Thermal modernisation of public buildings in the city and municipality of Jabłonczowa Pomorskie (countryside light): Construction of a public building (a community centre in Nowa Wieś) and its refurbishment and renovation, — Change in the use of parts of the public building (the community building in Lembung) to the technical room (boiler tower) and its alteration (Q98170): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. The works will be carried out in 2018. each building will increase energy efficiency above 25 %.1. insulation of external walls; replacement of input door; floor insulation on the ground; modernisation of the heating system for hot water; modernisation of the heating system with a boiler for biomass; lighti...) |
(Created claim: summary (P836): The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. Work will be carried out in 2018. Each building will increase energy efficiency above 25 %.1.The building of the rural common room in Lembarg: warming of the sloping roof; warming of the ceiling above the ground floor; warming of the outer walls; replacement of external entrance doors; floor warming on the gro...) |
||||||||||||||
Property / summary | |||||||||||||||
The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. Work will be carried out in 2018. Each building will increase energy efficiency above 25 %.1.The building of the rural common room in Lembarg: warming of the sloping roof; warming of the ceiling above the ground floor; warming of the outer walls; replacement of external entrance doors; floor warming on the ground; upgrading of heating system hot water; modernisation of the heating system with biomass boiler; replacement and installation of lighting;2.Building of the rural common room in Nowa Village: insulation of the outer wall; warming of the pedestal wall; warming of the floor on the ground; warming of non-ventilated trophode; replacement of external doors; construction of a new central heating system with boiler room technology for biomass; modernisation of hot heating system; The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. In each building there will be an increase in energy efficiency above 25 %. The planned thermal retrofitting works will improve the energy efficiency defined for final energy in relation to the operation of buildings in the following sizes (as audited): 1.Building of the village hall in Lembarg – 88.27 % 2.Building of the rural common room in Nowa Village-72.27 %. (English) | |||||||||||||||
Property / summary: The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. Work will be carried out in 2018. Each building will increase energy efficiency above 25 %.1.The building of the rural common room in Lembarg: warming of the sloping roof; warming of the ceiling above the ground floor; warming of the outer walls; replacement of external entrance doors; floor warming on the ground; upgrading of heating system hot water; modernisation of the heating system with biomass boiler; replacement and installation of lighting;2.Building of the rural common room in Nowa Village: insulation of the outer wall; warming of the pedestal wall; warming of the floor on the ground; warming of non-ventilated trophode; replacement of external doors; construction of a new central heating system with boiler room technology for biomass; modernisation of hot heating system; The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. In each building there will be an increase in energy efficiency above 25 %. The planned thermal retrofitting works will improve the energy efficiency defined for final energy in relation to the operation of buildings in the following sizes (as audited): 1.Building of the village hall in Lembarg – 88.27 % 2.Building of the rural common room in Nowa Village-72.27 %. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. Work will be carried out in 2018. Each building will increase energy efficiency above 25 %.1.The building of the rural common room in Lembarg: warming of the sloping roof; warming of the ceiling above the ground floor; warming of the outer walls; replacement of external entrance doors; floor warming on the ground; upgrading of heating system hot water; modernisation of the heating system with biomass boiler; replacement and installation of lighting;2.Building of the rural common room in Nowa Village: insulation of the outer wall; warming of the pedestal wall; warming of the floor on the ground; warming of non-ventilated trophode; replacement of external doors; construction of a new central heating system with boiler room technology for biomass; modernisation of hot heating system; The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. In each building there will be an increase in energy efficiency above 25 %. The planned thermal retrofitting works will improve the energy efficiency defined for final energy in relation to the operation of buildings in the following sizes (as audited): 1.Building of the village hall in Lembarg – 88.27 % 2.Building of the rural common room in Nowa Village-72.27 %. (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 22:56, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings in the city and municipality of Jabłonczowa Pomorskie (countryside light): Construction of a public building (a community centre in Nowa Wieś) and its refurbishment and renovation, — Change in the use of parts of the public building (the community building in Lembung) to the technical room (boiler tower) and its alteration |
Project in Poland financed by DG Regio |
Statements
401,323.49 zloty
0 references
535,098.0 zloty
0 references
75.0 percent
0 references
28 September 2016
0 references
31 January 2019
0 references
MIASTO I GMINA JABŁONOWO POMORSKIE
0 references
Termomodernizacja 2 budynków użyteczności publicznej będzie polegać na przeprowadzeniu kompleksowej termomodernizacji obejmującej głęboką modernizację energetyczną. Prace zostaną przeprowadzone w 2018 r. W każdym z budynków nastąpi zwiększenie efektywność energetycznej powyżej 25%.1.Budynek świetlicy wiejskiej w Lembargu:docieplenie dachu skośnego;docieplenie stropu nad parterem; docieplenie ścian zewnętrznych; wymiana drzwi wejściowych zewn.;docieplenie podłogi na gruncie;modernizacja systemu podgrzewania c.w.u.; modernizacja systemu ogrzewania z kotłem na biomasę; wymiana i montaż oświetlenia;2.Budynek świetlicy wiejskiej w Nowej Wsi:docieplenie ściany zewnętrznej; docieplenie ściany cokołowej; docieplenie podłogi na gruncie; docieplenie stropodachu niewentylowanego; wymiana drzwi zewnętrznych;wykonanie nowej instalacji c.o.wraz z technologią kotłowni na biomasę; modernizacja systemu podgrzewania c.w.u.; Termomodernizacja 2 budynków użyteczności publicznej będzie polegać na przeprowadzeniu kompleksowej termomodernizacji obejmującej głęboką modernizację energetyczną. W każdym z budynku nastąpi zwiększ.efektywności energetycznej powyżej 25%. Planowane prace termomodernizacyjne umożliwią poprawę efektywności energetycznej określonej dla energii końcowej w związku z eksploatacją budynków w następujących wielkościach (zgodnie z audytami): 1.Budynek świetlicy wiejskiej w Lembargu – 88,27 % 2.Budynek świetlicy wiejskiej w Nowej Wsi–72,27 %. (Polish)
0 references
The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. Work will be carried out in 2018. Each building will increase energy efficiency above 25 %.1.The building of the rural common room in Lembarg: warming of the sloping roof; warming of the ceiling above the ground floor; warming of the outer walls; replacement of external entrance doors; floor warming on the ground; upgrading of heating system hot water; modernisation of the heating system with biomass boiler; replacement and installation of lighting;2.Building of the rural common room in Nowa Village: insulation of the outer wall; warming of the pedestal wall; warming of the floor on the ground; warming of non-ventilated trophode; replacement of external doors; construction of a new central heating system with boiler room technology for biomass; modernisation of hot heating system; The thermal modernisation of 2 public buildings will consist of a comprehensive thermo-modernisation including deep energy modernisation. In each building there will be an increase in energy efficiency above 25 %. The planned thermal retrofitting works will improve the energy efficiency defined for final energy in relation to the operation of buildings in the following sizes (as audited): 1.Building of the village hall in Lembarg – 88.27 % 2.Building of the rural common room in Nowa Village-72.27 %. (English)
15 October 2020
0 references
Identifiers
RPKP.03.03.00-04-0018/17
0 references