Thermomodemisation of public utility facilities of the Sępoie County (Q98210): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Thermomodemisation of public utility facilities of the Sępoie County

Revision as of 23:17, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermomodemisation of public utility facilities of the Sępoie County
Project in Poland financed by DG Regio

    Statements

    0 references
    357,231.99 zloty
    0 references
    85,735.68 Euro
    13 January 2020
    0 references
    504,434.82 zloty
    0 references
    121,064.36 Euro
    13 January 2020
    0 references
    70.82 percent
    0 references
    4 April 2016
    0 references
    30 June 2018
    0 references
    POWIAT SĘPOLEŃSKI
    0 references
    Projekt obejmuje wykonanie termomodernizacji 4 powiatowych budynków użyteczności publicznej: budynku administracyjnego Domu Pomocy Społecznej w Suchorączku, budynku diagnostyki laboratoryjnej i anatomii patologicznej w Więcborku oraz budynku Poradni Psychologiczno-Pedagogicznej w Sępólnie Krajeńskim. Wszystkie rozpatrywane budynki są obiektami wybudowanymi w niskim standardzie cieplnym i wymagają działań podnoszących ich standard. Wykonanie wskazanych we wniosku działań termomodernizacyjnych jest niezbędne ze względu na ogólny zły stan techniczny budynków. Termomodernizacja dopełni działania powiatu w zakresie dokonanych wymian i modernizacji poszczególnych źródeł wytwarzania ciepła. W ramach projektu przewiduje się wykona nie prac termomodernizacyjnych polegających na wykonaniu następujących robót termomodernizacyjnych wraz z niezbędnymi pracami towarzyszącymi: a) w budynku Domu Pomocy Społecznej w Suchorączku: docieplenie ścian zewnętrznych styropianem, docieplenie stropu piwnicy styropianem, płukanie instalacji grzewczej: b) w budynku anatomii patologicznej: wymiana stolarki drewnianej na nową PCV z szybą zespoloną, docieplenie ścian zewnętrznych płytami styropianowymi, wymiana stolarki drewnianej na nową, docieplenie stropodachu przez ułożenie płytsze styropapy; c) w budynku laboratorium medycznego: docieplenie połaci dachowych wełną mineralną, docieplenie stropu nad piwnicą, wymiana stolarki okiennej i drzwiowej na nową z PC, docieplenie ścian zewnętrznych; d) w budynku Poradni Psychologiczno-Pedagogicznej: docieplanie stropu poddasza oraz wymiana stolarki okiennej na okna plastikowe. Przeprowadzenie inwestycji przyczyni się do osiągnięcia takich celów projektu jak: poprawa stanu środowiska, poprawa stanu zdrowia mieszkańców, poprą wę warunków pracy i kształcenia, zmniejszenie kosztów funkcjonowania obiektów. (Polish)
    0 references
    The project includes the implementation of thermomodernisation of 4 district public buildings: the administrative building of the Social Assistance Centre in Suchorączek, the building of laboratory diagnostics and pathological anatomy in Więcbork and the Psychological-Pedagogical Clinic building in Sępólnie Krajeński. All buildings considered are low-heat buildings and require actions to raise their standard. The implementation of the thermo-modernisation measures indicated in the proposal is necessary due to the general poor technical condition of the buildings. Thermomodernisation will complete the activity of the district in terms of exchanges and modernisation of individual sources of heat generation. The project provides for non-thermo-modernisation works consisting of the following thermo-modernisation works together with the necessary accompanying works: a) in the building of the Social Assistance Centre in Suchorączek: insulation of external walls with styrofoam, polystyrene basement floor warming, heating system rinsing: in the building of pathological anatomy: replacement of wooden carpentry with new PVC with complex glass, insulation of external walls with styrofoam boards, replacement of wooden carpentry for a new, warming of the ceiling by placing syropape plates; in the building of the medical laboratory: insulation of roof panels with mineral wool, warming of the ceiling over the cellar, replacement of window and door carpentry with a new PC, insulation of external walls; d) in the Psychological-Pedagogical Clinic building: insulation of the loft ceiling and replacement of window joinery for plastic windows. Carrying out the investment will contribute to achieving the project’s objectives such as: improve the environment, improve the health of residents, support working conditions and education, reduce the costs of operating facilities. (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.03.03.00-04-0038/16
    0 references