laskowice in the commune Jelcz-Laskowice, in order to restore the retention capacity of reservoirs for rain waters collected by a closed and open sewerage system from areas built up to improve water management in the range of small areas; In addition, the project involves the restoration, ordering and protection of natural natural sites built in water bodies and in the immediate area of water reservoirs and land development taking into account existing infrastructure. The scope of the project includes: 1.Construction works: • demolition work: • earthworks, i.e.: cleaning of tanks and drainage ditch, profiled grading, • installation work, i.e. installed separators, connecting wells, culvert construction, grading housing, • land management: places of rest (Miłoszyce tank), tramways – roadways, fishing bridge (Jelcz-Laskowice tank) and paths, installation of benches, trash bins, bicycle racks, construction of system fences. 2.Promotional activities •installation of educational boards within tanks, •installation of information and promotional boards according to cohesion policy, The total retention capacity of the tanks is 6900 m³. The beneficiary is the Municipality of Jelcz-Laskowice. The project will be implemented between 2017 and 2019 under 5 contracts (2 works contracts and 3 service contracts). Since the value of the Project is less than EUR1 million, the project is not an income-generating project. There are no grounds for state aid. The project management system will guarantee its smooth implementation in accordance with the agreed timetable and smooth settlement with the co-financing institution. The applicant shall have the organisational and financial capacity to maintain the project. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.04.05.02-02-0001/17
    0 references