Extension and reconstruction of the rural common room in Zagorzyce (Q98844): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q98844 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q98844 w Polsce |
Revision as of 09:31, 29 October 2020
Project Q98844 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension and reconstruction of the rural common room in Zagorzyce |
Project Q98844 in Poland |
Statements
435,365.73 zloty
0 references
809,975.01 zloty
0 references
53.75 percent
0 references
1 August 2018
0 references
15 July 2019
0 references
GMINA RADZIEJÓW
0 references
Tytuł projektu to „Rozbudowa i przebudowa świetlicy wiejskiej w Zagorzycach”. Przedm.projektu są prace polegające na rozbud. i przeb. świetlicy wiejskiej wraz z niezbędną infrastrukturą techniczną w m. Zagorzyce.Benef. projektu jest Gmina Radziejów. Warto jednakże zaznaczyć, że ze względu na charakter inwestycji, do ostatecznych benef. należy zaliczyć użytk. świetlicy wiejskiej, tj. mieszkańców, gdyż to oni najbardziej zyskają na realizacji inwest. objętej niniejszym Wnioskiem.Projekt będzie realizowany w budynku świetlicy wiejskiej w m.Zagorzyce. Gł.problemem jest brak odpowiedniego miejsca do real. zadań społ.-kulturalnych w m. ZagorzyceGł. celem jest odp. przyst. miejsce do real. zadań społ.-kulturalnych w m. Zagorzyce. Zakres projektu obejmuje następujące działania:1. Roboty budowlane:a) Branża bud.:-Roboty rozbiórk.-Rozbud. i przebud. pomieszczeń -Wyk. konstrukcji dachu-Doc. bud.-Roboty wyk.e wewn.-Wymiana stolarki okiennej i drzwiowej-Wykonanie instalacji wewn. Wraz z ociepleniem ścian zostanie wykonana także elewacja.b) Branża elekt.:W świetlicy należy wykonać następujące instalacje:-Oświetl.-Gniazd wtyczkowych jednofazowych ogólnego przeznaczenia -Gniazd jednofazowych dla bojlerów-Zasielanie agragatu w chłodni -Gniazd trójfazowych-Zas. wentylatorów-Zas. pieców elektr.-Oświetlenie awar.-Połączenia wyrówn.-Odgrom. -Montaż ogrzewania elektr. (pieców elektrycznych)c) Branża sanit.:-Wykon. nowej instalacji wodno-kanalizacyjnej-Wykon. nowej inst. wentylacji mech.-Montaż jednego hydrantu ppoż. HP25Szczegół. zakres prac i sposób ich wykonania został przedstawiony w dok. technicznej przygot.dla projektu. W projekcie opis. w niniejszym Wn. będą wyk. wszystkie prace wynik. z dok. tech. Wnioskodawca zaplanował podjazd dla niepełnosprawnych w budynku. 2. Wyposażenie (szczegóły w zał. 5)3. Promocję proj.Zakres i harm. realizacji projektu przedstawia się następująco:1. Roboty budowlane: 08.2018-05.20192. Wyposażenie: 05.20193. Promocja projektu: 04.2019-05.2019 (Polish)
0 references
The title of the project is “Expansion and reconstruction of the rural common room in Zagorzyce”. In front of the project are works consisting of extension and alteration of the rural common room together with the necessary technical infrastructure in Zagorzyce.Benef. of the project is the Municipality of Radziejów. It is worth noting, however, that due to the nature of the investment, the final benef. should be included in the premises of the rural common room, i.e. the inhabitants, as they will benefit most from the realisation of the investment covered by this Proposal.The project will be implemented in the building of the rural common room in Zagorzyce. The problem is the lack of a suitable place for real social-cultural tasks in ZagorzyceGł. the aim is a place for real social-cultural tasks in Zagorzyce. The scope of the project covers the following activities:1. Construction works:a) Construction industry:-Robots demolition.-Expansion. and room refurbishment -List of roof structure-Doc. bud.-Robots in interior.-Replacement of window and door joinery-Made of interior installation. With the insulation of the walls will also be made facade.b) The electrification sector:In the common room the following installations should be performed:-Lighting.-Single-phase plug sockets general purpose -Single-phase sockets for boilers-Founding of agrarate in the cooler -Three-phase sockets-Feature of fans-Resources of electric furnaces-Expansion-Avar. Installation of electric heating. (electric furnaces)(c) Sanitary industry.:-Performance of a new water and sewerage installation-Executing new inst. ventilation mech.-Assembly of one fire hydrant. HP25Detailed scope of works and the way they are executed has been presented in technical documentation for the project. In the project description. in this Wn. will be issued all works of the result. with doc. tech. The applicant has planned a driveway for the disabled in the building. 2. Equipment (details in the case). 5)3. The scope and harm of the project are as follows:1. Construction work: 08.2018-05.20192. Equipment: IT’S 05.20193. Promotion of the project: 04.2019-05.2019 (English)
15 October 2020
0 references
Identifiers
RPKP.07.01.00-04-0002/18
0 references